Skip to main content
Aller à la page d’accueil de la Commission européenne (s’ouvre dans une nouvelle fenêtre)
français fr
CORDIS - Résultats de la recherche de l’UE
CORDIS

Competitive Wave Energy on Islands

Periodic Reporting for period 7 - Wavepiston (Competitive Wave Energy on Islands)

Période du rapport: 2023-08-01 au 2024-03-31

"Pre-installation": Two energy collectors assembled
Illustration of the Wavepistron WEC 4
Illustration of the Wavepistron WEC 1
"Pre-installation": Two energy collectors launching at water 2
Illustration of the Wavepistron WEC 2
Illustration of the Wavepistron WEC 3
Full-scale Wavepiston string installed at PLOCAN test site in Gran Canaria
"Pre-installation": Two energy collectors launching at water 1
"Pre-installation" system at the PLOCAN test site in Gran Canaria
Mon livret 0 0