Skip to main content
European Commission logo
English English
CORDIS - EU research results
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Content archived on 2022-12-27

SMALL HYDROELECTRIC UNIT IN THE MONASTERY OF FILOTHEOS IN AGIO OROS

Objective

The construction of a small hydroelectric unit in order to provide electric energy to the Monastery of Filotheos in Agio Oros.
In addition the project will satisfy the Monastery needs for watering and irrigation of the surrounding area.

The unit will comprise of a Twin jet impulse type turbine directly connected with synchronous alternating current generator 1000 RPM.
The unit will be placed inside a small shelter.
For the purpose of collecting and carrying the area water in the unit, a steel pipeline will be constructed with a total length of 263,55 m, connecting the deposit with the unit.
In order to drive the water from the collection dam that will be constructed to the deposit, an existing ditch with a total length of 1200 m will be reconstructed accordingly.
In order to protect the unit shelter from landslight a retainer wall will be constructed (20 x 5 x 9 m). Moreover, auxiliary roads will be constructed in order to carry the necessary equipment in place.

Topic(s)

Data not available

Call for proposal

Data not available

Coordinator

MONASTERY OF FILOTHEOS IN AGIO OROS
EU contribution
No data
Address
SOTIRIOS NMDOS 7 MERARHAS 9
65403 Kavala
Greece

See on map

Total cost
No data