Skip to main content
Aller à la page d’accueil de la Commission européenne (s’ouvre dans une nouvelle fenêtre)
français fr
CORDIS - Résultats de la recherche de l’UE
CORDIS
Contenu archivé le 2022-12-27

CONSTRUCTION OF THE FIRST OF TEN 300 KW WIND TURBINES FOR THE HARBOUR OF DUNKIRK

Objectif

To install a 300 kW horizontal axis Wind Turbine on the jetty of Dunkirk harbor connected to the national grid, in order to gain experience and evaluate the local potential.
Delay due to difficulties in finding the most windy place in Dunkerque.
A 300 kW, 3-bladed horizontal axis wind turbine will be installed on the jetty of the Dunkirk harbor in order to be connected to the national grid. The 25 m rotor diameter wind turbine is supplied by HMZ Windmaster and is provided with an asynchronous generator rated at 380 V, 50 Hz, 1520 rpm, placed on a 30 meter tapered tube.
The whole wind energy plant is controlled by a microprocessor. After the wind turbine erection a series of intensive measurements is going to be carried out. Since the hypotheses on the wind potential of this exceptional site will have been verified, a windfarm, comprising 10 turbines, will be designed. The annual yield is estimated at 487 MWh. For the realization of the project the proposer is cooperating with HMZ Belgium N. V. and Espace Eolien Regional (FR).

Champ scientifique (EuroSciVoc)

Ce projet n'a pas encore été classé par EuroSciVoc.
Proposez les domaines scientifiques qui vous semblent les plus pertinents et aidez-nous à améliorer notre service de classification.

Programme(s)

Thème(s)

Données non disponibles

Appel à propositions

Données non disponibles

Régime de financement

DEM - Demonstration contracts

Coordinateur

CITY OF DUNKERQUE
Contribution de l’UE
Aucune donnée
Adresse
FR - 59140 DUNKERQUE

France
Coût total
Aucune donnée