European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS

PLUG-N-play passive and active multi-modal energy HARVESTing systems, circular economy by design, with high replicability for Self-sufficient Districts Near-Zero Buildings

Resultado final

Risk Assessment
Market Analysis & Business Plan

Market Analysis Business Plan This report will be delivered periodically every 12 months The first version in M12 the second one in M24 the third one in M36 and the last one in month 51

Quality Assessment Plan
PLUG-N-HARVEST ADBE Advanced Design

PLUG-N-HARVEST ADBE Advanced Design. The first version of this report will be delivered in M18 and the updated version in M36.

Dissemination Activities Annual Report

Dissemination Activities Annual Report This report will be delivered periodically every 12 months The first version in M12 the second one in M24 the third one in M36 and the last one in month 51

Systems engineering requirements definition

Systems engineering requirements definition. The first version of this report will be delivered in M12 and the updated version in M30.

Active-façade CFD simulation and optimization guidelines

Active-façade CFD simulation and optimization guidelines. The first version of this report will be delivered in M15 and the updated version in M33.

Report On Life Cycle Cost Analysis

Report On Life Cycle Cost Analysis The first version of this report will be delivered in M33 and the updated version in M51

Control Safety Mechanisms

Control Safety Mechanisms. The first version of this report will be delivered in M18 and the updated version in M39.

Users Satisfaction Assessment

Assessment of Users Satisfaction according to the evaluation plan D13

Implementation at the Greek Pilot Site

Implementation at the Greek Pilot Site The first version of this report will be delivered in M39 and the updated version in M48

The Plug-N-Harvest Integrated ICT Ecosystem

A public version of Deliverable 35 Integration and Verification of IMCSOEMS for ADBE

Implementation at the German Pilot Site

Implementation at the German Pilot Site The first version of this report will be delivered in M39 and the updated version in M48

Dissemination Plans and Promotion

Dissemination Plans and Promotion. This report will be delivered/updated three times during the project. The first version in M6, the second one in M24 and the last one in month 36.

Exploitation Plans

Exploitation Plans This report will be delivered periodically every 12 months The first version in M12 the second one in M24 the third one in M36 and the last one in month 51

Evaluation Plan

Evaluation Plan. The first version of this report will be delivered in M12 and the updated version in M30.

Plug-N-Play Optimal Energy Management System (OEMS) at District/Grid Level

Plug-N-Play Optimal Energy Management System (OEMS) at District/Grid Level. The first version of this report will be delivered in M18 and the updated version in M39.

Evaluation Report

Evaluation Report The first version of this report will be delivered in M36 and the updated version in M51 in accordance to D13 Evaluation Plan

Ethical monitoring & Contingency Plans
Project Final Report
Plug-n-Play Intelligent Management and Control System (IMCS) for ADBE

Plug-n-Play Intelligent Management and Control System (IMCS) for ADBE. The first version of this report will be delivered in M18 and the updated version in M39.

Progress Periodic Management Reports

Progress Periodic Management Reports. This report will be delivered/updated three times during the project. The first version in M12, the second one in M24 and the last one in month 36.

Implementation at the British Pilot Site

Implementation at the British Pilot Site The first version of this report will be delivered in M39 and the updated version in M48

Report On Standardization Models

Report On Standardization Models This report will be delivered periodically every 12 months The first version in M12 the second one in M24 the third one in M36 and the last one in month 51

Guidelines On Circular Economy Design Delimitants And Conditioners

Guidelines On Circular Economy Design Delimitants And Conditioners The first version of this report will be delivered in M18 and the updated version in M36

Report On Environmental Impact Assessment

Report On Environmental Impact Assessment The first version of this report will be delivered in M32 and the updated version in M42

Report On Financial Business Models

Report On Financial Business Models The first version of this report will be delivered in M33 and the updated version in M51

Project Website & Social Media
Finalization of the Modular Retrofit Kit

Finalization of the Modular Retrofit Kit The first version of this report will be delivered in M21 and the updated version in M39

Project Management
Privacy and Security Components Description

Privacy and Security Components Description. The first version of this report will be delivered in M18 and the updated version in M39.

PLUG-N-HARVEST ADBE Simulative Tests Evaluation

PLUG-N-HARVEST ADBE Simulative Tests Evaluation. The first version of this report will be delivered in M18 and the updated version in M36.

End-Users and Business Requirements Report

End-Users and Business Requirements Report. The first version of this report will be delivered in M12 and the updated version in M30.

Implementation at the Spanish Pilot Site

Implementation at the Spanish Pilot Site The first version of this report will be delivered in M39 and the updated version in M48

Use Case Site Survey and Audit Report

Use Case Site Survey and Audit Report. The first version of this report will be delivered in M12 and the updated version in M30.

Data Management Plan

Data Management Plan This report will be deliveredupdated three times during the project The first version in M18 the second one in M24 and the last one in month 36

Materials Database Web Tool

Materials Database Web Tool The first version of this report will be delivered in M18 and the updated version in M36

Methodology To Check The Degree Of Compliance Of CE Principles On The Initial Stages Of Design

Methodology To Check The Degree Of Compliance Of CE Principles On The Initial Stages Of Design. The first version of this report will be delivered in M18 and the updated version in M27.

