Skip to main content
Ir a la página de inicio de la Comisión Europea (se abrirá en una nueva ventana)
español es
CORDIS - Resultados de investigaciones de la UE
CORDIS

Competitive Wave Energy on Islands

Periodic Reporting for period 7 - Wavepiston (Competitive Wave Energy on Islands)

Período documentado: 2023-08-01 hasta 2024-03-31

"Pre-installation": Two energy collectors assembled
Illustration of the Wavepistron WEC 4
Illustration of the Wavepistron WEC 1
"Pre-installation": Two energy collectors launching at water 2
Illustration of the Wavepistron WEC 2
Illustration of the Wavepistron WEC 3
Full-scale Wavepiston string installed at PLOCAN test site in Gran Canaria
"Pre-installation": Two energy collectors launching at water 1
"Pre-installation" system at the PLOCAN test site in Gran Canaria
Mi folleto 0 0