Skip to main content
European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS
CORDIS Web 30th anniversary CORDIS Web 30th anniversary
Contenido archivado el 2022-12-27

PORTWOOD WEIR SMALL-SCALE HYDROELECTRIC PROJECT

Objetivo

To develop hydropower at an existing river weir using a new level-gear turbine generator, made locally. The head of 4.5 m will be increased by 1 m using an inflatable weir - the first use of such a weir in the UK.

The project will consist of an intake structure upstream of the weir; a pipeline to a small powerhouse below the weir and to one side and an innovative (for UK) propellor level-gear turbine generator producing 140 kW.
The weir will be raised by an inflatable rubber dam to provide a total head of 5.5 m.
The joint sponsors of the scheme include the Stockport Metropolitan Borough Council and the turbine manufacturers - F. Bamford and Co.

Tema(s)

Data not available

Convocatoria de propuestas

Data not available

Régimen de financiación

DEM - Demonstration contracts

Coordinador

RENEWABLE ENERGY ASSOCIATES LTD
Aportación de la UE
Sin datos
Dirección
HEADLEY HOUSE WESTON GREEN
KT7 OYJ DITTON THAMES
Reino Unido

Ver en el mapa

Coste total
Sin datos