Any risk analysis dealing with the transport of radionuclides from a radioactive waste repository on the basis of deterministic equations suffers from two severe problems. Firstly, all processes in reality are random in nature and, secondly, the data basis and the knowledge about the relevant processes will never be complete. The aim of the study is to investigate the applicability of fuzzy set theory in decision making and the potential of information theory in this context. Since ambiguity in the valuation of models and model parameters represents the main obstacle for a consent about the results, it seems very promising to apply a kind of maximum entropy method, the "method of unbiased guess", in order to deal with incomplete knowledge. While the incorporation of randomness into this approach is straightforward adequate methods have to be developed in order to deal with incomplete knowledge or subjective quantities (i.e. expert judgement). The main aim of the study is to propose a theoretically well-founded formalism serving this purpose. The capability of this formation will be demonstrated on a non-trivial migration problem.
Any risk analysis dealing with the transport of radionuclides from a radioactive waste repository on the basis of deterministic equations suffers from 2 severe problems. Firstly, all processes in reality are random in nature and, secondly, the data basis and the knowledge about the revelant process will never be complete. The aim of the study is to investigate the applicability of fuzzy set theory in decision making and the potential of information theory in this context. Since ambiguity in the valuation of models and model parameters represents the main obstacle for a consent about the results, it seems very promising to apply a kind of maximum entropy method, the method of unbiased guess, in order to deal with incomplete knowledge. While the incorporation of randomness into this approach is straightforward, adequate methods have to be developed in order to deal with incomplete knowledge or subjective quantities (ie, expert judgement). The main aim of the study is to propose a theoretically well founded formalism serving this purpose. The capability of this formalism will be demonstrated on a nontrivial migration problem.
The principle drawbacks have been completed using probability or fuzzy theory in risk analysis and decision making dealing with the transport of radionuclides from a radioactive waste repository. A method for the unambiguous choice of the characterizing function of the parameters seems to be a generalized maximum entropy method, the method of unbiased guess. Some measures of uncertainty are compiled, whose maximization or minimization may lead to a useful strategy in defining the characterizing functions.
Work programme:
1. Compilation of the relevant aspects of information theory. Special emphasis is put onto the method of unbiased guess and its theoretical foundation.
2. Discussion of the problems of geochemical modelling in risk assessments with respect to uncertainty using probability density functions and the theory of fuzzy sets.
3. Development of a formalism for a consistent and unambiguous incorporation of incomplete knowledge employing the method of unbiased guess.
4. Demonstration of the applicability of the formalism using a simulated migration problem as a test case.
5. Documentation
6. Project coordination
Wissenschaftliches Gebiet (EuroSciVoc)
CORDIS klassifiziert Projekte mit EuroSciVoc, einer mehrsprachigen Taxonomie der Wissenschaftsbereiche, durch einen halbautomatischen Prozess, der auf Verfahren der Verarbeitung natürlicher Sprache beruht. Siehe: Das European Science Vocabulary.
CORDIS klassifiziert Projekte mit EuroSciVoc, einer mehrsprachigen Taxonomie der Wissenschaftsbereiche, durch einen halbautomatischen Prozess, der auf Verfahren der Verarbeitung natürlicher Sprache beruht. Siehe: Das European Science Vocabulary.
- Technik und Technologie Sonstige Technik und Technologie Kerntechnik Behandlung radioaktiver Abfälle
- Naturwissenschaften Mathematik reine Mathematik diskrete Mathematik mathematische Logik
- Naturwissenschaften Chemiewissenschaften Nuklearchemie Strahlenchemie
Sie müssen sich anmelden oder registrieren, um diese Funktion zu nutzen
Programm/Programme
Mehrjährige Finanzierungsprogramme, in denen die Prioritäten der EU für Forschung und Innovation festgelegt sind.
Mehrjährige Finanzierungsprogramme, in denen die Prioritäten der EU für Forschung und Innovation festgelegt sind.
Thema/Themen
Aufforderungen zur Einreichung von Vorschlägen sind nach Themen gegliedert. Ein Thema definiert einen bestimmten Bereich oder ein Gebiet, zu dem Vorschläge eingereicht werden können. Die Beschreibung eines Themas umfasst seinen spezifischen Umfang und die erwarteten Auswirkungen des finanzierten Projekts.
Aufforderungen zur Einreichung von Vorschlägen sind nach Themen gegliedert. Ein Thema definiert einen bestimmten Bereich oder ein Gebiet, zu dem Vorschläge eingereicht werden können. Die Beschreibung eines Themas umfasst seinen spezifischen Umfang und die erwarteten Auswirkungen des finanzierten Projekts.
Aufforderung zur Vorschlagseinreichung
Verfahren zur Aufforderung zur Einreichung von Projektvorschlägen mit dem Ziel, eine EU-Finanzierung zu erhalten.
Daten nicht verfügbar
Verfahren zur Aufforderung zur Einreichung von Projektvorschlägen mit dem Ziel, eine EU-Finanzierung zu erhalten.
Finanzierungsplan
Finanzierungsregelung (oder „Art der Maßnahme“) innerhalb eines Programms mit gemeinsamen Merkmalen. Sieht folgendes vor: den Umfang der finanzierten Maßnahmen, den Erstattungssatz, spezifische Bewertungskriterien für die Finanzierung und die Verwendung vereinfachter Kostenformen wie Pauschalbeträge.
Finanzierungsregelung (oder „Art der Maßnahme“) innerhalb eines Programms mit gemeinsamen Merkmalen. Sieht folgendes vor: den Umfang der finanzierten Maßnahmen, den Erstattungssatz, spezifische Bewertungskriterien für die Finanzierung und die Verwendung vereinfachter Kostenformen wie Pauschalbeträge.
Koordinator
52062 Aachen
Deutschland
Die Gesamtkosten, die dieser Organisation durch die Beteiligung am Projekt entstanden sind, einschließlich der direkten und indirekten Kosten. Dieser Betrag ist Teil des Gesamtbudgets des Projekts.