CORDIS provides links to public deliverables and publications of HORIZON projects.
Links to deliverables and publications from FP7 projects, as well as links to some specific result types such as dataset and software, are dynamically retrieved from OpenAIRE .
Deliverables
Scenario and use case design (opens in new window)
Final ConOps (opens in new window)
A Final document will be delivered following iterative reviews and advice taken through validation workshops
Demand scenario specific impact analysis results (opens in new window)Vehicles and operations specificities (opens in new window)
Demand estimates Type volumes density characteristics performances Flight phases operations services and infrastructures Risks opportunities constraints and impacts
User Requirements (opens in new window)The deliverable will provide summary requirements and recommendations coming from the tasks T42 43 and 44 to enable T45 and T46 to start its work It will also include specific requirements relating to contingency and environmental constraints that may impact operations This deliverable will provide key input to the ConOps
Vehicles validation plans (opens in new window)ATM integration by phases
Vehicles use cases (opens in new window)Airspace organisation and management High level procedures Use cases and contingencies
Analysis report (opens in new window)providing information on existing and established operational concepts existing regulations and conditions common conceptual key elements of described concepts suggested evaluated resource needs executed concept validations and their results
Initial ConOps (opens in new window)The Initial ConOps will provide the outline for the final ConOps with emphasis on potential content and scope Initial consideration will be given to addressing the user requirements against ATC procedure analysis and the evaluation of the impact of new entrants on aerodromesspaceports operations departurearrival flows enroute airspace and higher airspace Additionally the identification of future functional needs of the European Network procedures systems roles and responsibilities to accommodate new entrants in higher airspace operations and transit of the ATM network including contingency management will be considered
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available