CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
A document with the report of FMECA Analysis
Operational Constraints Identification Report (opens in new window)a document describing operational constraints in maintenance shops with relevance for LOCATE project
Requirements and Architecture Specification (opens in new window)A Document describing the architecture and the requirements that it implements. There will be also associated the tests to be performed as means of verification of the requirements implementation.
Available Models Assessment Report (opens in new window)Report with the assessment of existing models and simulations applicable to the project, including results from associated projects.
LOCATE Predictive Maintenance Framework (opens in new window)Description of the implementation of the LOCATE predictive maintenance framework including the integration with planned and unplanned maintenance activities comparison with the proposed system requirements and further developments required for produce a final operational system
Gender Strategy Plan (opens in new window)A plan ensuring gender equality and the consideration of any gender perspectives in the project.
Data Management Plan (opens in new window)A plan that outlines how data are to be handled both during the execution project, and after the project is completed.
Behaviour Prediction ,Simulation and Post Processing Results Report (opens in new window)A report containing the results expected as behaviour based on simulations while accessing the quality of the project results regarding predictive degradation of components
Dissemination Report and Exploitation Plan (opens in new window)This document will report all dissemination and communication actions performed during the project life and LOCATE exploitation plan
Report on Standard and Regulations (opens in new window)A document describing the research of applicable standards and regulations for the project.
Recommendations Brochure (opens in new window)This document will be a recommendations document which can be a basis of recommendations for new standards
Use Cases Description (opens in new window)A document describing the case study where the demonstrator will be implemented, including the stories, interfaces and actors involved.
Dissemination and Communication Plan (opens in new window)Detailed action plan for reaching the target audiences. It will focus on time planning of the various activities in this WP and on defining communication strategies in order to maximise the impact of the project dissemination.
Available technologies assessment report (opens in new window)A assessment of available technologies with a trade-off analysis.
Quality Assurance Plan (opens in new window)A plan ensuring that the quality of the technical aspects of the project are fulfilling the necessary criteria.
Monitoring and Thresholds Rules Specification (opens in new window)A set of specifications for thresholds and monitoring rules
Publications
Author(s):
Farouk BALOUCHI1 and Adam BEVAN1
1Institute of Railway Research, University of Huddersfield, United Kingdom
Published in:
WCRR 2022 Conference, 2022
Publisher:
WCRR
Author(s):
Mariana de Almeida Costa, Joaquim Pedro de Azevedo Peixoto Braga, António Ramos Andrade
Published in:
Measurement, Issue 165, 2020, Page(s) 108145, ISSN 0263-2241
Publisher:
Elsevier BV
DOI:
10.1016/j.measurement.2020.108145
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available