European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS

Integrated multi-vector management system for Energy isLANDs

Livrables

Pilot and system integration test plan and test report

Test plan with specific cases to be tested for each pilot This deliverable is related to tasks 53 and 54

Pilot and system specifications

This report describes the technical details of test sites collected in T51 Reference to both type of appliances technical infrastructure and local grid topology will be made Focus on local production existing demandresponse programs and storage new loads will be addressed The report will also treat business aspects related to retail pricing tariffs consumption levels load profiles services available and other things that affect the daytoday operation

Exploitation plans for E-LAND tools and policy recommendations

Report with generic business models identified for key stakeholders using business model innovator tool and exploitation plan for different tools developed in the project Report will further provide policy recommendations This deliverable is related to tasks 74 and 76

Privacy, security and safety

A risk register including all identified risks their evaluation against the risk acceptance criteria identified barriers of nonacceptable risks and status on validation of barriers This deliverable is related to task 47

Visualization software prototype

Software that will be used for visualizing the projects KPIs and generating associated reports This deliverable is related to task 46

First pilot results

Including the initial results from the pilot testing and will possibly include minor suggestions to adjustments and change in course of the pilots if need be This deliverable is related to tasks 61 and 62

Final Common Impact model

The project aims at developing a Common Impact Model as a sociological approach to establish a sound model for future endeavours with customer engagement and a special communications strategy to secure sustained engagement of the local community These measures will be documented and analysed in D24 5 as it is often seen that when a project ends the engagement ends The D24 5 will document the measures and initiatives taken to secure this will not happen in ELand and document and calibrate the Common Impact Model in practice This deliverable is related to task 24 and 25

Second dissemination and communication report

This report shows the communications and dissemination activities until M32 done in T813 and it is an upgraded version of D84

Business model innovator framework

Report explaining the business model innovator and method to use the framework This deliverable is related to task 73

Dissemination and communication final report

This report shows the communications and dissemination activities until the end of the project done in T813 and it is an upgraded version of D85

System communication plan

This plan contains a description of the quality of service and the communication use cases analyzed during T52 that will be needed by the head system The complete functional and technical documentation of the API functions will also be stated

Functional and operational requirements

Report describing functional and operational requirements for software components engaged in the use cases of D3.1. This deliverable is related to task 3.2.

Final Pilot Results

Final piloting results This deliverable is related to tasks 61 and 62

Market and stakeholder analysis

Report providing current market review and stakeholder. The report will identify obstacles to the innovation and means to overcome them. This deliverable is related to task 7.1

Pilot and system implementation plan

This report defines investment plan and a suggested methodprogression for installation for each pilot It also includes the technical and businesses KPIs and their values specification detailed processes and time frame analysed in T51This analysis will further lead to a suggested investment plan and a suggested methodprogression for installation The deliverable also exposes the data collection agreements from pilots from T52

Toolbox description and Replication guidelines

This deliverable describes a final and comprehensive toolbox and guide for realising economically viable sustainable and reliable energy islands

Sustained engagement plan and impact evaluation

The sustained engagement in a community is dependent on a strong foundation of ambassadors who can carry on the activities which is implemented The engagement plan suggests the necessary means to accomplish this and seeks to implement the ones which are possible within the scope and budget of the project The sustained engagement recommendations is furthermore build into the Common Impact Model which is developed as part of WP2The results or impact of the activities carried out in WP2 are evaluated in accordance with the targets set up in T22 This deliverable is related to task 22 and task 23

Final Project Report

The Consortium shall submit a final report to the EC within 60 days after the end of the project This final report shall comprise a final publishable summary report covering the results conclusions and socioeconomic impact of the project This deliverable is related to task 13

First dissemination and communication report

This report shows the communications and dissemination activities until M16 done in T8.1-3

Open Access Data

This deliverable is related to consortiums aim to participate in the Open Access Data Pilot and includes the data needed to validate the results presented in scientific publications In addition to this the Consortium considers aims to involve data produced in pilots in Europe and in India While aiming at making data from pilots available the Consortium will seek to protect the commercial interests of participating beneficiaries and will respect European and national privacy and security regulations Open availability of data produced in pilots will be evaluated pilot by pilot This deliverable is related to tasks 61 and 62

Project website and social network profiles

The website will be available in a public URL with a name related to the project and a basic structure able to explain the goals targets Consortium etc having a space for updating the evolution of the project This deliverable corresponds to T82

Communications strategy and engagement tools

Based on the Community analysis report the first communications strategy and communication elements will be introduced. Rewards and incentive mechanisms need to be part of the strategy, even though other measures will also have a significant value and position. The first strategy will be ready in month 7, but it is crucial for the project to be aware of the fact, that engagement is always a process in development. Hence to develop a communications kit in the beginning of the project, which aims at informing and engaging customers throughout the project is lost cause - and at best a waste of money. Hence the strategy and the tools will continue development as part of the interaction with the community and a final documentation of the tools being used and their impact ratio will be ready in the end of the project at M42. This deliverable is related to task 2.2.

