European Commission logo
English English
CORDIS - EU research results
CORDIS

CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3

Deliverables

Summary of High TRL test execution of Regional demonstrator

This deliverable will summarise the tests performed in the real train and laboratory in regional demonstrator. Within this activity a dissemination video will be included.

Standardisation Report

This report summarise the standardisation activities undertaken during the lifetime of the project

Report on Communication & Exploitation

This report will summarise the dissemination and exploitation activities undertaken during the lifetime of the project the main results and will propose further actions and activities

Report on the extension of the work made by CONNECTA-2 regarding the visualization of Functional Open Coupling functions in DMI

This deliverable will be the extension of the results achieved in CONNECTA2 Deliverable 13 Those results will be extended to more functions and more GoA levels Output of T53

Intermediate Report on Cybersecurity measures for NG-TCMS

This Intermediate deliverable will provide set of measures to be taken over the NGTCMS architecture and the subsystems and devices connected to it Moreover the selection criteria for each measure will also be provided

Synthesis of the feasibility study of modules integration in NG-TCMS (portable driver's desk and Autonomous doors) and of the results of the autonomous door system simulation tests

This deliverable will be the result of Task T53 items called New cabin functions for GoA3 New passengers functions for autonomous operation and Detailed application of an autonomous function Autonomous doors modules integration in NGTCMS It will present with respect to the results of interactions with the Shift2Rail project PIVOT2 firstly a synthesis of the Use Cases of the corresponding items Then the synthesis of the architecture study of these items will be presented where the autonomous function supported will be the autonomous doors Finally the results of the tests of the two simulations drivers desk emulation and autonomous door module will be presented Output of T53

Report on new Application Profiles and alignment of NG-TCMS architecture with OCORA

This deliverable will show an analysis of the requirements of OCORA and CONNECTA and based on that describe a common TCMSCCS reference architecture Furthermore it will contain the specification of the Application Profiles and FOC Profiles for the subsystems named in the task description

Final Review of Data Management Plan

Document that outlines how data must be handled during and after the project Data Management implementation will be described in in this deliverable

Final report on the contribution of CONNECTA-3 to Shift2Rail

This report will summarise the contributions of the project to the Shift2Rail’s KPI and the MAAP.

Additional Train to ground services

It will be content input from T4.1 and 4.2 and describe wireless TCMS deployment and validation.

Report on Evaluation of the exchange compatibility of subsystems under the new FDF approach

The deliverable will contain the results of the evaluation of the feasibility of proposed FDF approach in terms of exchange compatibility with a special focus on the possibility of independent refurbishment of TCMS and subsystems and or addition of a subsystem The deliverable will also provide the assessment of safety aspects and analysis of the impact of changing the application running on top of the FDF without vehicle manufacturer on reauthorization andor recertification Output of T54

Report on the evaluation of the compatibility between ITXPT and the NG-TCN and its impact on IEC 62580

This report will consist firstly in a synthesis of the analysis of two main characteristics of ITxPT versus NGTCMS More precisely ITxPT architecture will be analysed considering the interface between TCMS and OMTS Customer Oriented Services network and an analysis of its relevant specification which could have an impact on TCMS protocol or services Inventory MQTT GNSS Over the Air protocol will be performed and presented Secondly the relevant inputs for the standard IEC 62580 OMTS in terms of uses cases and requirements will be presented Output of T55

KPI Assessment and benchmarking of NG-TCMS

Document that outlines the KPI assessment of CONNECTA2 regarding the general Shift2Rail KPIs This deliverable will also include a benchmarking of NGTCMS regarding current TCMS technologies and other technologies which are emerging in other industries

Intermediate Safety Case Report

This Intermediate deliverable will contain the necessary input to define safety case in WP2WP3 Since a safety case depends on the final solution this task will only cover the common parts of the safety case ie the list above being the rest of the system and certification covered in T21 and T31

Summary of High TRL test execution of Urban demonstrator

This deliverable will summarise the tests performed in the real train and laboratory in urban demonstrator Within this activity a dissemination video will be included

InnoTrans 2022 Demonstrator

Demonstrator / quick-win to be shown during the InnoTrans fair in September 2022.

Data Management Plan

Document that outlines how data must be handled during and after the project.

Publications

5G Technology for Next-Generation Wireless Consist Networks in Railways

Author(s): Ana Larrañaga, Aitor Arriola, Imanol Martinez, Pedro Aljama, Jérôme Härri, Igor Lopez, Uwe Fuhr, Marvin Straub
Published in: 2022, ISBN 978-3-030-92684-7
Publisher: Springer, Cham
DOI: 10.1007/978-3-030-92684-7_8

Applicability of 5G Technology for a Wireless Train Backbone

Author(s): Pedro Aljama; Aitor Arriola; Imanol Martínez; Iñaki Val; Igor López; Julio Manco; Jérôme Härri
Published in: 2021
Publisher: IEEE
DOI: 10.23919/eucap51087.2021.9411492

Characterization of a 5G Wireless Train Backbone via Ray-Tracing

Author(s): Jorge Elizalde; Aitor Arriola; Manuel Alfageme; Jérôme Härri; Igor López
Published in: 2022 16th European Conference on Antennas and Propagation (EuCAP), 2022
Publisher: IEEE
DOI: 10.23919/eucap53622.2022.9769483

Abstract “Prototyping and integration of the Next Generation of High Capable and Safe TCMS TRA 2022”

Author(s): Igor Lopez, Imanol de Arriba, Gernot Hans
Published in: CORDIS, 2022
Publisher: TRA

Searching for OpenAIRE data...

There was an error trying to search data from OpenAIRE

No results available