Hybrid Battery energy stoRage system for advanced grid and beHInd-de-meter Segments

CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.

Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .

Resultado final

HYBRIS project website (se abrirá en una nueva ventana)

The first version of the project website will be launched in M3. The initial version of the website will be focused on explaining the project objectives and creating awareness. It will be updated throughout the project with news, information about project advances and publications (including public deliverables) produced by the project. Deliverable linked with Task 7.2, Subtask 7.2.1.

HYBRIS workshop series and training (se abrirá en una nueva ventana)

This deliverable will specify the scheduling and approach for all HYBRIS workshops and training series. Deliverable linked with Task 7.2, Subtask 7.2.2.

HYBRIS public communication materials (se abrirá en una nueva ventana)

Public communication materials include the creation of the project corporative identity branding and the elaboration of a poster project presentation brochure and newsletter These materials will be taken as a basis for the elaboration of future communication materials including the project videos Deliverable linked with Task 72 Subtask 721

Second Year Progress Report (se abrirá en una nueva ventana)

A report on the progress carried out during the project’s second year, including technical progress in all Work Packages as well as deliverables submitted, in anticipation of the Second Periodic Report. This Deliverable is linked with Task 8.1.

D7.2 v1 Standardisation landscape and applicable standards (se abrirá en una nueva ventana)

This document includes the analysis of the applicable standardization landscape. It provides useful information for the development of the project and its work packages, by identifying the existing standards and technologies and the ongoing developments (at European and international levels) in the fields related with HYBRIS. This analysis of the standardization landscape includes the identification of the related standardization committees and organizations involved. Deliverable linked with Task 7.1, Subtask 7.1.3.

First Risk and contingency plan (se abrirá en una nueva ventana)

A first version of a risk management mitigation and contingency plan developed by the consortium in order to mitigate risks and to ensure contingency to follow the innovative research work at its best during project lifetime This deliverable is linked with Task 83

Validation tests repor (se abrirá en una nueva ventana)

Report with results of the tests and their respective analyses by HYBRIS partners. This deliverable corresponds with Task 5.4

KPIS evaluation and Lessons Learnt (se abrirá en una nueva ventana)

Evaluation of the KPIs after HYBRIS System’s operation analysis and comparison with KPIs set in Deliverable 1.2, including comments on the problems found, solutions sought, etc. This deliverable is linked with Task 6.5.

Preliminary Report on Eco-design, sustainability, energy storage and material safety assessment (se abrirá en una nueva ventana)

Based on the technical and regulatory KPIs and requirements, this deliverable aims at guiding chemistry, materials, and technology selections. It will provide a comprehensive list of environmental criteria that the prototype should follow within its development and the critical points on which scientific partners should focus the ensure the best possible sustainability. The deliverable refers to Task 1.5.

Implementation and Evaluation Plan for HYBRIS Demonstration (se abrirá en una nueva ventana)

Definition of the technical requirement and activities needed in order to be able to compare and assess the performance of the building before and after renovation. This deliverable is linked with Task 6.1

Requirements and specifications (se abrirá en una nueva ventana)

Requirements and specifications of both LTO and ORFB batteries will be provided as well as Electrical electronics communication and mechanical characteristics useful as inputs for the design of the batteries in WP2 Finally first assumptions on the technical hybridization and of the overall performance of the hybrid will be also provided as input for WP3 and WP4 This task corresponds with Task 11

HESS Control system validation report (se abrirá en una nueva ventana)

Information system for the EMS based on the work performed in WP3 and as defined in T4.2, and cloud-level control algorithm development and integration in the ILECO SaaS solution. This deliverable corresponds with Task 4.5

D7.2 v2 - Standardization landscape and applicable standards (se abrirá en una nueva ventana)

Extended verion of previous D7.2 v1. Additionally, it includes a strategy for HYBRIS' contribution to standardization and a description of the types of standard documents which could be implemented.

Third Year Progress Report (se abrirá en una nueva ventana)

A report on the progress carried out during the project’s third year, including technical progress in all Work Packages as well as deliverables submitted, in anticipation of the final 2nd Periodic Report. This Deliverable is linked with Task 8.1.

First Year Progress Report (se abrirá en una nueva ventana)

A report on the progress carried out during the projects first year including technical progress in all Work Packages as well as deliverables submitted in anticipation of the First Periodic Report This Deliverable is linked with Task 81

HESS Use Case definition and Specifications (se abrirá en una nueva ventana)

The development of use cases and specifications for control simulations will be provided in this deliverable. Fine-tuning the model and benchmarking its performance in two separate emulation environments is part of the deliverable in order to provide a complete validation of the model. This deliverable corresponds with Task 4.1

Levelized Cost of Storage (LCOS) analysis (se abrirá en una nueva ventana)

This deliverable is directly linked to task 1.5. and more precisely to subtask 1.5.5. A general comparative analysis with different current hybrid energy storage technologies will be performed in order to provide a preliminary overview of the project feasibility and show a major efficiency of HYBRIS prototype. This deliverable corresponds with Task 1.5

Final Risk and contingency plan (se abrirá en una nueva ventana)

A final version of a risk management, mitigation and contingency plan developed by the consortium in order to mitigate risks and to ensure contingency to follow the innovative research work at its best during project lifetime. This deliverable is linked with Task 8.3.

High-level concept of the hybrid energy storage and the requirements of each technology (se abrirá en una nueva ventana)

The initial concept design and specification of the hybridenergystorage holistically and individually will be provided in this report This deliverable corresponds with Task 21

HESS prototype (se abrirá en una nueva ventana)

Demonstration of the capabilities of the HESS prototype developed at the HESStec site by means of hardware-in-the-loop and model-based testing and validation, prior to physical testing. The demonstration and the report have the purpose of proving that HESS prototype meets the main requirements and specifications defined in D1.1. and has a satisfactory pass rate for all KPIs defined in D1.2. This deliverable corresponds with Tasks 5.2 and 5.3.