Periodic Reporting for period 3 - CONNECTA-3 (CONtributing to Shift2Rail's NExt generation of high Capable and safe TCMS PhAse 3)
Reporting period: 2023-01-01 to 2023-11-30
Regarding collaboration, the standardisation work was carried on closely with the IEC61375 series WG43 to ensure its uptake and fostering the domain in the industry.
In conclusion, the advancements introduced through the CONNECTA-3 project and its series demonstrated the pivotal role of NG-TCMS in shaping the trajectory of the forthcoming railway system. The evolving paradigm envisions a railway system characterized by heightened autonomy, seamless connectivity, enhanced environmental sustainability, optimized cost-effectiveness, and elevated safety standards.
1. Definition of the process to follow for the scalation of TRL7 and definition of the conformance tests for each technology.
2. Development of TRL7 solutions belonging to CONNECTA-3 and the integration of the TRL7 network equipment delivered by Safe4Rail-3 project.
3. Integration of Network Equipment delivered by Safe4Rail-3 project based on NG-TCN.
4. Validation in relevant laboratory and field tests NG-TCMS technologies.
It is worth noting that CONNECTA-3 has launched a standardization plan within the IEC WG43 for the updated of IEC 61375 series of standard to incorporate NG-TCMS technologies, being the standardization a fundamental step for the future exploitation of these technologies in the railway sector.