European commoN EneRgy dataSpace framework enabling data sHaring-driven Across- and beyond- eneRgy sErvices

CORDIS bietet Links zu öffentlichen Ergebnissen und Veröffentlichungen von HORIZONT-Projekten.

Links zu Ergebnissen und Veröffentlichungen von RP7-Projekten sowie Links zu einigen Typen spezifischer Ergebnisse wie Datensätzen und Software werden dynamisch von OpenAIRE abgerufen.

Leistungen

ENERSHARE pilots' final evaluation, best practices, and replication guidelines (öffnet in neuem Fenster)

This deliverable will provide Pilots final evaluation, a collection of the best practices collected and guidelines aimed at replicate the ENERSHARE adoption in other cases as result of the Large-scale pilot cycle running during M30-35 period. Success Criteria: The availability of the report containing the guidelines.(T9.2 – T9.3 – T9.4 – T9.5 – T9.6)

Report on the data sharing incentive design for consumers and local communities (öffnet in neuem Fenster)

This deliverable will report the data sharing incentive methodology for consumers and local communities methodology. Success criteria: The methodology and the available data are clearly defined (T2.2)

Federated learning, data-driven services, data visualisation and Digital Twins (Final version) (öffnet in neuem Fenster)

The deliverable will report about the final version of Federated learning, data-driven services, data visualisation and Digital Twins. Success criteria: availability of final fully operational version of the services ready for final technical release MS8 (T6.1 – T6.2 -T6.3 -T6.4 – T6.5)

ENERSHARE trust and sovereignty building blocks (Beta version) (öffnet in neuem Fenster)

The deliverable will report about the beta version of the trust and sovereignty building blocks. Success criteria: availability of beta version of the building blocks ready for second technical release MS6 (T4.1 -T4.2 -T4.3)

ENERSHARE trust and sovereignty building blocks (Final version) (öffnet in neuem Fenster)

The deliverable will report about the final version of the trust and sovereignty building blocks. Success criteria: availability of final fully operational version of the building blocks ready for final technical release MS8 (T4.1 -T4.2 -T4.3)

Report on the synergies with relevant projects and initiatives (1st version) (öffnet in neuem Fenster)

This report will collect the list of other projects and initiatives identified for synergies setting up.Success criteria: the availability of the report related to first year including the lists and the initial activities plan.(T10.1 – T10.2 – T10.3)

Description of reference architecture for the ENERSHARE Data Space (öffnet in neuem Fenster)

The deliverable will report the reference architecture that will be the base for the implementation of the DataSpace. Success Criteria: The availability of the Reference architecture (T2.4 – T2.5)

ENERSHARE governance models and participatory business models (2nd version) (öffnet in neuem Fenster)

The deliverable will report about the second version of the governance models and participatory business models. Success criteria: availability of second version of the models ready for second technical release MS6 (T7.1 – T7.2 -T7.3)

ENERSHARE interoperability building blocks (Beta version) (öffnet in neuem Fenster)

The deliverable will report about the beta version of the interoperability building blocks. Success criteria: availability of alpha version of the building blocks ready for second technical release MS6 (T3.1 – T3.2 – T3.3)

ENERSHARE engagement, consultation, and open-source plan (öffnet in neuem Fenster)

This document will report the preparation plan for the open-source engagement approach. Success Criteria: The document should deliver the plan including goals, target groups and process to be applied (T11.3)

Report on the synergies with relevant projects and initiatives (2nd version) (öffnet in neuem Fenster)

This deliverable will report the activities with other projects and initiatives involved in synergies.Success criteria: the availability of the report related to second year. (T10.1 – T10.2 – T10.3)

ENERSHARE Data Value Stack (Alpha version) (öffnet in neuem Fenster)

The deliverable will report about the alpha version of Data Value Stack. Success criteria: availability of alpha version of the Data Value Stack ready for first technical release MS4(T5.1 – T5.2 -T5.3)

Business requirements and functional Specification (öffnet in neuem Fenster)

The report of the initial functional and non-functional requirements. SuccessCriteria: The availability of the first requirements list (T2.3)

Communication, dissemination, exploitation, standardisation & stakeholder engagement report and plan (final version) (öffnet in neuem Fenster)

This document will report the dissemination, communication and exploitation activities performed and the results achieved. Moreover will include an updated exploitation plan aimed to describe the post-project strategy planned by the consortium.An extended version including sensitive information on the exploitation and commercialization will be sent separately to the consortium and the EC services.Success Criteria: The document should report the achieved results and the new/updated plan.(T11.1 - T11.2 - T11.3 - T11.4 - T11.5)

Federated learning, data-driven services, data visualisation and Digital Twins (Beta version) (öffnet in neuem Fenster)

The deliverable will report about the beta version of the Federated learning, data-driven services, data visualisation and Digital Twins. Success criteria: availability of alpha version of services ready for second technical release MS6 (T6.1 – T6.2 -T6.3 -T6.4 – T6.5)

Report on the synergies with relevant projects and initiatives (Final version) (öffnet in neuem Fenster)

This deliverable will collect results achieved as part of the activities with other projects and initiatives involved in synergies. Success criteria: the availability of the report related to third year (T10.1 – T10.2 – T10.3)

ENERSHARE governance models and participatory business models (final version)) (öffnet in neuem Fenster)

