CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.
Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.
Leistungen
Scenario and use case design (öffnet in neuem Fenster)
Final ConOps (öffnet in neuem Fenster)
A Final document will be delivered following iterative reviews and advice taken through validation workshops
Demand scenario specific impact analysis results (öffnet in neuem Fenster)Vehicles and operations specificities (öffnet in neuem Fenster)
Demand estimates Type volumes density characteristics performances Flight phases operations services and infrastructures Risks opportunities constraints and impacts
User Requirements (öffnet in neuem Fenster)The deliverable will provide summary requirements and recommendations coming from the tasks T42 43 and 44 to enable T45 and T46 to start its work It will also include specific requirements relating to contingency and environmental constraints that may impact operations This deliverable will provide key input to the ConOps
Vehicles validation plans (öffnet in neuem Fenster)ATM integration by phases
Vehicles use cases (öffnet in neuem Fenster)Airspace organisation and management High level procedures Use cases and contingencies
Analysis report (öffnet in neuem Fenster)providing information on existing and established operational concepts existing regulations and conditions common conceptual key elements of described concepts suggested evaluated resource needs executed concept validations and their results
Initial ConOps (öffnet in neuem Fenster)The Initial ConOps will provide the outline for the final ConOps with emphasis on potential content and scope Initial consideration will be given to addressing the user requirements against ATC procedure analysis and the evaluation of the impact of new entrants on aerodromesspaceports operations departurearrival flows enroute airspace and higher airspace Additionally the identification of future functional needs of the European Network procedures systems roles and responsibilities to accommodate new entrants in higher airspace operations and transit of the ATM network including contingency management will be considered
Suche nach OpenAIRE-Daten ...
Bei der Suche nach OpenAIRE-Daten ist ein Fehler aufgetreten
Es liegen keine Ergebnisse vor