Objectif The project aims to construct and commission an integrated pilot plant consisting of a thin slab continuous caster of Mannesmann Röhrenwerke design linked to an induction furnace and a coiler. The main original feature of the plant consists of a progressive reduction of thickness in the caster from 60 mm in the oscillating mould down to 35 mm by progressive reduction in the curved part of the installation. A further reduction from 35 mm down to 15 mm will then be achieved by rolling at the straightening withdrawal stage. At the outlet speed of about 15m/min, the temperature of the hot slab will be raised 100 to 150 °C by induction coils before entering a coil box for subsequent hot rolling. The 1st phase is devoted to the engineering and the preparation for the start-up of the plant. Programme(s) ECSC-STEELDEM 2C - Programme (ECSC) "pilot and demonstration projects in the iron and steel industry", 1988-1992 Thème(s) T2 - Continuous casting Appel à propositions Data not available Régime de financement DEM - Demonstration contracts Coordinateur ACCIAIERIA I.S.P. DI CREMONA Contribution de l’UE Aucune donnée Adresse Piazza Lodi 7 26100 CREMONA Italie Voir sur la carte Coût total Aucune donnée Participants (2) Trier par ordre alphabétique Trier par contribution de l’UE Tout développer Tout réduire ITALIANA IMPIANTI P.A. Italie Contribution de l’UE Aucune donnée Adresse GENOVA Voir sur la carte Coût total Aucune donnée MANNESMANN DEMAG HUTTENTECHNIK Allemagne Contribution de l’UE Aucune donnée Adresse Franz-Schubert Strasse 1-3 47226 DUISBURG Voir sur la carte Coût total Aucune donnée