Skip to main content
European Commission logo print header

Safe architecture for Robust distributed Application Integration in roLling stock 2

Deliverables

Requirements of LTE Equipment and ETBNs for wireless TCMS

Requirements of LTE equipment for integration in train backbone and ETBNs to deal with wireless train inauguration will be also addressed. First version in M4; final version in M8

Drive-by-Data Demonstrator Support Report

Report on the on-site and off-site support to the two demonstrators and the technical validation of the performance of the components and the networked system.

LTE Equipment under Challenging Wireless Scenarios

This report will include detailed study of the impact of LTE D2D for wireless Train Backbone Communications in challenging conditions. It will include a description of the test scenarios, the KPIs and the evaluation results.

Advanced Wireless Technologies and Applications for Wireless TCMS

This report will describe several advanced wireless technologies for wireless TCMS. More specifically, it will detail in the first place the architecture and system supporting the integration of the Wireless TCMS with the Wireless Train Backbone Communications, including a common specification supporting each individual system requirement and architecture. The architecture of the wireless extension to the DbD concept will also be analyzed, including performance evaluation. The deliverable will also describe the benefits of 5G technologies for Wireless TCMS in terms of communication (capacity/reliability), management (Slicing, Orchestration), including standardizations, as well as an overview of virtual coupling requirements, state-of-art wireless technologies, and recommendation of the most suitable technology, including small scale performance evaluations. An interim version for review by the CFM project will be released on M28

Project quality plan

The project quality plan (the project handbook) constitutes a set of project templates, explanations on the project management process, review process, quality checks, meeting organisation, which is communicated to all partners.

Drive-by-Data Requirements Specification

Refinement of performance, availability and safety requirements of ETBN, consist switches and end-nodes based on the inputs from the Safe4RAIL and CONNECTA projects for Drive-by-Data.

Wireless Consist Network Report

This report will propose a harmonized architecture for the future wireless consist network supporting the integration of various wireless technologies, and respecting their individual requirements. An interim version will be released for the CFM project on M8 with an State-of-the-Art review of wireless technologies for WLCN.

Report on requirements for integration of HVAC into the Functional Distribution Framework and Simulation Framework

This report includes the requirements to address the integration of TCMS functions into FDF and SF. Particularly, considering the HVAC Application Profile defined by CFM members; it would be applied to the HVAC system.

Conclusions on integration of subsystems into FDF and SF

This report will include conclusions on the integration of a train application into FDF and SF. A methodology for development of train applications on FDF and for integration into SF will be provided based on experience gained in Task 3.3 and Task 3.4 and on the support given to the CFM project to perform a successful system validation.

Final report on Dissemination & Communication activities

This report includes the dissemination and communication activities as well as reports on the executed activities. An interim version of this deliverable “Initial report and updated plan on Dissemination & Communication activities” will be released as an internal report in M15, with a record of the activities related to dissemination that have been undertaken in the first 15 months and those still planned as well as a report of completed and planned communication activities. The interim version of this deliverable is under the responsibility of TEC.

Internal and external IT communication infrastructure and project website

The external IT communication infrastructure constitutes a guideline for communication of the Safe4RAIL-2 project to external target groups including conferences, marketing measures and communication channels. Furthermore, this deliverable constitutes the launch of the internal Safe4RAIL-2 communication infrastructure including the establishment of mailing lists, a subversion repository server and the Safe4RAIL-2 website.

Publications

Applicability of 5G Technology for a Wireless Train Backbone

Author(s): Pedro Aljama, Aitor Arriola, Imanol Martínez, Iñaki Val, Igor López, Julio Manco, Jérôme Härri
Published in: Proceedings of 15th European Conference on Antennas and Propagation (EuCAP) 2021, 2021
Publisher: IEEE
DOI: 10.23919/eucap51087.2021.9411492

Prototyping V2X Applications in Large-Scale Scenarios using OpenAirInterface

Author(s): Julio Manco, Guillermo Gallud Baños, Jérôme Härri, Miguel Sepulcre
Published in: 2020 IEEE Vehicular Networking Conference (VNC), 2021, ISSN 2157-9857
Publisher: IEEE
DOI: 10.1109/vnc51378.2020.9318327

Safe4RAIL-2: Advanced architectures and components for the Next-Generation Train Control and Monitoring System

Author(s): Aitor Arriola, Mario Münzer, Arjan Geven, Jordi Pujol, Henrik Envall, Jérôme Härri, Núria Mata and Reinhard Aigner
Published in: Proceedings of 8th Transport Research Arena TRA 2020, 2020
Publisher: Safe4RAIL-2

Wireless Technologies for the Next-Generation Train Control and Monitoring System

Author(s): Jerome Harri, Aitor Arriola, Pedro Aljama, Igor Lopez, Uwe Fuhr, Marvin Straub
Published in: 2019 IEEE 2nd 5G World Forum (5GWF), 2019, Page(s) 179-184, ISBN 978-1-7281-3627-1
Publisher: IEEE
DOI: 10.1109/5gwf.2019.8911648

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available