The deliverable will report about the final version of governance models and participatory business models. Success criteria: availability of final fully operational version of the models ready for final technical release MS8 (T7.1 – T7.2 -T7.3)

ENERSHARE interoperability building blocks (Alpha version) (öffnet in neuem Fenster)

The deliverable will report about the alpha version of the interoperability building blocks. Success criteria: availability of alpha version of the building blocks ready for first technical release MS4 (T3.1 – T3.2 –T3.3)

Use cases' descriptions and list of minimum Data Space building blocks required for pilots (öffnet in neuem Fenster)

This report will describe the needs of identified user groups. It builds on the envisioned piloting use cases, with specific technical characteristics as well as distinct customer bases. Moreover it will report the initial list of building blocks for pilots support. Success criteria: The requirements are clearly defined. (T2.1)

ENERSHARE interoperability building blocks (Final version) (öffnet in neuem Fenster)

The deliverable will report about the final version of the interoperability building blocks. Success criteria: availability of final fully operational version of the building blocks.ready for final technical release MS8 ( T3.1 – T3.2 –T3.3)

Federated learning, data-driven services, data visualisation and Digital Twins (Alpha version) (öffnet in neuem Fenster)

The deliverable will report about the the alpha version of the Federated learning, data-driven services, data visualisation and Digital Twins. Success criteria: availability of alpha version of the services ready for first technical release MS4 (T6.1 –T 6.2 -T6.3 -T6.4 – T6.5)

ENERSHARE governance models and participatory business models (1st version) (öffnet in neuem Fenster)

The deliverable will report about the the first version of governance models and participatory business models. Success criteria: availability of first version of the models ready for first technical release MS4 (T7.1 – T7.2 -T7.3)

ENERSHARE Data Value Stack (Beta version) (öffnet in neuem Fenster)

The deliverable will report about the beta version of the Data Value Stack. Success criteria: availability of alpha version of the Data Value Stack ready for second technical release MS6 (T5.1 – T5.2 -T5.3)

ENERSHARE trust and sovereignty building blocks (Alpha version) (öffnet in neuem Fenster)

The deliverable will report about the alpha version of the trust and sovereignty building blocks. Success criteria: availability of alpha version of the building blocks ready for first technical release MS4 (T4.1 – 4.2 -4.3)

ENERSHARE Data Value Stack (Final version) (öffnet in neuem Fenster)

The deliverable will report about the final version of Data Value Stack. Success criteria: availability of final fully operational version of the building blocks ready for final technical release MS8 (T5.1 – T5.2 -T5.3)

Final version of the ENERSHARE requirements, SSH-driven approach, and reference architecture (öffnet in neuem Fenster)

The report will contain the final functional and non-functional requirements and the consolidated Reference Architecture. Additionally the SSH-driven approach adopted will be reported. Success Criteria: Final version of the specification available. (T2.3 -T2.4 -T2.5)

ENERSHARE Data Space (2nd technology release) (öffnet in neuem Fenster)

The deliverable will report about the the second release of the DataSpace corresponding to second technical release MS6. Success criteria: availability of first version of the environment (T8.2 – T8.3 – T8.4)

ENERSHARE Data Space (final technology release) (öffnet in neuem Fenster)

The deliverable will report about the final version of governance models and participatory business models. Success criteria: availability of final fully operational version of the models ready for final technical release MS8 ( T8.2 – T8.3 – T8.4)

ENERSHARE Data Space (1st technology release) (öffnet in neuem Fenster)

The deliverable will report about the the first release of the DataSpace corresponding to first technical release MS4. Success criteria: availability of first version of the environment (T8.2 – T8.3 – T8.4)

ENERSHARE website (öffnet in neuem Fenster)

The deliverable represent the project website to support the project dissemination.Success Criteria: availability of the accompanying document describing the website structure and main sections roles (T11.2)

Veröffentlichungen

Traveling Wave Method for Event Localization and Characterization of Power Transmission Lines (öffnet in neuem Fenster)

Autoren: Hudomalj, Marko; Trost, Andrej; Čampa, Andrej
Veröffentlicht in: Crossref, 2023
Herausgeber: arxiv
DOI: 10.48550/ARXIV.2304.01733

Interoparbility Framework in Energy Data Spaces (öffnet in neuem Fenster)

Autoren: Jimenez, Sonia; et al.
Veröffentlicht in: IDSA Position Papers, 2023
Herausgeber: International Data Spaces Association e.V.
DOI: 10.5281/zenodo.10117882

LATVIAN RENEWABLE ENERGY POLICY IN THE CONTEXT OF EU INITIATIVES (öffnet in neuem Fenster)

Autoren: Liliia Khorishko , Anna Rudnieva
Veröffentlicht in: Baltic Journal of Economic Studie, 2023, ISSN 2256-0742
Herausgeber: Baltic Journal of Economic Studie
DOI: 10.30525/2256-0742/2023-9-2-211-215

Exploring decentralized data management: a case study of changing energy suppliers in Germany (öffnet in neuem Fenster)

Autoren: Rülicke, Linda; Fehrle, Florian; Martin, Arne; Monti, Antonello; Berkhout, Volker; Warweg, Oliver; Möller, Sven
Veröffentlicht in: Energy Informatics, Ausgabe Volume 7, article number 8, (2024), 2024, ISSN 2520-8942
Herausgeber: Springer Open
DOI: 10.1186/s42162-024-00315-5