European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS

Port IoT for Environmental Leverage

Resultado final

APIs and documentation for software extension

Technical specification of developed methods and services Both API and other softwarerelated documentation will be in a standardised format permitting particular deployments to access the software adequately Associated task T64 T65 and T66

Communication support material (leaflet, poster and video)

The facts and background of PIXEL in accessible language. The leaflet, poster and video will be updated on M18 and on M36. Associated task: T9.1

PIXEL Models v1

This deliverable includes a description of the overall methodology for the environmental management of the port and a description of the models algorithms and numerical methods selected for each task These models will be presented in a standardized notation to define precisely the methodology Associated task T41 T42 T43 and T44

Predictive Algorithms v1

Deliverable document will contain the development of new prediction and forecasting algorithms in the ports where the need is greatest: to allocate energy in more efficient way and to forecast the infrastructure needs and trend of environmental pollution in the ports. For different sectors within ports there are different requirements and thus various predictive models/algorithms will be constructed to include different conditions. The proposed algorithms will be applied using available data measurements to test their performance and forecasting quality. Associated task: T4.5.

PIXEL data acquisition, information hub and data representation v2

This deliverable will be the main asset of software documentation of the project including data sources collecting mechanisms technologies protocols the operational analytics engine and tools and the visualization and notification module First release will include the report about software mechanisms for data acquisition and description of the performance of a service in the port area Furthermore the first release is expected to include a technological state of art a short description of the technology developed and the software itself Second version the design of integrated information system the theoretical representation of data and the requirements will be described Generically first version will contain software prototypes while the second will provide the final products Associated task T64 T65 and T66

Virtual Presence

Creation of Social Network Profiles (Twitter, LinkedIn, and Facebook); and the web site. Associated task: T9.1.

PIXEL data acquisition, information hub and data representation v1

This deliverable will be the main asset of software documentation of the project, including data sources, collecting mechanisms, technologies, protocols, the operational analytics engine and tools and the visualization and notification module – First release will include the report about software mechanisms, for data acquisition and description of the performance of a service in the port area. Furthermore, the first release is expected to include a technological state of art, a short description of the technology developed and the software itself. Second version, the design of integrated information system, the theoretical representation of data and the requirements will be described. Generically, first version will contain software prototypes while the second will provide the final products. Associated task: T6.2, T6.3, T6.4, T6.5 and T6.6.

PIXEL Models v2

This deliverable includes a description of the overall methodology for the environmental management of the port and a description of the models algorithms and numerical methods selected for each task These models will be presented in a standardized notation to define precisely the methodology Associated task T41 T42 T43 and T44

Predictive Algorithms v2

Deliverable document will contain the development of new prediction and forecasting algorithms in the ports where the need is greatest to allocate energy in more efficient way and to forecast the infrastructure needs and trend of environmental pollution in the ports For different sectors within ports there are different requirements and thus various predictive modelsalgorithms will be constructed to include different conditions The proposed algorithms will be applied using available data measurements to test their performance and forecasting quality Associated task T45

Project Management Report v2

Periodical management report summarizing the development and particularities of the Project Management These deliverables will include the risk policy forecasted and detected risks and the mitigation measures Associated task T21 T22 T23 and T24

Report on dissemination activities and Update of the Dissemination Plan v2

This periodic deliverable will keep track of the dissemination activities performed in each period eg conferences assisted articles published deliverables released and made accessible etc The production of this document will reinforce the innovative and disruptive character of the project reviewing the impactachieving and explaining the adoption and global recognition of PIXEL partial advances Associated task T91 T92 and T93

PEI Definition and Algorithms v2

This deliverable will include a manual which will detail the methodology for PEI adoption and algorithms for computing PEI In addition a windows based software will be developed for PEI computation tracking and reporting Associated task T53

PEI Definition and Algorithms v1

This deliverable will include a manual which will detail the methodology for PEI adoption and algorithms for computing PEI. In addition, a windows based software will be developed for PEI computation, tracking and reporting. Associated task: T5.3

PIXEL Information system architecture and design v1

This document, released in two versions (preliminary architecture and final architecture), will report about all the analysis and design activities performed to precisely specify the implementation tasks. Associated task: T6.1.

