Skip to main content
European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS

Disruptive process for the construction of railway transition zones, reducing drastically construction and maintenance costs

Objectif

When a train crosses from an embankment area to a bridge, tunnel or viaduct (transition zone), there is an abrupt change invertical stiffness, accelerating track degradations and generating vibrations. Hence, the embankment at transition zones are constructed differently to the rest of the track, using cement-treated soil to constitute a wedge shaped backfill. However, this construction is complex, uncertain and time-consuming, while not completely solving the vertical stiffness transition. Consequently, maintenance needs of transition zones are up to 6 times higher than regular tracks,requiring yearly about 471M€ (10% EU investment in track maintenance), while only accounting for 2,8% of total length.
TORRESCAMARA has developed DIGITALIA 2,an innovative solution for transition zones based on precast concrete slabsthat properly smooth vertical stiffness and maintain this performance over time, with the aim of: 1) Simplifying and speeding up the construction process, 2) Reducing costs of the construction process, 3)Reducing maintenance operation needs, and 4) Reducing the associated vibrations to improve passenger comfort.
The successful execution of Phase1 has led to the definition of a business model to deploy DIGITALIA 2 and reach EU market, establishing strategic alliances with potential stakeholders, users as well as commercial suppliers.In Phase2, our overall objective is to introduce DIGITALIA 2 in the market through the construction of an advanced demonstration element in the most complex and demanding conditions. We will also develop tools to ease and speed up the design,manufacturing and construction process. We will ensure a quick market deployment and promote the inclusion of DIGITALIA 2 in the specifications of railway infrastructure owners.
As a result, the commercialization of DIGITALIA 2 will lead to a revenue of nearly152M€ and a benefit of 13M€ by the 5th year, while saving construction managers over 98M€ in construction cost and 8M€ on maintenance.

Appel à propositions

H2020-SMEInst-2016-2017

Voir d’autres projets de cet appel

Sous appel

H2020-SMEINST-2-2016-2017

Régime de financement

SME-2 - SME instrument phase 2

Coordinateur

TORRESCAMARA Y CIA DE OBRAS SA
Contribution nette de l'UE
€ 1 527 818,60
Adresse
CL FONTETA DE SORIA 4 OLIVA
46780 VALENCIA
Espagne

Voir sur la carte

PME

L’entreprise s’est définie comme une PME (petite et moyenne entreprise) au moment de la signature de la convention de subvention.

Oui
Région
Este Comunitat Valenciana Valencia/València
Type d’activité
Private for-profit entities (excluding Higher or Secondary Education Establishments)
Liens
Coût total
€ 2 182 598,00