Integration of dsg technology for electricity production - (INDITEP)

Objetivo

Objectives and problems to be solved:
Direct steam generation in the absorber pipes of parabolic trough solar collectors (the so-called DSG process) is a promising option to reduce costs of solar power plants using this type of collectors, because it could achieve a 26% reduction in the cost of electricity produced with these solar power plants. INDITEP is based on the experience and knowledge gathered by the Partners in the DISS project and it is the logical continuation of DISS. Once the technical feasibility of the DSG technology has been experimentally proven in DISS-phase II, INDITEP will undertake four main work packages aimed at integrating the DSG technology into the energy market:
a) engineering design of a first 5MWe pre-commercial DSG power plant,
b) development of advanced components to enhance the competitiveness of the DSG technology (e.g. cheap water/steam separator, buffer-storage unit, advanced components to increase the steam temperature from 400ºC to 500ºC, etc.),
c) qualification of key components and operation procedures for DSG power plants, and) socio-economic research on the DSG technology. Description of work and problems to be solved :Four Work Packages are included in INDITEP to achieve the project objectives:
1. Engineering detail design of a 5MWe pre-commercial DSG power plant. Such a detail design is required before the procurement of components and implementation of the first commercial plant. The experience and know-how acquired by the DISS Partners will be applied in INDITEP to design this first commercial plant, adopting a steam Rankine cycle with hybridisation.
2. Integration enhancement of DSG technology developing advanced system components to increase, from 400ºC to 500ºC, the temperature of the superheated steam produced by the solar field.
3. Qualification of key components and O&M procedures for the pre-commercial plant. This qualification is required in order to avoid unexpected problems and assure the good performance of a first commercial plant. The DSG test facility implemented at the PSA during the DISS project will be used for this purpose.
4. Socio-economic study to identify potential market niches for DSG power plants and to assess the integration potential of this new technology. Expected results: The main results items planned in INDITEP are the following:
- Engineering design for a 5Mwe pre-commercial DSG power plant (Hybridised Rankine cycle).
- Manufacture and delivery for testing at the PSA of at least one prototype water/steam separator specially designed for DSG solar fields.
- Manufacture of pipes provided with a new selective coating for 550ºC. Design and delivery of parts to integrate a secondary concentrator into a complete non-evacuated absorber prototype.
- Modification of the PSA DISS test facility to perform the qualification tests, in particular by adding two additional collectors to achieve typical operation parameters of the future commercial system (e.g. nominal power, mass flow etc.).

Convocatoria de propuestas

Data not available

Régimen de financiación

CSC - Cost-sharing contracts

Coordinador

IBERDROLA INGENIERIA Y CONSULTORIA S.A .
Dirección
Avda. De Burgos N°8b, Edificio Genesis
28036 Madrid
España

Ver en el mapa

Participantes (11)

CENTER FOR SOLAR ENERGY AND HYDROGEN RESEARCH BADEN-WÜRTEMBERG
Alemania
Dirección
21 C,hessbrühlstrasse 21 C
70565 Stuttgart

Ver en el mapa

CENTRO DE INVESTIGACIONES ENERGETICAS, MEDIAMBIENTALES Y TECNOLOGICAS
España
Dirección
S/n,carretera Senes S/n
04200 Tabernas

Ver en el mapa

ELYO GYMSA IBERICA S.A.
España
Dirección
Saint Exupery 8, Urbanizacion La Barriguilla - Ala
29007 Estepona (Malaga)

Ver en el mapa

EULEN S.A.
España
Dirección
Calle Gobelas 25-27
28230 La Florida (Madrid)

Ver en el mapa

FRAMATOME ANP GMBH
Alemania
Dirección
Freyeslebenstrasse 1
91058 Erlangen

Ver en el mapa

Flagsol GmbH
Alemania
Dirección
Mühlengasse 7
50667 Köln

Ver en el mapa

GAMESA ENERGIA SERVICIOS, SA
España
Dirección
C/. Velazques 150 Planta 6a
28002 Madrid

Ver en el mapa

GERMAN AEROSPACE CENTRE
Alemania
Dirección
Linder Höhe
51147 Köln

Ver en el mapa

INITEC TECNOLOGIA SA
España
Dirección
4,c/ Principe De Vergara 120
28002 Madrid

Ver en el mapa

INSTALACIONES INABENSA, S.A.
España
Dirección
Manuel Velasco Pando 7
41007 Sevilla

Ver en el mapa

SIEMENS AG
Alemania
Dirección
Freyeslebenstrasse 1
91050 Erlangen

Ver en el mapa