ENERGY SAVING POLLUTION CONTROL FOR STENTER MACHINES

Objetivo

To demonstrate the effectiveness of novel air cleaning equipment in the removal of atmospheric pollutants given off by all types of Stenter machine, whilst at the same time recovering a minimum 50 % of the energy used in their operation.
The objectives of the project have been successfully achieved, in that the expected levels of energy recovery and pollutant removal have been attained.
Detailed figures from the independent monitoring organisations will be available in the final report, but the Contractor's own tests show energy recovery levels in excess of 55%, whilst pollutant removal efficiencies are better than 95 % for both hydrocarbons and particulate.
Apart from the delays arising from a late decision by the Host company to require heat recovery in the form of hot water, rather than hot return air for the fourth Stenter, which involved a new chimney stack and external ductwork, the only technical problem which arose concerned the two-bay Pegg Whiteley machine.
It is most unusual to find a two-bay Stenter machine used for pad dyeing and setting, and the carryover of dyestuff and water vapour from this machine was such as to soften and shorten the life of the high efficiency particulate arrest filter medium used with the dry system. This problem was resolved by replacing the dry system with a patented, re-circulatory wet scrubbing machine, designed by the Contractors, which would be available in the unlikely event that similar problems arise in the future.
Despite the over-run of the project in both time and money terms, the system can now be seen to be successful in both technical and economic areas, with a pay back period, including filter replacement, of less than two years.
Two, new types of air cleaning equipment have been installed and are in operation at Burlington Fabrics (Holdings) Ltd., where four Stenter machines are processing 80 - 100 tonnes of fabric each week. A patented, wet scrubbing system is now in operation on the two-bay Pegg Whiteley machine, which is used exclusively for pad dyeing and setting, whilst a new high, temperature dry air filtration system is employed on the four and five bay Proctor and Krantz machines. All the machines now exhaust through air to water heat exchangers, which provide all the hot water needed for the extensive dyehouse facilities.
Energy recovery is such that the pay back period will be less than two years.

Ámbito científico (EuroSciVoc)

CORDIS clasifica los proyectos con EuroSciVoc, una taxonomía plurilingüe de ámbitos científicos, mediante un proceso semiautomático basado en técnicas de procesamiento del lenguaje natural. Véas: El vocabulario científico europeo..

Este proyecto aún no se ha clasificado con EuroSciVoc.
Sugiera los ámbitos científicos que considere más relevantes y ayúdenos a mejorar nuestro servicio de clasificación.

Para utilizar esta función, debe iniciar sesión o registrarse

Programa(s)

Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.

Tema(s)

Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.

Convocatoria de propuestas

Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.

Datos no disponibles

Régimen de financiación

Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.

DEM - Demonstration contracts

Coordinador

Environment Pollution Control Ltd
Aportación de la UE
Sin datos
Dirección
Unit 5, Stamford Court Casterton Road
NG5 5LZ Nottingham
Reino Unido

Ver en el mapa

Coste total

Los costes totales en que ha incurrido esta organización para participar en el proyecto, incluidos los costes directos e indirectos. Este importe es un subconjunto del presupuesto total del proyecto.

Sin datos
Mi folleto 0 0