Project Management Report v4

Periodical management report summarizing the development and particularities of the Project Management These deliverables will include the risk policy forecasted and detected risks and the mitigation measures Associated task T21 T22 T23 and T24

PEI Manual for adoption in ports and guidelines for environment and society

This deliverable will provide an overview and analysis of the currently applied metrics for assessing the ports overall environmental performance in the EU28 countries leading to a set of adoption guidelines Besides this document will provide guidelines for assessing and minimising a ports PEI having the society as the focus stakeholder Associated task T54 and T55

Evaluation Plan

This document will present the evaluation plan to be used for guiding PIXEL’s impact assessment activities. Associated task: T8.1

Integration Report v1

This document will report about the integration activities in two versions. It will include test plans (individual, module and integration), the different integration environments (lab, real scenario, real data). It will report of all the pilot integration activities including technical, organizational and operational aspects. Associated task: T7.1, T7.2, T7.3, T7.4, T7.5 and 7.6

Technical Evaluation v2

This document will present the results of performance costs user acceptance and security evaluation Associated task T82

PIXEL Requirements Analysis

State of the art review and the stakeholders and market analysis regarding PIXEL technologies and solutions. This deliverable will include an Analysis of the state of the art of port environmental issues, how they affect ports depending on their kind of activities, the present-day solutions covering these issues and their impact in each PIXEL use-case. Associated task: T3.4.

Technical Evaluation v1

This document will present the results of performance costs user acceptance and security evaluation Associated task T82

Project Management Report v1

Periodical management report summarizing the development and particularities of the Project Management. These deliverables will include the risk policy, forecasted and detected risks and the mitigation measures. Associated task: T2.1, T2.2, T2.3 and T2.4.

Data Management Plan v2

This Deliverable will include information required in the Guidelines for Data Management in Horizon 2020. Associated task: T2.5

Dissemination Plan

This deliverable will reflect and formalize the events, scientific actions and industrial dissemination planned. In this document, a comprehensive description of the PIXEL’s role in every industrial niche, scientific forum and public exposure in order to maximize both innovation and impact. Associated task: T9.1, T9.2, T9.3 and T9.4.

Stakeholders and market analysis report

State of the art review and the stakeholders and market analysis regarding PIXEL technologies and solutions. This deliverable will include an Analysis of the state of the art of port environmental issues, how they affect ports depending on their kind of activities, the present-day solutions covering these issues and their impact in each PIXEL use-case. Associated task: T3.1.

Use cases and scenarios manual v1

Definition of use cases and different scenarios to deploy the PIXEL proposal. Every use-case definition will be accompanied by documentation devoted to gather every regulatory aspect related to the ports regarding the scope of the project, especially those referring to the pilots. Associated task: T3.2 and T3.3.

Report on Dissemination activities and Update of the Dissemination Plan v1

This periodic deliverable will keep track of the dissemination activities performed in each period (e.g. conferences assisted, articles published, deliverables released and made accessible, etc.). The production of this document will reinforce the innovative and disruptive character of the project, reviewing the impact-achieving and explaining the adoption and global recognition of PIXEL partial advances. Associated task: T9.1, T9.2, T9.3 and T9.4.

Project Management Report v5

Periodical management report summarizing the development and particularities of the Project Management Thesedeliverables will include the risk policy forecasted and detected risks and the mitigation measures Associated taskT21 T22 T23 and T24

PIXEL external evaluation and proof of concep report

This document will summarize the external assessment on PIXELs proof of concept and future RD potential It will be a reference document both for the goodness of the project and for use in dissemination and communication activities Associated task T83 and T84

Data Management Plan v1

will include information required in the Guidelines for Data Management in Horizon 2020. Associated task: T2.5.

Environmental factors and mapping to pilots

This deliverable will include a set of well-defined environmental aspects of port operations and the respective KPIs. Also the application of PEI to ports with a discussion of the opportunities and constraints for PEI adoptions. Associated task: T5.1 and T5.2.

