Skip to main content
European Commission logo print header
Contenido archivado el 2022-11-21

Development of an expert system to anticipate steel break out at the mould exit

Objetivo

A real-time monitoring system to prevent breakouts is to be developed on the basis of temperature measurements along the mould wall. This system will then be incorporated in the control system of a continuous casting machine. The new feature of this system is the inductive contactless temperature measurement, which makes it possible to use monitoring systems of this kind for the casting of blooms and billets.

Convocatoria de propuestas

Data not available

Régimen de financiación

CSC - Cost-sharing contracts

Coordinador

ARBED RECHERCHES
Aportación de la UE
Sin datos
Dirección

4009 ESCH-SUR-ALZETTE
Luxemburgo

Ver en el mapa

Coste total
Sin datos