Project description
Driving a new generation of lithium batteries
Electric vehicles are powered by batteries, which are the most important part. But the demand for electric vehicles is increasing so fast that it will soon outpace battery cell production. The EU-funded SEATBELT project will help to pave the road towards a cost-effective, robust all-solid-state lithium battery comprising sustainable materials by 2026. Specifically, it will achieve the first technological milestone of developing a battery cell that meets the needs of the electric vehicle industry. The low cost cell will be safe by design with sustainable and recyclable materials, reaching high energy densities and long cyclability in line with the 2030 EU targets. The project will be the start point of the first EU all solid-state battery value chain.
Objective
As of 2025, new generations of Li batteries based on silicon/carbon (Gen. 4a) and Li metal (Gen. 4b) anode, where flammable liquid electrolyte is replaced by a non-flammable solid-one, will take over the current Li-ion device. However, only all-solid-state Gen. 4b Li batteries are expected to fulfil the needed cell gravimetric energy density specifications demanded by electromobility and stationary applications. Therefore, SEATBELT ambition is to generate a local EU industry that revolves around a cost-effective, robust all-solid-state Li battery comprising sustainable materials by 2026. SEATBELT intends to achieve the first technological milestone of developing a battery cell (TRL5) meeting the needs of Electric Vehicle (EV) and stationary industry. The low-cost SEATBELT cell is safe-by-design with sustainable and recyclable materials, reaching high energy densities (>380 Wh/kg) and long cyclability (>500 cycles) by 2026 in line with the 2030 EU targets. The cells are produced by low-cost solvent-free extrusion process comprising a combination of innovative materials: thin Li metal, hybrid electrolyte, a safe cathode active material without critical materials and thin Al current collector. The cell design being optimized by interface (operando and atomistic modelling) and process (machine learning) methodologies. In addition, new in situ imaging instrumentation will be developed to investigate safety properties and mechanical deformation to assess cell safety in real conditions. An innovative recycling cycle from materials to cell level will be also established. Thus, SEATBELT will be the start point of a first EU all-solid-state battery value chain, whose main players in RTD and Industry sectors are within the consortium. So, cells and modules will cycle using industrially relevant protocols dedicated to EV and stationary applications. SEATBELT consortium is composed of 14 beneficiary partners and 3 affiliated entities, and one associated partner, from 7 European countries with an overall budget of 7851448.50€.
Fields of science
Keywords
Programme(s)
Funding Scheme
HORIZON-RIA - HORIZON Research and Innovation ActionsCoordinator
75794 Paris
France
See on map
Participants (21)
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
38031 Grenoble Cedex 1
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
38058 Grenoble
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
73011 Chambery
See on map
75015 PARIS 15
See on map
20018 San Sebastian
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
10081 Castellamonte To
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
1000 Bruxelles / Brussel
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
4000 LIEGE
See on map
28006 Madrid
See on map
29500 Ergue Gaberic
See on map
48149 MUENSTER
See on map
48940 Leioa
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
20018 Donostia San Sebastian
See on map
70563 Stuttgart
See on map
01510 Minano Alava
See on map
38000 Grenoble
See on map
92100 Boulogne Billancourt
See on map
5405 AH Uden
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
3811 HP AMERSFOORT
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
3811 HP AMERSFOORT
See on map
845 11 BRATISLAVA
See on map
Partners (1)
SW7 2AZ LONDON
See on map