PIXEL Information system architecture and design v2

This document, released in two versions (preliminary architecture and final architecture), will report about all the analysis and design activities performed to precisely specify the implementation tasks. Associated task: T6.1.

Data Management Plan v3

This Deliverable will include information required in the Guidelines for Data Management in Horizon 2020 Associated task T25

Use cases and scenarios manual v2

Definition of use cases and different scenarios to deploy the PIXEL proposal. Every use-case definition will be accompanied by documentation devoted to gather every regulatory aspect related to the ports regarding the scope of the project, especially those referring to the pilots. Associated task: T3.2 and T3.3.

Project Management Report

Periodical management report summarizing the development and particularities of the Project Management These deliverables will include the risk policy forecasted and detected risks and the mitigation measures Associated task T21 T22 T23 and T24

Integration Report v2

This document will report about the integration activities in two versions It will include test plans individual module and integration the different integration environments lab real scenario real data It will report of all the pilot integration activities including technical organizational and operational aspects Associated task T71 T72 T73 T74 and T75

Pilots and Cross Pilot Collaboration Report

This deliverable will be the reflection of the work conducted in T76 and T77 and will be also devoted to compare the results of the pilots and depict the usefulness of the interaction effected between them

Publicaciones

Machine Learning based System for Vessel Turnaround Time Prediction

Autores: Dejan Stepec, Tomaz Martincic, Fabrice Klein, Daniel Vladusic, Joao Pita Costa
Publicado en: 2020 21st IEEE International Conference on Mobile Data Management (MDM), 2020, Página(s) 258-263, ISBN 978-1-7281-4663-8
Editor: IEEE
DOI: 10.1109/mdm48529.2020.00060

Vessel and Port Efficiency Metrics through Validated AIS data

Autores: Tomaz Martincic, Dejan Stepec, Joao Pita Costa, Kristijan Cagran, Athanasios Chaldeakis
Publicado en: Global Oceans 2020: Singapore – U.S. Gulf Coast, 2020, Página(s) 1-6, ISBN 978-1-7281-5446-6
Editor: IEEE
DOI: 10.1109/ieeeconf38699.2020.9389112

SMALL AND MEDIUM PORTS’ ACTIVITIES MODELLING: INTRODUCTION TO THE PIXEL APPROACH

Autores: ERWAN SIMON, CHARLES GARNIER, IGNACIO LACALLE, JOAO PITA COSTA, CARLOS E. PALAU
Publicado en: Maritime Transport, 2019, Página(s) 149-163, ISBN 9781-784663476
Editor: WIT Press
DOI: 10.2495/mt190141

Enabling Industrial Data Space Architecture for Seaport Scenario

Autores: David Sarabia-Jacome, Ignacio Lacalle, Carlos E. Palau, Manuel Esteve
Publicado en: 2019 IEEE 5th World Forum on Internet of Things (WF-IoT), 2019, Página(s) 101-106, ISBN 978-1-5386-4980-0
Editor: IEEE
DOI: 10.1109/wf-iot.2019.8767216

Interoperability of IoT Platforms applied to the transport and logistics domain

Autores: D. Yacchirema, R. Gonzalez-Usach, M. Esteve, C.E. Palau
Publicado en: Transport Research Arena 2018, 2018
Editor: TRA
DOI: 10.5281/zenodo.1451428

Flow-Based Programming Interoperability Solution for IoT Platform Applications

Autores: Andreu Belsa, David Sarabia-Jacome, Carlos E. Palau, Manuel Esteve
Publicado en: 2018 IEEE International Conference on Cloud Engineering (IC2E), 2018, Página(s) 304-309, ISBN 978-1-5386-5008-0
Editor: IEEE
DOI: 10.1109/ic2e.2018.00059

