Risultati finali
D2.2 Content management and workflow guidelines (M6), R, PU, CIAOTECH. This will be a joint deliverable with H4C ECoP. As the Platform will be shared by the two projects, this deliverable will be jointly created.
H4C Platform Requirements, functional and technical specificationD2.1 H4C Platform Requirements, functional and technical specification (M6) R, PU, INNEN. This will be a joint deliverable with H4C ECoP. As the Platform will be shared by the two projects, this deliverable will be jointly created.
Dissemination and communication planD7.1 Dissemination and communication plan (periodic update) (M6, 24, 36), R, PU, DEC. In M6, a joint Dissemination and Communication plan of H4C Europe and H4C EcoP will be delivered. Thereafter it will be updated regularly.
Outcomes of the discussions in the first round of expert groupsD4.1 Outcomes of the discussions in the first round of expert groups (M18) R, PU, ZEDO
Manual: Business Models and trends for IS and I-USD5.1 Manual: Business Models and trends for IS and I-US (M8), R, PU, CIAOTECH
Management HandbookD8.1 Management Handbook: Containing internal work procedures for all partners (M3) R, PU, CIAOTECH
List of industrial sites with high potential of becoming H4CD3.3 List of industrial sites with high potential of becoming H4C (M18) R, PU, CIRCE This will be a joint deliverable with H4C ECoP. Methodologies for assessment will be shared to set a common criteria for selection.
H4C stakeholder mapping and ecosystem analysisD1.1 H4C and stakeholder mapping and ecosystem analysis (M6, M13) R, PU, CIAOTECH. This will be a collaborative deliverable with H4C ECoP. By M6, H4C ECoP will provide us with their input to inte-grate into our (interim) deliverable in M6. By M13 we will submit our final deliverable, integrating input received from H4C ECoP in M12.
Results of the self-assessment of H4Cs and actions points to foster future progressD3.2 Results of the self-assessment of H4Cs and actions points to foster future progress (M18) R, PU, CIAOTECH
Key Performance Indicators for H4CD3.1 Key Performance Indicators for H4C (M6) R, PU, CIRCE. This will be a collaborative delivera-ble.H4C ECoP will build on the findings from this deliverable in their D1.2 in month 18.
Data management planD8.2 Data management plan: Dealing with the data generated and used (M3), R, PU, CIAOTECH
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile