Project description
Electrifying the decarbonisation
Electricity can become the leading energy carrier, and it will, according to the EU-funded FEDECOM project. The team believes that power grids are going to be the backbone for the decarbonisation of all energy sectors, and aggregators will be the cornerstone enablers of the potential exploitation. Based on previous EU projects, the FEDECOM project aims to enable integrated local energy systems through sector coupling and cross-energy vector integration, increasing renewables’ penetration. To do so, it will adopt and maximise the potential synergies of direct and indirect electrification. The team’s work will result in a scalable and adaptable cloud based platform.
Objective
Building on results of recently (or soon to be) concluded EU projects, FEDECOM aims to enable integrated local energy systems through sector coupling and cross-energy vector integration, increasing RES penetration via optimal utilisation of energy dispatch, storage and conversion assets. FEDECOM pursues the idea of electricity becoming the leading energy carrier, with power grids as the backbone for the decarbonisation of all energy sectors and aggregators as the cornerstone enabler of the potential exploitation. FEDECOM adopts and maximizes the potential synergies of two complementary deployment strategies: (i) direct electrification (e.g. via demand electrification), and (ii) indirect electrification (with power-to-X technology). FEDECOM will deliver a scalable and adaptable cloud-based platform composed of analytical, modelling and optimization services for planning, supervision and control of integrated local energy systems (power, gas, heating and cooling, industry, electric and hydrogen mobility). Optimized operations of the integrated systems will be demonstrated as part of hybrid RES/storage infrastructures, while enabling a holistic cooperative demand response (DR) strategy across federation of energy communities. With a concept of federated energy communities, FEDECOM unlocks the flexibility potential, enable energy exchange, and provide coordinated actions across near and remote sites, while maximizing the positive impact on grid transmission level. FEDECOM’s integrated package will be verified on three real large-scale pilots, each composed of multiple (federated) demo sites (communities): Spanish Virtual Green H2 Federation, Swiss Residential Hydropower Federation and BENElux cross-country e-Mobility Federation. After FEDECOM, local energy communities and service providers will be fully trained and upskilled via dissemination and engagement activities to take full ownership of FEDECOM solution and its business ecosystem.
Fields of science
Not validated
Not validated
Keywords
Programme(s)
Funding Scheme
HORIZON-IA - HORIZON Innovation ActionsCoordinator
20018 SAN SEBASTIAN
Spain
See on map
Participants (16)
20600 Eibar Guipuzcoa
See on map
1348 Louvain La Neuve
See on map
80686 Munchen
See on map
48009 Bilbao
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
48009 Bilbao
See on map
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
Participation ended
48009 Bilbao
See on map
28033 Madrid
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
06330 Roquefort Les Pins
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
49324 MELLE
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Legal entity other than a subcontractor which is affiliated or legally linked to a participant. The entity carries out work under the conditions laid down in the Grant Agreement, supplies goods or provides services for the action, but did not sign the Grant Agreement. A third party abides by the rules applicable to its related participant under the Grant Agreement with regard to eligibility of costs and control of expenditure.
Participation ended
1495 139 ALGES
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
11060 Beograd
See on map
1831 MACHELEN
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
8530 Harelbeke
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
1040 Bruxelles / Brussel
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
06410 Biot
See on map
20009 SAN SEBASTIAN
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Partners (4)
Partner organisations contribute to the implementation of the action, but do not sign the Grant Agreement.
6900 Massagno
See on map
Partner organisations contribute to the implementation of the action, but do not sign the Grant Agreement.
6928 Manno
See on map
The organization defined itself as SME (small and medium-sized enterprise) at the time the Grant Agreement was signed.
Partner organisations contribute to the implementation of the action, but do not sign the Grant Agreement.
6928 Manno
See on map
Partner organisations contribute to the implementation of the action, but do not sign the Grant Agreement.
EH14 4AS Edinburgh
See on map