Objective 1. Indicator: Integrated Cross-Functional Platform
Year 4 success criteria: Evaluation of inteGRIDy Framework and Tools Performance completed [100%]
M31-M54 achievements: -Components develop¬ment completion [100%] - Framework Components Integra¬tion [100%] -Iterative testing [100%] -Pilot Evaluation Framework and validation completed [100%]
Objective 1,3. Indicator: Availability of forecasting, prediction, scheduling & simulation tools
Year 4 success criteria: Adoption by the large-scale Pilots of selected online notification services. Achieved impact target for operability & optimum energy distribution/usage
M31-M54 achievements: -Small-scale Pilots parallel deployment with existing operating systems [100%] -Small-scale Pilots selected functions are online deployed [100%] -Large-scale Pilots parallel deployment with existing operating systems [100%]
Objective 1,4. Indicator: Algorithms for the model-based control and optimization tools
Year 4 success criteria: Successful evaluation of the effectiveness & accuracy of the actions & predictions
M31-M54 achievements: - algorithms, tool deployment at small-scale [40%] - Successful integration to small-scale pilots [100%] - Deployment at large-scale pilots; Full system integration of model predictions [100%]
Objective 1,2,3. Indicator: Availability of Cross-Domain Big data analytics
Year 4 success criteria: Evaluation of unified indicators, Successful provision of analytics
M31-M54 achievements: Successful integration to large-scale pilots - Successful integration to small-scale pilots [100%] - Successful integration to large-scale pilots [100%]
Objective 2. Indicator: Availability of models for grid, DR/DSM, storage
Year 4 success criteria: Successful accuracy to real-life grid behaviour/ response, Reach Impact assessment targets
M31-M54 achievements: - models adapted to the integrated CMP [80%] - Fine-tuning of experimental parameters [100%] - Successful usage at all pilots [100%] - Full system integration of model predictions [100%]
Objective 1,6. Indicator: Mechanisms &methods developed for decision analysis & optimization
Year 4 success criteria: Full implementation & fine-tuning to pilots environment
M31-M54 achievements: - Integration with simulation, forecasting & prediction tools [100%] - Integration with core integrated decision support platform [100%] - Successful implementation at the pilots [100%] - Fine-tuning of experimentally determined parameters [100%]
Objective 1,2,8. Indicator: Availability of Multipurpose Dashboards & HMIs
Year 4 success criteria: Deployment at large scale use cases and evaluation of behavior
M31-M54 achievements: - integration with Scalable reference architecture [100%] - Deployment at small-scale pilots [100%] - integration with analytics framework [100%] - Large-scale pilot testing [100%]
Objective 7. Indicator: Introduction of new market entrants
Year 4 success criteria: Completion & Validation of inteGRIDy’s Business Modelling [100%]
M31-M54 achievements: -Business Modelling analysis [100%]
Objective 1,8. Indicator: Percentage of integration to the field level systems of the demo sites
Year 4 success criteria: Deployment of standards-based interoperability to the use cases
M31-M54 achievements: - integration of connectors at small-scale pilot sites [100%] - integration of connectors at large-scale pilot sites [100%] - Successful Acceptance Tests (i.e. Test Cases showed no errors) [Ν/Α]
Objective 8. Indicator: Pilot Use Case Completion
Year 4 success criteria: Pilot Use Case completed. Overall Evaluation of inteGRIDy Framework [100%]
M31-M54 achievements: - Pilot area deployment planning competed [100%] - Framework tested and necessary changes identified [100%] - Simulation Environment for Multi-Purpose Alternative Scenarios [100%] - Small-Scalle Pilots Deployment Completion [100%] - Large-Scale Pilots Deployment Completion [100%]