During the technical feasibility study planned for the SPEED-EU project, the device was designed, constructed and optimized. Furthermore, an intensive campaign of experimental measures was carried out, aimed at validating and updating the model.
The full list of activities required to produce the individual items of the prototype device version 5 has been analysed in order to highlight the investment requirements to start-up the production.
Moreover, the detailed production costs for a single device has been estimated.
The analysis of the target market went through: 1) the study of the world railway market, to identify market volume and future forecasts, trends, market accessibility per geographies; and 2) the direct verification of the product with respect to the needs of the railway infrastructure managers, through the involvement of Mr. Eric Fontanel, the project coach assigned by EC, to reach and interview high level experts who are either active or retired head of technical departments of railway infrastructure managers from different countries.