Publications

Influence of occupant presence patterns on energy consumption and its relation to comfort: a case study based on sensor and crowd-sensed data

Auteurs: Robert Rusek; Joaquim Melendez Frigola; Joan Colomer Llinas
Publié dans: Energy Sustainability And Society, 2022, vol. 12, art.núm. 13, Numéro 7, 2022, ISSN 2192-0567
Éditeur: BioMedCentral (BMC)
DOI: 10.1186/s13705-022-00336-6

Unlocking the value of digitalization for the European energy transition: A typology of innovative business models

Auteurs: Moritz Loock
Publié dans: Energy Research & Social Science, Numéro 69, 2020, Page(s) 101740, ISSN 2214-6296
Éditeur: Elsevier Limited
DOI: 10.1016/j.erss.2020.101740

Assessment of the potential of local solar generation for providing ship shore power in the Norwegian harbour Port of Borg

Auteurs: Farhan Farrukh; Ciara Dunks; Martha Hoffmann; Per Olav Dypvik
Publié dans: 2022 18th International Conference on the European Energy Market (EEM), Numéro 3, 2022, ISSN 2165-4093
Éditeur: IEEE
DOI: 10.1109/eem54602.2022.9921031

EV drivers’ willingness to accept smart charging: Measuring preferences of potential adopters

Auteurs: Merla Kubli
Publié dans: Transportation Research Part D: Transport and Environment, Numéro Volume 109, August 2022, 2022, Page(s) 103396, ISSN 1361-9209
Éditeur: Pergamon Press Ltd.
DOI: 10.1016/j.trd.2022.103396

Energy Research and Innovation Discourses, Applications, and Future Directions: A Review and Case Discussions from National and International Projects

Auteurs: Belay, Alemu Moges; Tuiskula, Heidi
Publié dans: TechConnect Briefs 2022, Numéro 2, 2022, ISSN 1405-7743
Éditeur: TechConnect Briefs
DOI: 10.5281/zenodo.6683627

ASSESSMENT OF A DATA CENTER MICROGRID WITH STORAGE AND PHOTOVOLTAIC GENERATION

Auteurs: DORIN DACIAN LET, IOAN ALIN BUCURICA, ION VALENTIN GURGU, LAURENTIU STANCU, ANDREEA MIHAELA LET, GIORGIAN MARIUS IONITA
Publié dans: Journal of Science and Arts, Numéro Year 19, No. 4(49), pp. 1067-1076, 2019, 2019, Page(s) 1067-1076, ISSN 1844-9581
Éditeur: University of Targoviste

Multi-state techno-economic model for optimal dispatch of grid connected hydrogen electrolysis systems operating under dynamic conditions

Auteurs: G. Matute, J.M. Yusta, J. Beyza, L.C. Correas
Publié dans: International Journal of Hydrogen Energy, Numéro 46/2, 2021, Page(s) 1449-1460, ISSN 0360-3199
Éditeur: Pergamon Press Ltd.
DOI: 10.1016/j.ijhydene.2020.10.019

Multi-vector energy management system including scheduling electrolyser, electric vehicle charging station and other assets in a real scenario

Auteurs: J. Massana, L. Burgas, S. Herraiz, J. Colomer
Publié dans: Journal of Cleaner Production, Numéro Volume 380, Part 2, 2022, ISSN 0959-6526
Éditeur: Elsevier BV
DOI: 10.1016/j.jclepro.2022.134996

Definition of Residential Power Load Profiles Clusters Using Machine Learning and Spatial Analysis

Auteurs: Mario Flor; S. Herraiz; Ivan Contreras
Publié dans: Energies, 2021, vol. 14, núm. 20, p. 6565, Numéro 3, 2021, ISSN 1996-1073
Éditeur: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en14206565

Flexibility management of electric vehicles based on user profiles: The Arnhem case study

Auteurs: Marc Cañigueral, Joaquim Meléndez
Publié dans: International Journal of Electrical Power & Energy Systems, Numéro 133, 2021, Page(s) 107195, ISSN 0142-0615
Éditeur: Elsevier BV
DOI: 10.1016/j.ijepes.2021.107195

Investment planning in multi-vector energy systems: Analysis of key performance indicators

Auteurs: Martha Hoffmann, Sanket Puranik, Marc Juanpera, José M Martín-Rapún, Heidi Tuiskula, Philipp Blechinge
Publié dans: CIRED conference proceedings, 2020
Éditeur: CIRED
DOI: 10.5281/zenodo.4449969

Optimal investments into rooftop solar and batteries for a distribution grid company and prosumers: A case study in India

Auteurs: Sanket Puranik; Martha M. Hoffmann; Farhan Farrukh; Sunil Sharma
Publié dans: 2022 IEEE 7th International Energy Conference (ENERGYCON), Numéro 21886223, 2022
Éditeur: IEEE
DOI: 10.1109/energycon53164.2022.9830341

