Resultado final
The deliverable of the Task 7.3 is the final report including the propositions for WG10, the description of simulation process to limit over-speed testing improvement of the method for validating a model against measurements
D20.1 Quality Plan and project Manual (se abrirá en una nueva ventana)The Quality Plan and project Manual provides the description of the quality management policy of the project describing the necessary procedures, for example guidelines or Gantt tables.
D2.4 Optimization tool for multi-functional design solutions report (se abrirá en una nueva ventana)Optimization tool for multi-functional design solutions report
D9.4 Virtual Validation & Certification Brakes: Executive Summary of Specifications (se abrirá en una nueva ventana)This deliverable provides summary of following specification developed in subtasks 9.3.1, 9.3.2 and 9.3.3 - Railway Vehicle Certification Process Specification focusing Brake Systems (including Virtual Validation & Certification)- Railway Vehicle Simulator Specification (allowing Virtual Validation & Certification)- Railway Vehicle Verification & Validation Specification (allowing to test a railway vehicle simulator against its specification)
D19.3 Dissemination and Exploitation Final activities report (se abrirá en una nueva ventana)The final activities report compares the planned activities described in D19.2 with the activities made during the project and draws conclusions for future projects (lessons learnt).
D4.3 KPI assessment report (se abrirá en una nueva ventana)KPI assessment report
D17.4 Extract Final KPI Report of TD1.7 (se abrirá en una nueva ventana)General public description of the final concepts and the benefices compared to the original ambitions.
D8.3 Concrete applications description (se abrirá en una nueva ventana)The deliverable of the Task 8.3 is the final report including the new propositions, taking into account return on experiment about what has been done in WP7.
D18.4 Fundamental work on HVAC (se abrirá en una nueva ventana)Overview on standardisation of interfacesApplicability of alternative refrigerantsRisk aspectsFirst estimation of KPI reference values and KPI-impact of CO2 HVAC unitsImprovement in the environmental footprint(Results of tasks 18.7 and 18.8)
D3.4 Assessment for the optimization tool report (se abrirá en una nueva ventana)Assessment for the optimization tool report comparing the conceptual designs derived from the optimization tool with a laboratory demonstrator.
D15.1 Specifications for Open Call S2R-OC-IP1-01-2019 (se abrirá en una nueva ventana)The members of WP15 will written a Design Brief to the Open Call to clarify expectations, deliverables and constraints and help the Open Call to start the work with any misunderstandings. This document will also define the data WP members could share with the Open Call and which data we need from the Open Call to continue our work.
D16.4 Extract Ecodesign analysis of concepts (se abrirá en una nueva ventana)Extract of the 16.1 which could be public
D9.5 Innovative Friction Pairing solutions - High level concept (se abrirá en una nueva ventana)- Innovative Friction pairing feasibility study - Market needs and new materials investigation for dust reduction focus
D4.1 Certification procedures report (se abrirá en una nueva ventana)Certification procedures report for the new generation of carbody shells including new materials
D14.4 kpi report (se abrirá en una nueva ventana)Definition of the kpi, definition, of the references to calculate the kpi and presentation of the results of the calculations or measures
D11.4 Detailed proposal on adhesion related standards changes (se abrirá en una nueva ventana)- the proposals on adhesion-related standards changes discussed by the PIVOT2 task group will be summarized within this deliverable- where applicable, additional measurements will be made to support the proposals by analysed measurement data
D20.2 Final Recommendations report for future of S2R (se abrirá en una nueva ventana)The Final Recommendations report for future of S2R compares the planned activities of Pivot-2 with the activities made during the project and draws conclusions for future projects.
D19.2 Set up a dissemination and exploitation plan for the project (se abrirá en una nueva ventana)The dissemination and exploitation plan provides the description of the planned activities of the project regarding dissemination and exploitation, i.e. preparing dissemination material, publishing papers in industry journals, exhibiting at trade fairs and participating in other events etc.)
D1.5 Optimization tool preliminary results (se abrirá en una nueva ventana)Optimization tool preliminary results applied to railway carbodies.
Evaluation of the different Technical Demonstrators, the obtained results and the benefits achieved including conclusion and recommendations.
D3.1 Talgo Demonstrator (se abrirá en una nueva ventana)Prototype demonstration in InnoTrans 2022 of Talgo Demonstrator
D17.2 Virtual prototypes for Innotrans 2022 - Interiors and Cabin (se abrirá en una nueva ventana)Virtual demonstrator to test the immersive configurator and build in real time a new layout and ambiance on board. The demonstrator will be done in Virtual Reality.
D3.3 Siemens Demonstrator (se abrirá en una nueva ventana)Siemens Demonstrator for the test campaign
D3.2 Bombardier Demonstrator (se abrirá en una nueva ventana)Bombardier Demonstrator for the test campaign
D6.1 Technical Demonstrator of HMS (se abrirá en una nueva ventana)This deliverable will include a description of the different Technical Demonstrator, the obtained results and the benefits achieved by the different systems.
D17.1 Physical prototypes for Innotrans 2022 - Interiors (se abrirá en una nueva ventana)Physical demonstrator in real size to test in real time the new interiors
Publicaciones
Autores:
Asier Alonso et al.
Publicado en:
Journal of Rail and Rapid Transit, 2023, ISSN 0954-4097
Editor:
Mechanical Engineering Publications Ltd.
Autores:
J. Larsson
Publicado en:
Journal of Sandwich Structures and Materials, 2023, ISSN 1099-6362
Editor:
SAGE Publications
Autores:
Various
Publicado en:
Revue générale des chemins de fer, Edición Monthly, 2022, ISSN 0035-3183
Editor:
Editions Hervé Chopin
Autores:
Oliver Urspruch
Publicado en:
NAFEMS, 2021
Editor:
NAFEMS
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles