European Commission logo
español español
CORDIS - Resultados de investigaciones de la UE
CORDIS
Contenido archivado el 2022-11-21

ULCOS New Blast Furnace Process

Objetivo

The central objective of this project is to develop a new blast furnace process route able to operate with very low CO2-emissions, based on drastically reduced consumption of carbon containing input materials.

The programme initially will cover a period of 5 years, starting with mathematical modelling and laboratory as well as technical scale investigations, which are necessary to get a suitable process concept for a CO2 reduced iron-making process. The results of that work are basis for small scale blast furnace tests which will give the first experimentally proven data for the CO2 reduction potential of the new process as well as process data for a technical process evaluation.

The results shall lead to the selection and the base preparatory work for the large size pilot demonstration unit for the new CO2 reduced iron-making process, which is objective of a future project.

Tema(s)

Data not available

Convocatoria de propuestas

Data not available

Régimen de financiación

Data not available

Coordinador

THYSSENKRUPP STEEL AG
Aportación de la UE
Sin datos
Dirección
Kaiser-Wilhelm-Strasse 100
47166 DUISBURG
Alemania

Ver en el mapa

Enlaces
Coste total
Sin datos

Participantes (13)