Interoperable solutions for implementing holistic FLEXIbility services in the distribution GRID

Deliverables

Dissemination and communication plan - Month 6

This deliverable corresponds to Task 9.1. This deliverable explains how the project will communicate its developments and outcomes, and how the consortium will ensure visibility of the project and dissemination of its results throughout its duration. The main outcomes will be a plan identifying a set of dissemination activities to be implemented and a general communication strategy to follow during the project lifetime. The document will be updated during the project at months 18 and 36

Business model development - Month 24

This deliverable belongs to Task 83 and it will contain starting from the background that each project partner includes for the project execution all the agreements on IPR of the results achived throughout the project This will be a living document that will be updated during the project

Publishable report on physical architecture developments

Deliverable containing all the publishable results and conclusiones on the phsyical architecture developments obtained during the whole duration of WP3 next generation of Secondary Substations smart meters Energy Box and MV Protections

Demonstration and monitoring plan

Delileverabel 61 will include in a report a plan for the successful deployment of the innovative interventions the four Demosites to prove the feasibility and interoperability of the solutions developed The report will also include a monitoring plan to gather the data during the demonstration campaing The monitoring plan will include the deployment commissioning operation maintenance and removal strategies for the demo sites

Publishable report on FLEXIGRID interoperability environment

Deliverable including a summary of the publishable rport on FLEXIGRID interoperability environment

Business model development - Month 12

This deliverable related to Task 8.1 - WP8 will collect the different business models for each of the use cases that will be triggered by the project execution. These business models will evaluate the pros and cons of implementing them depending on different boundary conditions and demo-sites. The deliverable will include the exploitation routes of the innovations developed in the FLEXIGRID project. The deliverable will be updated during the project at month 24, 36 and 48.

RRI progress report-Month 24

First update of D25 at month 24

Demo-sites description and boundary conditions report

This deliverable is presented as a report which will include a list of parameters for the demo-sites characterization. These parameters will be defined during Task 2.1 and will cover different type of categories such as technical, environmental, normative and regulatory as well as socioeconomic. Parameters will be grouped by type and associated with quantifiable indicators allowing a benchmarking of demo-sites and linked to Task 2.3. Additionally, this report will include the modelling of the 4 grids related to the 4 demo-sites.

Mid-term dissemination and communication report

This report linked to Task 91 and Task 92 describes the promotional and dissemination activities conducted during the first 24 months of the project It provides an overview of different tools used for communication and promotional purposes new materialstools created during this period overall dissemination performance in the different channels among other relevant results such as participation in events and publications

Report on modules progress achieved

Deliverable 47 will consist of a report summarising the progress achieved during the module development described in the previous deliverables performed within Task 4

Project synergies report - Month 36

First update of the Project Synergies Report at month 36

RRI progress report-Month 12

This report linked to Task 2.4 will include a summary of the Responsible Research and Innovation practices which will be used during FLEXIGRID project to ensure the project considers important aspects such as public engagement, open access, gender, ethics, education, governance and science educaiton, promoting institutional change among partners to adopt RRI approach. This will be a living document that may change depending on the project needs during its whole lifecycle.

Dissemination and communication plan - Month 36

Second update of the dissemination and communication plan month 36

Stakeholders’ common requirements report

This deliverable related to Task 2.2 will compile in a report the stakeholders´ needs and expectations putting in relevance the importance of the citizens´ role in Europe when developing FLEXIGRID solutions.

Business model development - Month 36

Second update of the business model development report at month 36

FLEXIGRID KPIs panel

This report will summarised a specific set of KPIs which will be defined during Task 2.3 to evaluate the innovation and effectiveness of FLEXIGRID solutions during the duration of the project. Additionally, possible solutions and bakcup plans for optimisation and troubleshooting will also be considered.

Dissemination and communication plan - Month 18

First update of the dissemination and communication plan - month 18

RRI progress report- Month 36

Second update of D25 at month 36

Project synergies report - Month 24

This deliverable is the outcome of Task 93 The main outcome of this document is to set the basis of the collaborations with the BRIDGE initiative and other relevant EU funded projects This deliverable will be updated during the life of the project at month 36 and 48

Project website

This deliverable will contain the main features that the website of the FLEXIGRID project will contain.

FLEXIGRID’s visual materials and identity set - Month 18

First update of the visual materials and identity set at month 18

FLEXIGRID’s visual materials and identity set - Month 6

The main outcome of this deliverable, related to Task 9.2 will be the materials to be developed such as leaflets, posters, roll-ups, etc. It will also include the project identity set. The materials will be developed during the whole duration of the project and updated at month 18, 36 and 48

Searching for OpenAIRE data...

Publications

Influence of Negative Sequence Injection Strategies on Faulted 2 Phase Selector Performance

Author(s): M. T. Villén, M. P. Comech, E. Martinez Carrasco, A. A. Prada Hurtado
Published in: Energies, 2022, ISSN 1996-1073
Publisher: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en15166018

Techniques to Locate the Origin of Power Quality Disturbances in a Power System: A Review

Author(s): R. Martinez, P. Castro, A. Arroyo, M. Mañana, N. Galan, F. S. Moreno, S. Bustamante, A. Laso
Published in: Sustainability, 2022, ISSN 2071-1050
Publisher: MDPI Open Access Publishing
DOI: 10.3390/su14127428

A comparative between IEEE and EN in the transformer derating when supplying nonsinusoidal load current. A practical case

Author(s): A. Laso, R. Martínez, M. Mañana, D. Cervero, J.A. Sáez
Published in: Renewable Energy and Power Quality Journal, 18, 2020, Page(s) 747-752, ISSN 2172-038X
Publisher: EA4EPQ
DOI: 10.24084/repqj18.487

A Methodology for the Calculation of Typical Gas Concentration Values and Sampling Intervals in the Power Transformers of a Distribution System Operator

Author(s): Sergio Bustamante, Mario Manana, Alberto Arroyo, Raquel Martinez, Alberto Laso
Published in: Energies, 13/22, 2020, Page(s) 5891, ISSN 1996-1073
Publisher: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en13225891

Determination of Transformer Oil Contamination from the OLTC Gases in the Power Transformers of a Distribution System Operator

Author(s): Sergio Bustamante, Mario Manana, Alberto Arroyo, Alberto Laso, Raquel Martinez
Published in: Applied Sciences, 10/24, 2020, Page(s) 8897, ISSN 2076-3417
Publisher: MDPI
DOI: 10.3390/app10248897

Hybrid Forecast and Control Chain for Operation of Flexibility Assets in Micro-Grids

Author(s): H. Mirtaheri, P. Macaluso, M. Fantino, M. Efstratiadi, S. Tsakanikas, P. Papadopoulos, A. Mazza
Published in: Energies, 2021, ISSN 1996-1073
Publisher: Multidisciplinary Digital Publishing Institute (MDPI)
DOI: 10.3390/en14217252

Impact of Renewable Energy Sources on the Protection of MV Distribution Networks

Author(s): A. Castañon, R. Cimadevilla, M. T. Villén, E. Martínez Carrasco
Published in: PAC World Conference 2022, 2022
Publisher: PAC World Conference 2022

Analytics and Optimization Techniques on Feeder Identification in Smart Grids

Author(s): L. Aranburu, A. Unzueta, M. Araceli Garín, J. I. Modroño, A. Amezua
Published in: IEEE EUROCON 2021 - 19th International Conference on Smart Technologies, 2021
Publisher: IEEE
DOI: 10.1109/eurocon52738.2021.9535580