Skip to main content
European Commission logo
Deutsch Deutsch
CORDIS - Forschungsergebnisse der EU
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Inhalt archiviert am 2022-12-27

SMALL HYDROELECTRIC UNIT IN THE MONASTERY OF FILOTHEOS IN AGIO OROS

Ziel

The construction of a small hydroelectric unit in order to provide electric energy to the Monastery of Filotheos in Agio Oros.
In addition the project will satisfy the Monastery needs for watering and irrigation of the surrounding area.

The unit will comprise of a Twin jet impulse type turbine directly connected with synchronous alternating current generator 1000 RPM.
The unit will be placed inside a small shelter.
For the purpose of collecting and carrying the area water in the unit, a steel pipeline will be constructed with a total length of 263,55 m, connecting the deposit with the unit.
In order to drive the water from the collection dam that will be constructed to the deposit, an existing ditch with a total length of 1200 m will be reconstructed accordingly.
In order to protect the unit shelter from landslight a retainer wall will be constructed (20 x 5 x 9 m). Moreover, auxiliary roads will be constructed in order to carry the necessary equipment in place.

Thema/Themen

Data not available

Aufforderung zur Vorschlagseinreichung

Data not available

Koordinator

MONASTERY OF FILOTHEOS IN AGIO OROS
EU-Beitrag
Keine Daten
Adresse
SOTIRIOS NMDOS 7 MERARHAS 9
65403 Kavala
Griechenland

Auf der Karte ansehen

Gesamtkosten
Keine Daten