Multi-vector energy optimization tools for energy islands

Auteurs: Sanket Puranik, Heidi Tuiskula, Iliana Ilieva, Ferran Torrent, Joan Colomer, Joaquim Melendez
Publié dans: 2019 IEEE Milan PowerTech, 2019, Page(s) 1-6, ISBN 978-1-5386-4722-6
Éditeur: IEEE
DOI: 10.1109/ptc.2019.8810932

Risk And Security Practices: Experiences From The E-LAND Project

Auteurs: Coralie Esnoul, Silje Arendt Olsen, Bjørn Axel Gran, Xueli Gao, Per-Arne Jørgensen, John Eidar Simensen
Publié dans: Proceedings of the 30th European Safety and Reliability Conference and 15th Probabilistic Safety Assessment and Management Conference (ESREL2020 PSAM15), 2020, Page(s) paper 5023, ISBN 978-981-14-8593-0
Éditeur: RESEARCH PUBLISHING
DOI: 10.3850/978-981-14-8593-0_5023-cd

Safety and Security Impacts on Integrated Use of Li-On Batteries in an Energy Island

Auteurs: Bjorn Axel Gran, Coralie Esnoul, Julia Wind, Preben J.S. Vie, Torleif Lian
Publié dans: 2021 IEEE PES/IAS PowerAfrica, 2021, Page(s) 194-198, ISBN 978-1-6654-3142-2
Éditeur: IEEE
DOI: 10.1109/powerafrica52236.2021.9543384

Development of the Risks from the Design of the E-LAND Solution to the Implementation

Auteurs: Coralie Esnoul, Bjørn Axel Gran
Publié dans: Proceedings of the 32nd European Safety and Reliability Conference (ESREL 2022), 2022, Page(s) R27-04-487, ISBN 978-981-18-5183-4
Éditeur: RESEARCH PUBLISHING, SINGAPORE
DOI: 10.3850/978-981-18-5183-4_r27-04-487-cd

The Common Impact Model: a Standarized Methodology for Community Acceptance of Decarbonized Multivector Local Energy Systems

Auteurs: Beatrice Petrovich; Bonnie Murphy; Thomas Mikkelsen; Minna Kuivalainen
Publié dans: Ecocity World Summit 2021 Conference Proceedings, Numéro 11, 2022
Éditeur: Research Platform Alexandria
DOI: 10.5281/zenodo.7251896

Risk Assessment in the E-LAND Project

Auteurs: Xueli Gao, Coralie Esnoul, Silje Arendt Olsen, Per-Arne Jørgensen, Bjørn Axel Gran
Publié dans: Proceedings of the 30th European Safety and Reliability Conference and 15th Probabilistic Safety Assessment and Management Conference (ESREL2020 PSAM15), 2020, Page(s) paper 5072, ISBN 978-981-14-8593-0
Éditeur: RESEARCH PUBLISHING
DOI: 10.3850/978-981-14-8593-0_5072-cd

THE IMPLEMENTATION OF MULTI-ENERGY SYSTEMS: POLICY AND REGULATORY IMPLICATIONS

Auteurs: Iliana Ilieva; Sanket Puranik; Farhan Farrukh; Mirza Haider
Publié dans: CIRED 2021 - The 26th International Conference and Exhibition on Electricity Distribution, Numéro 21478769, 2021, Page(s) 978-1-83953-591-8
Éditeur: IET
DOI: 10.1049/icp.2021.1672

Feasibility of a micro grid scale up at campus level - Case study

Auteurs: Dorin Let, Bogdan Ionut Tene, Adela Gabriela Husu, Mihai-Florin Stan, Laurentiu Marian Stancu, Andreea Let
Publié dans: ECAI 2019 - International Conference – 11th Edition, 2019, ISBN 978-1-7281-1624-2
Éditeur: IEEE
DOI: 10.1109/ecai46879.2019.9041969

Addressing Risks and challenges for the pilot sites installing the E-LAND solution

Auteurs: Coralie Esnoul, Bjørn Axel Gran
Publié dans: The 31st European Safety and Reliability Conference (ESREL 2021) procceedings, 2021, Page(s) paper 569, ISBN 978-981-18-2016-8
Éditeur: Research Publishing
DOI: 10.3850/978-981-18-2016-8_569-cd

Addressing Cybersecurity in Energy Island

Auteurs: Per-Arne Jørgensen; Xueli Gao; Bjørn Axel Gran; Silje Arendt Olsen; Coralie Esnoul
Publié dans: Proceedings of the 30th European Safety and Reliability Conference and the 15th Probabilistic Safety, 2019, Page(s) paper 5428, ISBN 978-981-14-8593-0
Éditeur: Research Publishing (S) Pte. Ltd
DOI: 10.3850/978-981-14-8593-0_5428-cd

Recherche de données OpenAIRE...

Une erreur s’est produite lors de la recherche de données OpenAIRE

Aucun résultat disponible