CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
A document with the report of FMECA Analysis
Operational Constraints Identification Report (se abrirá en una nueva ventana)a document describing operational constraints in maintenance shops with relevance for LOCATE project
Requirements and Architecture Specification (se abrirá en una nueva ventana)A Document describing the architecture and the requirements that it implements. There will be also associated the tests to be performed as means of verification of the requirements implementation.
Available Models Assessment Report (se abrirá en una nueva ventana)Report with the assessment of existing models and simulations applicable to the project, including results from associated projects.
LOCATE Predictive Maintenance Framework (se abrirá en una nueva ventana)Description of the implementation of the LOCATE predictive maintenance framework including the integration with planned and unplanned maintenance activities comparison with the proposed system requirements and further developments required for produce a final operational system
Gender Strategy Plan (se abrirá en una nueva ventana)A plan ensuring gender equality and the consideration of any gender perspectives in the project.
Data Management Plan (se abrirá en una nueva ventana)A plan that outlines how data are to be handled both during the execution project, and after the project is completed.
Behaviour Prediction ,Simulation and Post Processing Results Report (se abrirá en una nueva ventana)A report containing the results expected as behaviour based on simulations while accessing the quality of the project results regarding predictive degradation of components
Dissemination Report and Exploitation Plan (se abrirá en una nueva ventana)This document will report all dissemination and communication actions performed during the project life and LOCATE exploitation plan
Report on Standard and Regulations (se abrirá en una nueva ventana)A document describing the research of applicable standards and regulations for the project.
Recommendations Brochure (se abrirá en una nueva ventana)This document will be a recommendations document which can be a basis of recommendations for new standards
Use Cases Description (se abrirá en una nueva ventana)A document describing the case study where the demonstrator will be implemented, including the stories, interfaces and actors involved.
Dissemination and Communication Plan (se abrirá en una nueva ventana)Detailed action plan for reaching the target audiences. It will focus on time planning of the various activities in this WP and on defining communication strategies in order to maximise the impact of the project dissemination.
Available technologies assessment report (se abrirá en una nueva ventana)A assessment of available technologies with a trade-off analysis.
Quality Assurance Plan (se abrirá en una nueva ventana)A plan ensuring that the quality of the technical aspects of the project are fulfilling the necessary criteria.
Monitoring and Thresholds Rules Specification (se abrirá en una nueva ventana)A set of specifications for thresholds and monitoring rules
Publicaciones
Autores:
Farouk BALOUCHI1 and Adam BEVAN1
1Institute of Railway Research, University of Huddersfield, United Kingdom
Publicado en:
WCRR 2022 Conference, 2022
Editor:
WCRR
Autores:
Mariana de Almeida Costa, Joaquim Pedro de Azevedo Peixoto Braga, António Ramos Andrade
Publicado en:
Measurement, Edición 165, 2020, Página(s) 108145, ISSN 0263-2241
Editor:
Elsevier BV
DOI:
10.1016/j.measurement.2020.108145
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles