Risultati finali
Market Analysis & Business Plan
Market Analysis Business Plan This report will be delivered periodically every 12 months The first version in M12 the second one in M24 the third one in M36 and the last one in month 51
Quality Assessment PlanPLUG-N-HARVEST ADBE Advanced Design
PLUG-N-HARVEST ADBE Advanced Design. The first version of this report will be delivered in M18 and the updated version in M36.
Dissemination Activities Annual ReportDissemination Activities Annual Report This report will be delivered periodically every 12 months The first version in M12 the second one in M24 the third one in M36 and the last one in month 51
Systems engineering requirements definitionSystems engineering requirements definition. The first version of this report will be delivered in M12 and the updated version in M30.
Active-façade CFD simulation and optimization guidelinesActive-façade CFD simulation and optimization guidelines. The first version of this report will be delivered in M15 and the updated version in M33.
Report On Life Cycle Cost AnalysisReport On Life Cycle Cost Analysis The first version of this report will be delivered in M33 and the updated version in M51
Control Safety MechanismsControl Safety Mechanisms. The first version of this report will be delivered in M18 and the updated version in M39.
Users Satisfaction AssessmentAssessment of Users Satisfaction according to the evaluation plan D13
Implementation at the Greek Pilot SiteImplementation at the Greek Pilot Site The first version of this report will be delivered in M39 and the updated version in M48
The Plug-N-Harvest Integrated ICT EcosystemA public version of Deliverable 35 Integration and Verification of IMCSOEMS for ADBE
Implementation at the German Pilot SiteImplementation at the German Pilot Site The first version of this report will be delivered in M39 and the updated version in M48
Dissemination Plans and PromotionDissemination Plans and Promotion. This report will be delivered/updated three times during the project. The first version in M6, the second one in M24 and the last one in month 36.
Exploitation PlansExploitation Plans This report will be delivered periodically every 12 months The first version in M12 the second one in M24 the third one in M36 and the last one in month 51
Evaluation PlanEvaluation Plan. The first version of this report will be delivered in M12 and the updated version in M30.
Plug-N-Play Optimal Energy Management System (OEMS) at District/Grid LevelPlug-N-Play Optimal Energy Management System (OEMS) at District/Grid Level. The first version of this report will be delivered in M18 and the updated version in M39.
Evaluation ReportEvaluation Report The first version of this report will be delivered in M36 and the updated version in M51 in accordance to D13 Evaluation Plan
Ethical monitoring & Contingency PlansProject Final Report
Plug-n-Play Intelligent Management and Control System (IMCS) for ADBE
Plug-n-Play Intelligent Management and Control System (IMCS) for ADBE. The first version of this report will be delivered in M18 and the updated version in M39.
Progress Periodic Management ReportsProgress Periodic Management Reports. This report will be delivered/updated three times during the project. The first version in M12, the second one in M24 and the last one in month 36.
Implementation at the British Pilot SiteImplementation at the British Pilot Site The first version of this report will be delivered in M39 and the updated version in M48
Report On Standardization ModelsReport On Standardization Models This report will be delivered periodically every 12 months The first version in M12 the second one in M24 the third one in M36 and the last one in month 51
Guidelines On Circular Economy Design Delimitants And ConditionersGuidelines On Circular Economy Design Delimitants And Conditioners The first version of this report will be delivered in M18 and the updated version in M36
Report On Environmental Impact AssessmentReport On Environmental Impact Assessment The first version of this report will be delivered in M32 and the updated version in M42
Report On Financial Business ModelsReport On Financial Business Models The first version of this report will be delivered in M33 and the updated version in M51
Project Website & Social MediaFinalization of the Modular Retrofit Kit
Finalization of the Modular Retrofit Kit The first version of this report will be delivered in M21 and the updated version in M39
Project ManagementPrivacy and Security Components Description
Privacy and Security Components Description. The first version of this report will be delivered in M18 and the updated version in M39.
PLUG-N-HARVEST ADBE Simulative Tests EvaluationPLUG-N-HARVEST ADBE Simulative Tests Evaluation. The first version of this report will be delivered in M18 and the updated version in M36.
End-Users and Business Requirements ReportEnd-Users and Business Requirements Report. The first version of this report will be delivered in M12 and the updated version in M30.
Implementation at the Spanish Pilot SiteImplementation at the Spanish Pilot Site The first version of this report will be delivered in M39 and the updated version in M48
Use Case Site Survey and Audit ReportUse Case Site Survey and Audit Report. The first version of this report will be delivered in M12 and the updated version in M30.
Data Management Plan This report will be deliveredupdated three times during the project The first version in M18 the second one in M24 and the last one in month 36
Materials Database Web Tool The first version of this report will be delivered in M18 and the updated version in M36
Methodology To Check The Degree Of Compliance Of CE Principles On The Initial Stages Of Design. The first version of this report will be delivered in M18 and the updated version in M27.
Pubblicazioni
Autori:
Chen, L., Du, H. and Li, Y.
