Obiettivo Aim of the presented project is the development of a new concrete processing system aimed at the construction of pre-cast concrete pipes of small/medium diameter, specially used in sewage systems. The proposed system will produce more resistant and longer life concrete pipes by the development of a new mechanical chuck able of a forced conduction of concrete, managed by a control system able to determine the chuck speed and the concrete application area depending on a real - time quality control of the pipe under production. The system will produce great benefits by an environmental point of view, reducing the infiltration and pipes risk of breaks, and will address the users need of pipes which require less maintenance. Campo scientifico engineering and technologyelectrical engineering, electronic engineering, information engineeringelectronic engineeringcontrol systems Programma(i) FP5-GROWTH - Programme for research technological development and demonstration on "Competitive and sustainable growth 1998-2002" Argomento(i) 1.1.3.-5. - RTD Activities of a Generic Nature : materials and their technologies for production and transformation and new and improved materials and production technologies in the steel field Invito a presentare proposte Data not available Meccanismo di finanziamento EAW - Exploratory awards Coordinatore COLLE S.P.A. Contributo UE Nessun dato Indirizzo VIALE BELLUNO, 5 32020 ARABBA Italia Mostra sulla mappa Costo totale Nessun dato Partecipanti (1) Classifica in ordine alfabetico Classifica per Contributo UE Espandi tutto Riduci tutto WAGENER & POLASCHECK VERTRIEBSGESELLSCHAFT MBH & CO.KG Germania Contributo UE Nessun dato Indirizzo Gewerbestrasse 5 33818 LEOPOLDSHOEHE Mostra sulla mappa Costo totale Nessun dato