Deliverables Documents, reports (8) Update3 of communication and awareness plan Update 3 of communication and awareness plan The project extension is taking here into account and events conferences and activities within the project will be stretched and rescheduled accordingly Update2 of communication and awareness plan Update 2 of communication and awareness plan. Report on baseline, assumptions and scope for techno-economic modelling Report on baseline for the techno-economic model, assumptions and scope. This deliverable will contain the results of Task 5.1. Assessment document of RCS barriers and enablers at EU level A mapping document on state-of-art (SoA) regulatory, standardization and certification map of the EU and its member countries, will be created. The document will consider existing testing methods, too. The results obtained will be input for WP3 and WP6 in the project. A strong interaction between the mentioned WP's, the consortium members, RSC bodies as well as to the panel group will be established right from the beginning. Communication and awareness plan Communication and awareness plan: additional information on channels, target groups and main actions to be developed in the first year of the project. The communication and awareness plan will include, at least: ▪ Identification of target groups for the communication activities ▪ Goals of the communication activity: awareness, information, indicators ▪ Channels to reach the identified targets ▪ Strategies to communicate the project to the general public and other stakeholders (target groups) and with the level considered (local, regional, national, EU, etc) ▪ Methodology and procedures: according to the requisites of the Grant Agreement (GA) and Consortium Agreement (CA), taking into account always the rules on visibility of EU funding ▪ Identification of external events, workshops ▪ Planning for project events, public activities and general informative workshops Intermediate report: key findings on potential and enablers Intermediate report key findings on potential and enablers This report will be a link between the description of the model and the initial results on potential and enablers Report on available results of the validation Report on results of the validation Final document review on specific technical, RCS barriers, enablers and innovations The final results of Task 21 and Task 22 will be compiled in this deliverable The new findings will be linked with WP3 in tasks related to update the testing facilities and therefore providing input to deliverable D35 about maintentance operation and upgrades Open Research Data Pilot (1) Data Management Plan The Data Management Plan (DMP) consist on a brief plan to define what data sets the project will generate or process, whether and how these data will be made accessible, and how they will be curated, stored and preserved. The DMP should also provide information on the measures taken to safeguard and protect sensitive data. The data management plan must address the following issues: 1. Making data Findable 2. Making data openly Accessible 3. Making data Interoperable 4. Increase data Re-use 5. Allocation of recourses and data security The data management plan will also have to specify if certain datasets remain closed and the reasons for not giving access should be given (for instance, if one of the project objectives would be jeopardised by providing open access to certain data or some of the generated data are considered sensitive, etc.). If necessary, the DMP will be updated in the Midterm Report (D1.3) and/or in the Final Report (D1.5). Publications Other (10) D4.3 Update on test results Author(s): Madina, Virginia; Aragón, Jorge; Fernandez, Dr. Ekain; Gil, Vanesa; Sanchez-Lainez; Javier Cerezo, Alberto Published in: Deliverable 4.3, 2023 Publisher: N/A DOI: 10.5281/zenodo.10213896 HIGGS_D6.3_ Pathway and proposals summary to enable wider injection of H2 in EU gas networks Author(s): Stefan Gehrmann, Michael Walter, Hiltrud Schülken, AlbertoCe-rezo Alarcón, Cristina Rodríguez Vilariño, Lola Storch de Gracia, Javier Sánchez Laínez, Vanesa Gil, Virginia Madina Arrese, Sal-vatore Oricchio Published in: Deliverable D6.3, 2023 Publisher: N/A DOI: 10.5281/zenodo.10593904 HIGGS_D6.2_Report on main interoperability and cross border issues Author(s): Stefan Gehrmann, Michael Walter, Hiltrud Schülken, Javier Sánchez,VanesaGil,Alberto Cerezo Alarcón, Cristina Rodríguez Vilariño Published in: Deliverable D6.2, 2023 Publisher: N/A DOI: 10.5281/zenodo.10593844 HIGGS_D7.6 Final summary of communication, awareness and dissemination actions Author(s): Tobias Weide, Hans Rasmusson,Javier Sánchez, Vanesa Gil Published in: Deliverable D7.6, 2023 Publisher: N/A DOI: 10.5281/zenodo.10593920 Presentation of HIGGS results at Hydrogen Dialogue 2023 conference Author(s): Felix Künkel Published in: Hydrogen Dialogue 2023, 2023 Publisher: N/A D6.1 Considerations on H2 injection potential to reach EU decarbonisation goals Author(s): Javier Sánchez, Vanesa Gil, Stephan Gerhmann, Hiltrud Schülken, Michael Walter, Cristina Rodriguez, Alberto Cerezo Published in: Deliverable 6.1, 2023 Publisher: N/A DOI: 10.5281/zenodo.10213931 Presentation of HIGGS project Author(s): Vanesa Gil Published in: "Prime movers’ group on Gas Quality and H2 handling Sub-Group 2) #2 meeting", 2021 Publisher: ENTSOG HIGGS_D4.2 Report on results of the validation Author(s): Virginia Madina, Jorge Aragón,Ekain Fernanández, Vanesa Gil, Javier Sánchez, Alberto Cerezo Published in: Deliverable D4.2, 2023 Publisher: N/A DOI: 10.5281/zenodo.10593794 HIGGS_D2.2_Assessment document of RCS barriers and enablers at EU level Author(s): Armin Bollien; Frank Dietzsch; Javier Sánchez Laínez; Hiltrud Schülken Published in: Deliverable 2.2, 2023 Publisher: N/A HIGGS_D5.1_Report on baseline, assumptions and scope for techno-economic modelling Author(s): Robin Leonhard, Christoph Steiner, Teresa Villuendas, Javier Sánchez, Alberto Cerezo, Lola Storch Published in: Deliverable 5.1, 2023 Publisher: N/A DOI: 10.5281/zenodo.7715659 Conference proceedings (5) Injection of hydrogen in high-pressure gas grids: technical, regulatory and legal aspects Author(s): Javier Sánchez-Laínez, Rodrigo Pérez, Alberto Cerezo, Virginia Madina, Michael Walter, Vanesa Gil1 Published in: 2021 Publisher: WHTC 2021 Investigation of the impact of hydrogen blends on materials and equipment of high-pressure natural gas grids - Presentation in conference Author(s): Vanesa Gil, Javier Sánchez-Laínez, Alberto Cerezo, Maria Dolores Storch de Gracia,Ekain Fernández, Virginia Madina Published in: World Congress of Chemical Engineering - WCCE, 2023 Publisher: N/A Presentation of project HIGGS Author(s): Vanesa Gil Published in: European Hydrogen Forum 2021, 2020 Publisher: European Clean Hydrogen Alliance Hydrogen In Gas GridS: a systematic validation approach at various admixture levels into high-pressure grids Author(s): Agustin Pascual Aranda Published in: 2020 Publisher: Gasnam Presentation of project HIGGS Author(s): Vanesa Gil Published in: EU Green Week, 2021 Publisher: ERIG Peer reviewed articles (1) Enabling the injection of hydrogen in high-pressure gas grids: Investigation of the impact on materials and equipment Author(s): Javier Sánchez-Laínez, Alberto Cerezo, Ma Dolores Storch de Gracia, Jorge Aragón, Ekain Fernandez, Virginia Madina, Vanesa Gil Published in: International Journal of Hydrogen Energy, Issue Volume 52, Part A, 2 January 2024, 2024, Page(s) 1007-1018, ISSN 0360-3199 Publisher: Pergamon Press Ltd. DOI: 10.1016/j.ijhydene.2023.05.220 Searching for OpenAIRE data... There was an error trying to search data from OpenAIRE No results available