Periodic Reporting for period 1 - SmartBuild (A real-time adaptive projected augmented reality of 3D blueprints on top of the physical construction site that improves both productivity and safety)
Reporting period: 2019-02-01 to 2019-06-30
Between the years 1945 and 2005, the productivity in the construction industry has grown a meagre 6%; only a small fraction of the growth that happened in similar industries, such as manufacturing. This is about to change as the market for the digitalization of the construction eco-system is growing exponentially from $24 Million in 2006 to $480 Million in 2017 at a growth rate of 31% per year and is expected to be over $5.8 Billion by 2025 according to Mckinsey. In addition, a recently published international standard (ISO 29481) for digital Building Information Modeling (BIM) is going to disrupt the construction industry as they will be mandatory by 2020 in several leading European countries.
The objective of the work presented, was to assess the needs and requirements of the market and to validate the suggested solution by Lightyx.
The goal of this project was a feasibility examination of a fully functional prototype, in a construction site alongside with a comprehensive business plan as detailed in the “Description of work section” of the approved proposal. To accomplish this goal, the company have established pilots with leading construction companies and tested the technology, while at the same time received real time feedback from key players in the industry.
In this feasibility report we have identified the characteristics of the existing solutions used today and the limitations of each one of them. Based on the needs of the market, we have formulated the specification of the add-on and have redesigned the initial prototype to meet said requirements. In addition, based on interviews with leading key-players in the market, LightYX has identified that the ideal customer for the company. The entry usecase, and the onsite requirement, are different than the one initially targeted and therefore precipitated technology improvements including additional sensors, components, slightly different product architecture and definition to achieve the same goals.
Based on the work done during the SME Instrument Phase 1, we believe that this is the perfect time to enter the market as the market for the digitalization of the construction eco-system is set to grow hyperbolically as mention in the Mckinsey report above.