Rezultaty
This deliverable will summarise the tests performed in the real train and laboratory in regional demonstrator. Within this activity a dissemination video will be included.
Standardisation ReportThis report summarise the standardisation activities undertaken during the lifetime of the project
Report on Communication & ExploitationThis report will summarise the dissemination and exploitation activities undertaken during the lifetime of the project the main results and will propose further actions and activities
Report on the extension of the work made by CONNECTA-2 regarding the visualization of Functional Open Coupling functions in DMIThis deliverable will be the extension of the results achieved in CONNECTA2 Deliverable 13 Those results will be extended to more functions and more GoA levels Output of T53
Intermediate Report on Cybersecurity measures for NG-TCMSThis Intermediate deliverable will provide set of measures to be taken over the NGTCMS architecture and the subsystems and devices connected to it Moreover the selection criteria for each measure will also be provided
Synthesis of the feasibility study of modules integration in NG-TCMS (portable driver's desk and Autonomous doors) and of the results of the autonomous door system simulation testsThis deliverable will be the result of Task T53 items called New cabin functions for GoA3 New passengers functions for autonomous operation and Detailed application of an autonomous function Autonomous doors modules integration in NGTCMS It will present with respect to the results of interactions with the Shift2Rail project PIVOT2 firstly a synthesis of the Use Cases of the corresponding items Then the synthesis of the architecture study of these items will be presented where the autonomous function supported will be the autonomous doors Finally the results of the tests of the two simulations drivers desk emulation and autonomous door module will be presented Output of T53
Report on new Application Profiles and alignment of NG-TCMS architecture with OCORAThis deliverable will show an analysis of the requirements of OCORA and CONNECTA and based on that describe a common TCMSCCS reference architecture Furthermore it will contain the specification of the Application Profiles and FOC Profiles for the subsystems named in the task description
Final Review of Data Management PlanDocument that outlines how data must be handled during and after the project Data Management implementation will be described in in this deliverable
Final report on the contribution of CONNECTA-3 to Shift2RailThis report will summarise the contributions of the project to the Shift2Rail’s KPI and the MAAP.
Additional Train to ground servicesIt will be content input from T4.1 and 4.2 and describe wireless TCMS deployment and validation.
Report on Evaluation of the exchange compatibility of subsystems under the new FDF approachThe deliverable will contain the results of the evaluation of the feasibility of proposed FDF approach in terms of exchange compatibility with a special focus on the possibility of independent refurbishment of TCMS and subsystems and or addition of a subsystem The deliverable will also provide the assessment of safety aspects and analysis of the impact of changing the application running on top of the FDF without vehicle manufacturer on reauthorization andor recertification Output of T54
Report on the evaluation of the compatibility between ITXPT and the NG-TCN and its impact on IEC 62580This report will consist firstly in a synthesis of the analysis of two main characteristics of ITxPT versus NGTCMS More precisely ITxPT architecture will be analysed considering the interface between TCMS and OMTS Customer Oriented Services network and an analysis of its relevant specification which could have an impact on TCMS protocol or services Inventory MQTT GNSS Over the Air protocol will be performed and presented Secondly the relevant inputs for the standard IEC 62580 OMTS in terms of uses cases and requirements will be presented Output of T55
KPI Assessment and benchmarking of NG-TCMSDocument that outlines the KPI assessment of CONNECTA2 regarding the general Shift2Rail KPIs This deliverable will also include a benchmarking of NGTCMS regarding current TCMS technologies and other technologies which are emerging in other industries
Intermediate Safety Case ReportThis Intermediate deliverable will contain the necessary input to define safety case in WP2WP3 Since a safety case depends on the final solution this task will only cover the common parts of the safety case ie the list above being the rest of the system and certification covered in T21 and T31
Summary of High TRL test execution of Urban demonstratorThis deliverable will summarise the tests performed in the real train and laboratory in urban demonstrator Within this activity a dissemination video will be included
Demonstrator / quick-win to be shown during the InnoTrans fair in September 2022.
Document that outlines how data must be handled during and after the project.
Publikacje
Autorzy:
Ana Larrañaga, Aitor Arriola, Imanol Martinez, Pedro Aljama, Jérôme Härri, Igor Lopez, Uwe Fuhr, Marvin Straub
Opublikowane w:
2022, ISBN 978-3-030-92684-7
Wydawca:
Springer, Cham
DOI:
10.1007/978-3-030-92684-7_8
Autorzy:
Pedro Aljama; Aitor Arriola; Imanol Martínez; Iñaki Val; Igor López; Julio Manco; Jérôme Härri
Opublikowane w:
2021
Wydawca:
IEEE
DOI:
10.23919/eucap51087.2021.9411492
Autorzy:
Jorge Elizalde; Aitor Arriola; Manuel Alfageme; Jérôme Härri; Igor López
Opublikowane w:
2022 16th European Conference on Antennas and Propagation (EuCAP), 2022
Wydawca:
IEEE
DOI:
10.23919/eucap53622.2022.9769483
Autorzy:
Igor Lopez, Imanol de Arriba, Gernot Hans
Opublikowane w:
CORDIS, 2022
Wydawca:
TRA
Wyszukiwanie danych OpenAIRE...
Podczas wyszukiwania danych OpenAIRE wystąpił błąd
Brak wyników