Skip to main content
Aller à la page d’accueil de la Commission européenne (s’ouvre dans une nouvelle fenêtre)
français fr
CORDIS - Résultats de la recherche de l’UE
CORDIS
Contenu archivé le 2022-12-27

WIND TURBINE FOR LOCAL SUPPLY ON OUESSANT ISLAND

Objectif

A RATIER FIGEAC RF-100 windmachine will be installed at Ouessant island of Brittany by EDF in order to demonstrate the benefits of windpower for island diesel grids. The estimated energy production is 250,000 KWh/yr.
Project abandoned due to technical failure.
On the island of Ouessant-Brittany a 100 KW Ratier-FIGEAC RF 100 windmachine will be installed by Electricite de France (EDF) at a place where another had failed. It will be connected to the local 2.5 MW diesel power grid in order to demonstrate the benefits of windpower for such grids. Due to the site of the installation, the wind machine has very high transport and maintenance costs. It is remarkable that the energy cost exceeds by only 5 % (410 KF/yr instead of 390 KF/yr) the cost of energy generated by the diesel engines. The cost of the wind energy is rather low at 1 F/KWh. The estimated wind energy production is 250-300,000 KWh/yr which corresponds to a total saving of 55-70 TEP/yr. The demonstration phase lasts 15 months.

Champ scientifique (EuroSciVoc)

Ce projet n'a pas encore été classé par EuroSciVoc.
Proposez les domaines scientifiques qui vous semblent les plus pertinents et aidez-nous à améliorer notre service de classification.

Programme(s)

Thème(s)

Données non disponibles

Appel à propositions

Données non disponibles

Régime de financement

DEM - Demonstration contracts

Coordinateur

ELECTRICITE DE FRANCE
Contribution de l’UE
Aucune donnée
Adresse
RUE DE MESSINE 23
75384 Paris
France
Coût total
Aucune donnée