Skip to main content
European Commission logo print header
Content archived on 2022-12-27

FIELD TRIAL OF A DOWN HOLE STEAM GENERATOR

Objective

This project envisaged the field testing of a down-hole steam generator developed in project no TH 05015/80.
Works on this project have been preliminary: site preparation only .
The project pursued the laboratory development of downhole steam generator to include a realistic evaluation in a downhole environment. It was carried out in a single stage which comprises the field evaluation of a 5 MW (5000 BBL steam/day) steam generator at depths up to 400 m in a non producing test well of the Egmanton field.

Call for proposal

Data not available

Coordinator

British Petroleum plc (BP)
EU contribution
No data
Address
Britannic House Moor Lane
EC24 9BU London
United Kingdom

See on map

Total cost
No data