Building the way to Europe’s sustainable future
Buildings account for a large percentage of energy consumption and CO2 emissions. According to the European Commission's Energy Performance of Buildings Directive and the EU’s 2030 targets, newly erected buildings should be built with peak energy efficiency in mind. Therefore, it is deemed necessary to build according to the highest standards, using the best materials. EU-funded iclimabuilt aims to support small high-tech firms to scale up and cope with the increasing technological complexity, build the connection between suppliers and users, and translate research results into innovations for the building envelope's materials and technical systems. The project aims to greatly improve buildings' energy efficiency by developing the necessary materials and taking climate considerations into account to deliver Europe’s sustainable buildings of the future.
Objective
Buildings account for around 40% of total energy use and 36% of CO2 emissions in Europe . According to the recast Directive on the energy performance of buildings (EPBD) all new buildings after 2020 should reach nearly zero energy levels, meaning that they should demonstrate very low energy needs mainly covered by renewable energy sources. EU 2030 targets aim at least 40% cuts in greenhouse gas emissions (from 1990 levels), at least 32% share for renewable energy, at least 32.5% improvement in energy efficiency , and 80% reduction of greenhouse gas (GHG) emissions by 2050 . Therefore, an urgent need is present for a deep market transformation by deploying efficient materials and technologies in the construction sector to support the real implementation of nearly zero-energy/emission and plus-energy buildings with high indoor environment quality across Europe. As energy consumption of buildings depend strongly on the climate and the local weather conditions, additional aspects arise (such as environmental, technical, user experience, functional and design aspects) on the selection of the appropriate material and technical components installation for a successful implementation of nZEBs. Further, this selection of materials and design for climate should be based on a circular economy perspective considering environmental, economic and social effects along value chains. Better utilisation of products and resources via reuse-repair-recycling is essential in achieving a transformation from a linear to a circular economy model. Many of the current materials and technical systems still have varying degree of difficulty in accomplishing a circular perspective. Material and technical system development in a ZEB framework should focus on building thermal performance improvement, high quality of indoor environment according to occupants’ comfort and health needs, while reducing the emission intensity in terms of production, maintenance, assembling and operation.
Fields of science
Keywords
Programme(s)
Funding Scheme
IA - Innovation actionCoordinator
157 80 ATHINA
Greece
See on map
Participants (28)
08290 Cerdanyola Del Valles (Barcelona)
See on map
01069 Dresden
See on map
7034 Trondheim
See on map
7491 Trondheim
See on map
501 15 Boras
See on map
4200-465 Porto
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
1030 SCHAERBEEK
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
G1 1XQ Glasgow
See on map
Participation ended
CB1 7EG Cambridge
See on map
21073 Hamburg
See on map
20014 San Sebastian
See on map
3065 Lemesos
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
80686 Munchen
See on map
10129 Torino
See on map
50018 Zaragoza
See on map
9080 Lochristi
See on map
10117 Tallin
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
2860 SOEBORG
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
8093 Zurich
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
72100 Cittadella Della Ricerca Brindisi
See on map
95050 Konstantynow Lodzki
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
CB4 0WS Cambridge
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
12307 Berlin
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
B15 2TT Birmingham
See on map
182 33 A.I. RENTIS
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
04277 Leipzig
See on map
S1 2JE SHEFFIELD
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
78180 Montigny Le Bretonneux
See on map