Pubblicato in:
2019
Editore:
Sustainable Built Environment Conference 2019
Autori:
Asimina Dimara, Stelios Krinidis, Dimitrios Tzovaras
Pubblicato in:
2020 International Conferences on Internet of Things (iThings) and IEEE Green Computing and Communications (GreenCom) and IEEE Cyber, Physical and Social Computing (CPSCom) and IEEE Smart Data (SmartData) and IEEE Congress on Cybermatics (Cybermatics), 2020, Pagina/e 372-378, ISBN 978-1-7281-7647-5
Editore:
IEEE
DOI:
10.1109/ithings-greencom-cpscom-smartdata-cybermatics50389.2020.00073
Autori:
Asimina Dimara, Stelios Krinidis, Dimitrios Tzovaras
Pubblicato in:
2020 International Conferences on Internet of Things (iThings) and IEEE Green Computing and Communications (GreenCom) and IEEE Cyber, Physical and Social Computing (CPSCom) and IEEE Smart Data (SmartData) and IEEE Congress on Cybermatics (Cybermatics), 2020, Pagina/e 392-398, ISBN 978-1-7281-7647-5
Editore:
IEEE
DOI:
10.1109/ithings-greencom-cpscom-smartdata-cybermatics50389.2020.00076
Autori:
Anna Mestre, Amelia Cabrera
Pubblicato in:
2018
Editore:
HolaHoop Event Symposium at Barcelona Design Center
Autori:
Asimina Dimara, Stelios Krinidis, DImitrios Tzovaras
Pubblicato in:
2020
Editore:
IEEE
Autori:
Anna Mestre, Amelia Cabrera
Pubblicato in:
2018
Editore:
REhabilita Congress Week
Autori:
Asimina Dimara, Christos Timplalexis, Stelios Krinidis, Konstantinos Arvanitis, Dimitrios Tzovaras
Pubblicato in:
2020 5th International Conference on Smart and Sustainable Technologies (SpliTech), 2020, Pagina/e 1-6, ISBN 978-953-290-105-4
Editore:
IEEE
DOI:
10.23919/splitech49282.2020.9243738
Autori:
Du, H., Bandera, C. F. and Chen, L.
Pubblicato in:
2019
Editore:
Building Simulation 2019
Autori:
Asimina Dimara, Stelios Krinidis, Dimitrios Tzovaras
Pubblicato in:
2020
Editore:
IEEE
Autori:
Verena Dannapfel, Tanja Osterhage, Maike Klein, Rita Streblow, Marius Vontein, Dirk Müller, Markus Kuhnhenne
Pubblicato in:
2018
Editore:
Research Gate, Conference proceedings
Autori:
Jesus Sanchez-Gomez, Dan Garcia-Carrillo, Rafael Marin-Perez, Ramon Sanchez-Iborra, Antonio Fernando Skarmeta Gomez
Pubblicato in:
2020 Global Internet of Things Summit (GIoTS), 2020, Pagina/e 1-6, ISBN 978-1-7281-6728-2
Editore:
IEEE
DOI:
10.1109/giots49054.2020.9119644
Autori:
Asimina Dimara, Christos Timplalexis, Stelios Krinidis, Christopher Schneider, Marco Bertocchi, Dimitrios Tzovaras
Pubblicato in:
2020 5th International Conference on Smart and Sustainable Technologies (SpliTech), 2020, Pagina/e 1-6, ISBN 978-953-290-105-4
Editore:
IEEE
DOI:
10.23919/splitech49282.2020.9243788
Autori:
Jesus Sanchez-Gomez, Dan Garcia Carrillo, Ramon Sanchez-Iborra, Jose L. Hernandez-Ramos, Jorge Granjal, Rafael Marin-Perez, Miguel A. Zamora-Izquierdo
Pubblicato in:
IEEE Access, Numero 8, 2020, Pagina/e 216437-216460, ISSN 2169-3536
Editore:
Institute of Electrical and Electronics Engineers Inc.
DOI:
10.1109/access.2020.3041057
Autori:
Salvador Pérez, Dan Garcia-Carrillo, Rafael Marín-López, José L. Hernández-Ramos, Rafael Marín-Pérez, Antonio F. Skarmeta
Pubblicato in:
Future Generation Computer Systems, Numero 95, 2019, Pagina/e 570-585, ISSN 0167-739X
Editore:
Elsevier BV
DOI:
10.1016/j.future.2019.01.038
Autori:
Verena Dannapfel, Tanja Osterhage, Maike Klein, Rita Streblow, Marius Vontein, Dirk Müller, Markus Kuhnhenne
Pubblicato in:
Journal of Facade Design and Engineering, 2019, ISSN 2213-3038
Editore:
TU Delft
DOI:
10.7480/jfde.2019.1.2772
Autori:
Dan Garcia-Carrillo, Jesus Sanchez-Gomez, Rafael Marin-Perez and Antonio Skarmeta
Pubblicato in:
EAP-based bootstrapping for secondary service authentication to integrate IoT into 5G networks, 2020, ISBN 978-981-15-9609-4
Editore:
Springer CCIS
DOI:
10.1007/978-981-15-9609-4
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile