COGENERATION UNIT THIRD PARTY FINANCED

Objectif

Reduction of energy costs by cogeneration and computer based optimization.

New gas turbine (4,2 MWE) with a recovery exchanger on the exhaust gases producing 9 t/h of steam at 18 bar. Both electricity and steam are used for process needs, due to the specific french tarification structure for electricity, the system will be used only 6 months per year, during the cold season. The existing heavy fuel-oil boilers are thus maintained, but converted to natural gas. Remote monitoring and computer based optimal load control but not apparent innovation.

Appel à propositions

Data not available

Régime de financement

DEM - Demonstration contracts

Coordinateur

COMPAGNIE GENERALE DE CHAUFFE
Contribution de l’UE
Aucune donnée
Adresse
B.P. 341
93153 Blanc-Mesnil Cedex
France

Voir sur la carte

Coût total
Aucune donnée