ADVANTAGE OF A GREEN AND SMART PORT OF THE FUTURE

Autores: JOAO PITA COSTA, IGNACIO LACALLE, MIGUEL A. LLORENTE, OLIVIER LE BRUN, LEONIDAS PTSIKAS, GILDA DE MARCO, CHARLES GARNIER, ERWAN SIMON, ALEX GHERGHINA, ORESTIS TSOLAKIS, DEJAN ŠTEPEC, SERGIO VIVO, RAFAEL VAÑO, STJEPAN PILIČIĆ, TEODORA MILOŠEVIĆ, MATIJA ŠIROKA, FABRICE KLEIN, STEFANO BEVILACQUA, TAMARA CORSANO, CINZIA NINZATTI, ATHANASIOS CHALDEAKIS, GRIGORIS DIMITRIADIS, LUKA TRAVEN, FLAVIO
Publicado en: Urban and Maritime Transport XXVII, 2021, Página(s) 203-217, ISBN 9781784664336
Editor: WIT Press
DOI: 10.2495/ut210171

Seaport Data Space for Improving Logistic Maritime Operations

Autores: David Sarabia-Jacome, Carlos E. Palau, Manuel Esteve, Fernando Boronat
Publicado en: IEEE Access, Edición 8, 2020, Página(s) 4372-4382, ISSN 2169-3536
Editor: Institute of Electrical and Electronics Engineers Inc.
DOI: 10.1109/access.2019.2963283

Influence of meteorological conditions on noise dispersion in the Port of Thessaloniki

Autores: Stjepan Piličić, Igor Kegalj, Eirini Tserga, Teodora Milošević, Roberto Žigulić, Ante Skoblar, Luka Traven
Publicado en: Noise Mapping, Edición 7/1, 2020, Página(s) 135-145, ISSN 2084-879X
Editor: De Gruyter
DOI: 10.1515/noise-2020-0012

A novel approach for assessing the ports’ environmental impacts in real time – The IoT based port environmental index

Autores: Matija Široka, Stjepan Piličić, Teodora Milošević, Ignacio Lacalle, Luka Traven
Publicado en: Ecological Indicators, Edición 120, 2021, Página(s) 106949, ISSN 1470-160X
Editor: Elsevier BV
DOI: 10.1016/j.ecolind.2020.106949

Air Pollution Dispersion Modeling in Port Areas

Autores: Teodora Milošević, Lado Kranjčević, Stjepan Piličić, Marko Čavrak, Igor Kegalj, Luka Traven
Publicado en: Journal of Maritime & Transportation Science, Edición 3 10.18048/20.00.01 https://hrcak.srce.hr/index.php?show=toc&id_broj=19019/3, 2020, Página(s) 157-170, ISSN 1848-9052
Editor: Journal of Maritime & Transportation Science
DOI: 10.18048/2020.00.12.

Framework and Methodology for Establishing Port-City Policies Based on Real-Time Composite Indicators and IoT: A Practical Use-Case

Autores: Ignacio Lacalle, Andreu Belsa, Rafael Vaño, Carlos E. Palau
Publicado en: Sensors, Edición 20/15, 2020, Página(s) 4131, ISSN 1424-8220
Editor: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/s20154131

Model of calculating a composite environmental index for assessing the impact of port processes on environment: a case study of container terminal

Autores: Igor Kegalj, Luka Traven, Juraj Bukša
Publicado en: Environmental Monitoring and Assessment, Edición 190/10, 2018, ISSN 0167-6369
Editor: Kluwer Academic Publishers
DOI: 10.1007/s10661-018-6965-z

Noise Pollution – Introduction to the State of the Research and the Implementation in the Horizon 2020 Project Pixel

Autores: Stjepan Piličić, Luka Traven, Teodora Milošević, Igor Kegalj, Ante Skoblar, Roberto Žigulić
Publicado en: Journal of Maritime & Transportation Science, Edición 3 10.18048/20.00.01 https://hrcak.srce.hr/index.php?show=toc&id_broj=19019/3, 2020, Página(s) 133-145, ISSN 1848-9052
Editor: Journal of Maritime & Transportation Science
DOI: 10.18048/2020.00.11.

Interoperability in IoT

Autores: Regel Gonzalez-Usach, Diana Yacchirema, Carlos Palau
Publicado en: Handbook of Research on Big Data and the IoT, 2018
Editor: IGI Global

Buscando datos de OpenAIRE...

Se ha producido un error en la búsqueda de datos de OpenAIRE

No hay resultados disponibles