Publicaciones

Scoping low-cost measures to nowcast sub-hourly solar radiations for buildings

Autores: Chen, L., Du, H. and Li, Y.
Publicado en: 2019
Editor: Sustainable Built Environment Conference 2019

activIn: A novel Non-Intrusive Activity Inference Tool

Autores: Asimina Dimara, Stelios Krinidis, Dimitrios Tzovaras
Publicado en: 2020 International Conferences on Internet of Things (iThings) and IEEE Green Computing and Communications (GreenCom) and IEEE Cyber, Physical and Social Computing (CPSCom) and IEEE Smart Data (SmartData) and IEEE Congress on Cybermatics (Cybermatics), 2020, Página(s) 372-378, ISBN 978-1-7281-7647-5
Editor: IEEE
DOI: 10.1109/ithings-greencom-cpscom-smartdata-cybermatics50389.2020.00073

occupI: A novel Non-Intrusive Occupancy Inference Tool

Autores: Asimina Dimara, Stelios Krinidis, Dimitrios Tzovaras
Publicado en: 2020 International Conferences on Internet of Things (iThings) and IEEE Green Computing and Communications (GreenCom) and IEEE Cyber, Physical and Social Computing (CPSCom) and IEEE Smart Data (SmartData) and IEEE Congress on Cybermatics (Cybermatics), 2020, Página(s) 392-398, ISBN 978-1-7281-7647-5
Editor: IEEE
DOI: 10.1109/ithings-greencom-cpscom-smartdata-cybermatics50389.2020.00076

Circular Economy in European Rehab Projects

Autores: Anna Mestre, Amelia Cabrera
Publicado en: 2018
Editor: HolaHoop Event Symposium at Barcelona Design Center

NRG4-PRO: A NOVEL FULL INFERENCE ENGINE

Autores: Asimina Dimara, Stelios Krinidis, DImitrios Tzovaras
Publicado en: 2020
Editor: IEEE

3 H2020 Projects focused in Energetic Refurbishment in Social Housing

Autores: Anna Mestre, Amelia Cabrera
Publicado en: 2018
Editor: REhabilita Congress Week

Energy Consumption in Public Buildings - A survey in Greece

Autores: Asimina Dimara, Christos Timplalexis, Stelios Krinidis, Konstantinos Arvanitis, Dimitrios Tzovaras
Publicado en: 2020 5th International Conference on Smart and Sustainable Technologies (SpliTech), 2020, Página(s) 1-6, ISBN 978-953-290-105-4
Editor: IEEE
DOI: 10.23919/splitech49282.2020.9243738

Nowcasting methods for optimising building performance

Autores: Du, H., Bandera, C. F. and Chen, L.
Publicado en: 2019
Editor: Building Simulation 2019

COMFIT: A NOVEL INDOOR COMFORT INFERENCE TOOL

Autores: Asimina Dimara, Stelios Krinidis, Dimitrios Tzovaras
Publicado en: 2020
Editor: IEEE

PLUG-N-HARVEST: A modular facade system with integrated building technology for retrofitting

Autores: Verena Dannapfel, Tanja Osterhage, Maike Klein, Rita Streblow, Marius Vontein, Dirk Müller, Markus Kuhnhenne
Publicado en: 2018
Editor: Research Gate, Conference proceedings

Secure bootstrapping and header compression for IoT constrained networks

Autores: Jesus Sanchez-Gomez, Dan Garcia-Carrillo, Rafael Marin-Perez, Ramon Sanchez-Iborra, Antonio Fernando Skarmeta Gomez
Publicado en: 2020 Global Internet of Things Summit (GIoTS), 2020, Página(s) 1-6, ISBN 978-1-7281-6728-2
Editor: IEEE
DOI: 10.1109/giots49054.2020.9119644

Optimal Comfort Conditions in Residential Houses

Autores: Asimina Dimara, Christos Timplalexis, Stelios Krinidis, Christopher Schneider, Marco Bertocchi, Dimitrios Tzovaras
Publicado en: 2020 5th International Conference on Smart and Sustainable Technologies (SpliTech), 2020, Página(s) 1-6, ISBN 978-953-290-105-4
Editor: IEEE
DOI: 10.23919/splitech49282.2020.9243788

Integrating LPWAN Technologies in the 5G Ecosystem: A Survey on Security Challenges and Solutions

Autores: Jesus Sanchez-Gomez, Dan Garcia Carrillo, Ramon Sanchez-Iborra, Jose L. Hernandez-Ramos, Jorge Granjal, Rafael Marin-Perez, Miguel A. Zamora-Izquierdo
Publicado en: IEEE Access, Edición 8, 2020, Página(s) 216437-216460, ISSN 2169-3536
Editor: Institute of Electrical and Electronics Engineers Inc.
DOI: 10.1109/access.2020.3041057

Architecture of security association establishment based on bootstrapping technologies for enabling secure IoT infrastructures

Autores: Salvador Pérez, Dan Garcia-Carrillo, Rafael Marín-López, José L. Hernández-Ramos, Rafael Marín-Pérez, Antonio F. Skarmeta
Publicado en: Future Generation Computer Systems, Edición 95, 2019, Página(s) 570-585, ISSN 0167-739X
Editor: Elsevier BV
DOI: 10.1016/j.future.2019.01.038

The PLUG-N-HARVEST Facade: A Second Skin with Active and Passive Components

Autores: Verena Dannapfel, Tanja Osterhage, Maike Klein, Rita Streblow, Marius Vontein, Dirk Müller, Markus Kuhnhenne
Publicado en: Journal of Facade Design and Engineering, 2019, ISSN 2213-3038
Editor: TU Delft
DOI: 10.7480/jfde.2019.1.2772

Mobile Internet Security - 4th International Symposium, MobiSec 2019, Taichung, Taiwan, October 17–19, 2019, Revised Selected Papers

Autores: Dan Garcia-Carrillo, Jesus Sanchez-Gomez, Rafael Marin-Perez and Antonio Skarmeta
Publicado en: EAP-based bootstrapping for secondary service authentication to integrate IoT into 5G networks, 2020, ISBN 978-981-15-9609-4
Editor: Springer CCIS
DOI: 10.1007/978-981-15-9609-4

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles