Objetivo
Any risk analysis dealing with the transport of radionuclides from a radioactive waste repository on the basis of deterministic equations suffers from two severe problems. Firstly, all processes in reality are random in nature and, secondly, the data basis and the knowledge about the relevant processes will never be complete. The aim of the study is to investigate the applicability of fuzzy set theory in decision making and the potential of information theory in this context. Since ambiguity in the valuation of models and model parameters represents the main obstacle for a consent about the results, it seems very promising to apply a kind of maximum entropy method, the "method of unbiased guess", in order to deal with incomplete knowledge. While the incorporation of randomness into this approach is straightforward adequate methods have to be developed in order to deal with incomplete knowledge or subjective quantities (i.e. expert judgement). The main aim of the study is to propose a theoretically well-founded formalism serving this purpose. The capability of this formation will be demonstrated on a non-trivial migration problem.
Any risk analysis dealing with the transport of radionuclides from a radioactive waste repository on the basis of deterministic equations suffers from 2 severe problems. Firstly, all processes in reality are random in nature and, secondly, the data basis and the knowledge about the revelant process will never be complete. The aim of the study is to investigate the applicability of fuzzy set theory in decision making and the potential of information theory in this context. Since ambiguity in the valuation of models and model parameters represents the main obstacle for a consent about the results, it seems very promising to apply a kind of maximum entropy method, the method of unbiased guess, in order to deal with incomplete knowledge. While the incorporation of randomness into this approach is straightforward, adequate methods have to be developed in order to deal with incomplete knowledge or subjective quantities (ie, expert judgement). The main aim of the study is to propose a theoretically well founded formalism serving this purpose. The capability of this formalism will be demonstrated on a nontrivial migration problem.
The principle drawbacks have been completed using probability or fuzzy theory in risk analysis and decision making dealing with the transport of radionuclides from a radioactive waste repository. A method for the unambiguous choice of the characterizing function of the parameters seems to be a generalized maximum entropy method, the method of unbiased guess. Some measures of uncertainty are compiled, whose maximization or minimization may lead to a useful strategy in defining the characterizing functions.
Work programme:
1. Compilation of the relevant aspects of information theory. Special emphasis is put onto the method of unbiased guess and its theoretical foundation.
2. Discussion of the problems of geochemical modelling in risk assessments with respect to uncertainty using probability density functions and the theory of fuzzy sets.
3. Development of a formalism for a consistent and unambiguous incorporation of incomplete knowledge employing the method of unbiased guess.
4. Demonstration of the applicability of the formalism using a simulated migration problem as a test case.
5. Documentation
6. Project coordination
Ámbito científico (EuroSciVoc)
CORDIS clasifica los proyectos con EuroSciVoc, una taxonomía plurilingüe de ámbitos científicos, mediante un proceso semiautomático basado en técnicas de procesamiento del lenguaje natural. Véas: El vocabulario científico europeo..
CORDIS clasifica los proyectos con EuroSciVoc, una taxonomía plurilingüe de ámbitos científicos, mediante un proceso semiautomático basado en técnicas de procesamiento del lenguaje natural. Véas: El vocabulario científico europeo..
- ingeniería y tecnología otras ingenierías y tecnologías ingeniería nuclear gestión de residuos nucleares
- ciencias naturales matemáticas matemáticas puras matemáticas discretas lógica matemática
- ciencias naturales ciencias químicas química nuclear química de la radiación
Para utilizar esta función, debe iniciar sesión o registrarse
Programa(s)
Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.
Programas de financiación plurianuales que definen las prioridades de la UE en materia de investigación e innovación.
Tema(s)
Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.
Las convocatorias de propuestas se dividen en temas. Un tema define una materia o área específica para la que los solicitantes pueden presentar propuestas. La descripción de un tema comprende su alcance específico y la repercusión prevista del proyecto financiado.
Convocatoria de propuestas
Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.
Datos no disponibles
Procedimiento para invitar a los solicitantes a presentar propuestas de proyectos con el objetivo de obtener financiación de la UE.
Régimen de financiación
Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.
Régimen de financiación (o «Tipo de acción») dentro de un programa con características comunes. Especifica: el alcance de lo que se financia; el porcentaje de reembolso; los criterios específicos de evaluación para optar a la financiación; y el uso de formas simplificadas de costes como los importes a tanto alzado.
Coordinador
52062 Aachen
Alemania
Los costes totales en que ha incurrido esta organización para participar en el proyecto, incluidos los costes directos e indirectos. Este importe es un subconjunto del presupuesto total del proyecto.