European Commission logo
français français
CORDIS - Résultats de la recherche de l’UE
CORDIS

High powEr density FC System for Aerial Passenger VEhicle fueled by liquid HydrogeN

Livrables

HEAVEN 6-monthly newsletters 2

These deliverables will include the newsletters generated every 6 months about the advances of the project and other related information.

Report on HEAVEN publications and participation on conferences and fairs

This deliverable will include information about all the publications and participation on conferences and fairs of HEAVEN project.

Public Results of WP4

This deliverable contains the main results of the WP4 regarding system coupling that can be published without IPR conflicts.

HEAVEN report on content generation 2

This deliverable will report the generated content during the last 12 months with except of the newsletter that are separately reported in other deliverables

HEAVEN internet activity and impact report 1

This deliverable will include information of the activity of the project in the different internet channels such as visitors of the webpage (related to country, origin of search, etc.), number and profile of followers in the social networks and impact on the news. With this information, an analysis of the outreach and relevance of the project can be derived with different KPIs.

HEAVEN report on content generation 3

This deliverable will report the generated content during the last 12 months with except of the newsletter that are separately reported in other deliverables

Main results of the system integration and demonstration

This deliverable contains the main results of the WP5 regarding system integration and demonstration that can be published without IPR conflicts.

HEAVEN 6-monthly newsletters 8

These deliverables will include the newsletters generated every 6 months about the advances of the project and other related information

HEAVEN social media presence

This deliverable will describe the creation of the different social media profiles and the different methodology for the generation of content for the different audiences

Main results of the hydrogen fuel system

This deliverable contains the main results of the WP3 regarding hydrogen fuel system that can be published without IPR conflicts

HEAVEN 6-monthly newsletters 7

These deliverables will include the newsletters generated every 6 months about the advances of the project and other related information

Main results of the system architecture

This deliverable contains the main results of WP1 regarding the system architecture that can be published without conflicts of IPR.

HEAVEN 6-monthly newsletters 1

These deliverables will include the newsletters generated every 6 months about the advances of the project and other related information.

HEAVEN 6-monthly newsletters 6

These deliverables will include the newsletters generated every 6 months about the advances of the project and other related information

HEAVEN report on content generation 4

This deliverable will report the generated content during the last 12 months with except of the newsletter that are separately reported in other deliverables

HEAVEN 6-monthly newsletters 3

These deliverables will include the newsletters generated every 6 months about the advances of the project and other related information.

Main results of the fuel cell development

This deliverable contains the main results of the WP2 regarding fuel cell development that can be published without IPR conflicts.

HEAVEN report on content generation 1

This deliverable will report the generated content during the last 12 months with except of the newsletter that are separately reported in other deliverables

Market analysis

This deliverable contains the analysis of the current market for the technology application.

HEAVEN corporative brand

This deliverable will describe all the design and development of the HEAVEN corporative brand.

HEAVEN 6-monthly newsletters 4

These deliverables will include the newsletters generated every 6 months about the advances of the project and other related information.

HEAVEN 6-monthly newsletters 5

These deliverables will include the newsletters generated every 6 months about the advances of the project and other related information.

HEAVEN internet activity and impact report 2

This deliverable will include an update of the internet activity of the project

Recherche de données OpenAIRE...

Une erreur s’est produite lors de la recherche de données OpenAIRE

Aucun résultat disponible