CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
D2.2 Content management and workflow guidelines (M6), R, PU, CIAOTECH. This will be a joint deliverable with H4C ECoP. As the Platform will be shared by the two projects, this deliverable will be jointly created.
H4C Platform Requirements, functional and technical specification (se abrirá en una nueva ventana)D2.1 H4C Platform Requirements, functional and technical specification (M6) R, PU, INNEN. This will be a joint deliverable with H4C ECoP. As the Platform will be shared by the two projects, this deliverable will be jointly created.
Dissemination and communication plan (se abrirá en una nueva ventana)D7.1 Dissemination and communication plan (periodic update) (M6, 24, 36), R, PU, DEC. In M6, a joint Dissemination and Communication plan of H4C Europe and H4C EcoP will be delivered. Thereafter it will be updated regularly.
Outcomes of the discussions in the first round of expert groups (se abrirá en una nueva ventana)D4.1 Outcomes of the discussions in the first round of expert groups (M18) R, PU, ZEDO
Manual: Business Models and trends for IS and I-US (se abrirá en una nueva ventana)D5.1 Manual: Business Models and trends for IS and I-US (M8), R, PU, CIAOTECH
Management Handbook (se abrirá en una nueva ventana)D8.1 Management Handbook: Containing internal work procedures for all partners (M3) R, PU, CIAOTECH
List of industrial sites with high potential of becoming H4C (se abrirá en una nueva ventana)D3.3 List of industrial sites with high potential of becoming H4C (M18) R, PU, CIRCE This will be a joint deliverable with H4C ECoP. Methodologies for assessment will be shared to set a common criteria for selection.
H4C stakeholder mapping and ecosystem analysis (se abrirá en una nueva ventana)D1.1 H4C and stakeholder mapping and ecosystem analysis (M6, M13) R, PU, CIAOTECH. This will be a collaborative deliverable with H4C ECoP. By M6, H4C ECoP will provide us with their input to inte-grate into our (interim) deliverable in M6. By M13 we will submit our final deliverable, integrating input received from H4C ECoP in M12.
Results of the self-assessment of H4Cs and actions points to foster future progress (se abrirá en una nueva ventana)D3.2 Results of the self-assessment of H4Cs and actions points to foster future progress (M18) R, PU, CIAOTECH
Key Performance Indicators for H4C (se abrirá en una nueva ventana)D3.1 Key Performance Indicators for H4C (M6) R, PU, CIRCE. This will be a collaborative delivera-ble.H4C ECoP will build on the findings from this deliverable in their D1.2 in month 18.
Data management plan (se abrirá en una nueva ventana)D8.2 Data management plan: Dealing with the data generated and used (M3), R, PU, CIAOTECH
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles