ConcEpt validatioN sTudy foR fusElage wake-filLIng propulsioN intEgration

Objective

"The CENTRELINE project aims at maximising the benefits of aft-fuselage wake-filling under realistic systems design and operating conditions. The concept realises fuselage wake-filling through a single propulsive device installed at the fuselage aft-end with the purpose to entrain and re-energise the fuselage boundary layer flow, the so-called Propulsive Fuselage Concept (PFC). The aft-fuselage propulsor is driven turbo-electrically with power supplied through generator off-takes from advanced geared turbofan engines in under-wing installation.
CENTRELINE will perform the proof of concept and initial experimental validation for a highly promising propulsion-airframe integration approach in order to mature this technology from currently TRL 1-2 to TRL 3-4. Advanced pre-design methods based on high-fidelity numerical simulation and integrated multidisciplinary design optimisation techniques will be adopted in order to produce best and balanced design solutions for the concept. The technological key features will be initially validated through physical experiments including scale-model wind tunnel testing for the overall configuration as well as specialised aerodynamic rig testing of the boundary layer ingesting aft-fuselage propulsor. The proposed research and innovation actions represent the immediate exploitation of results of the highly successful FP7 L-0 project “DisPURSAL” (GA no. 323013).
The optimised system technology concept will be eco-environmentally benchmarked against an advanced conventional reference aircraft equipped with aerodynamic, structural, power plant and systems technologies suitable for a potential Entry Into Service (EIS) year 2035, referred to as ""R2035"". The objective CO2 reductions of the concept at integrated vehicular level are -11% against the R2035 (which means –40% CO2 versus the Y2000 SRIA reference). A detailed technology roadmap will be developed, indicating how to transfer these improvements to TRL 6 in 2030."

Call for proposal

H2020-MG-2016-2017

See other projects for this call

Sub call

H2020-MG-2016-Two-Stages

Coordinator

BAUHAUS LUFTFAHRT EV
Net EU contribution
€ 802 190,00
Address
WILLY MESSERSCHMITT STRASSE 1
82024 Taufkirchen
Germany

See on map

Region
Bayern Oberbayern München, Landkreis
Activity type
Research Organisations
Links
Total cost
€ 802 190,00