CORDIS fornisce collegamenti ai risultati finali pubblici e alle pubblicazioni dei progetti ORIZZONTE.
I link ai risultati e alle pubblicazioni dei progetti del 7° PQ, così come i link ad alcuni tipi di risultati specifici come dataset e software, sono recuperati dinamicamente da .OpenAIRE .
Risultati finali
This deliverable will report on the analysis of energy needs and battery integration for truck & trailer (VC8).
Technical requirements (si apre in una nuova finestra)Technical needs and requirements for BEV and FCEV combinations. This deliverable is related to T1.1.
Supply chain mapping (si apre in una nuova finestra)This deliverable will show the mapping of the ZEFES use cases at a supply chain level. This deliverable is related to T1.3.
Assessment framework (si apre in una nuova finestra)This deliverable will be a report on the assessment framework for baseline assessment, use case evaluation, interface requirements and data requirements for vehicles, infrastructure and logistic during the demonstrations.
Design of the interface between e-trailer and prime mover (si apre in una nuova finestra)This deliverable reports on the analysis of energy needs and battery integration for truck & trailer including design of operation strategies to increase range (VC8).
Digital twin and platform specification & architecture (si apre in una nuova finestra)This deliverable will be a report on the digital twin and platform specification & architecture, including selection of tools, scaling of models, model fidelity, run time and usage assessment. This deliverable is related to activities in T4.1/T4.2, VC16 and VC17.
Feasibility study on new vehicle flexible concepts (si apre in una nuova finestra)This deliverable will report on the feasibility study on new vehicle flexible concepts for payload capacity up to 100% for next LHDV generations. This deliverable is related to activities in T2.5
Infrastructure model/dataset (V2I Concept) (si apre in una nuova finestra)This deliverable will be a report on the infrastructure model/dataset (V2I Concept). This deliverable is related to VC13 and T4.4.
Vehicle simulation platforms (si apre in una nuova finestra)This deliverable will report on the vehicle simulation platforms for BEV, FCEV and trailer combinations. This deliverable is related to activities in T2.2.
ZEFES ecosystem specification (si apre in una nuova finestra)This deliverable will show the ZEFES ecosystem specification, including the use case KPI needs, stakeholder business needs, consolidation towards consistent system, and TCO. This deliverable is realted to T1.3, 1.4, 1.5.
Simulation performance of demonstrators (si apre in una nuova finestra)This deliverable will report on the simulation performance of the demonstrators, including the impact on their innovations via vehicle digital twin model.
Functional Safety Concept (si apre in una nuova finestra)This deliverable will be a report on the functional safety concept for e-trucks, e-dollies and e-trailers for use in vehicles with a distributed zero emission powertrain.
System specification for ZE modular multi-powertrain concepts (si apre in una nuova finestra)This deliverable will report the system specification for ZE modular multi-powertrain concepts. This specification will be verified by the contributing OEMs and trailer manufacturers, specifying the efficiency improvements for the multi-powertrain according to VC9.
Defined Use Cases, Target metrics and needs (si apre in una nuova finestra)This deliverable will define the KPIs per use case on energy savings and mission efficiency. The deliverable is related to T1.2.
Corporate Identity (si apre in una nuova finestra)This deliverable will be a report on the project's corporate Identity. This includes the project website, project flyer design, etc.
Optimization co-design tool and right powertrain component’ sizing (si apre in una nuova finestra)This deliverable reports on the design optimization tool (VC10) and right powertrain components’ sizing with at least 90 payload capacity for use-cases. This deliverable is related to activities in T2.3 and T2.4.
Supply chain needs (si apre in una nuova finestra)This deliverable will report the supply chain needs for reduced energy usage on the missions. This deliverable is related to T1.7.
Pubblicazioni
Autori:
Omar Hegazy and Ben Kraaijenhagen
Pubblicato in:
2023
Editore:
HVTT Forum
Autori:
Alenka Beckers, Camiel Beckers, Paul Mentink, Igo Besselink, Steven Wilkins
Pubblicato in:
2023
Editore:
VPPC24
Autori:
Shantanu Pardhi; Sajib Chakraborty; Dai-Duong Tran; Mohamed El Baghdadi; Steven Wilkins; Omar Hegazy
Pubblicato in:
Energies, Vol 15, Iss 24, p 9557 (2022), Numero 2022, 15, 9557, 2022, ISSN 1996-1073
Editore:
Multidisciplinary Digital Publishing Institute (MDPI)
DOI:
10.3390/en15249557
Autori:
Ben Kraaijenhagen, Sten Wandel
Pubblicato in:
Transportation Research Procedia, Numero 72, 2024, ISSN 2352-1465
Editore:
Elsevier BV
DOI:
10.1016/j.trpro.2023.11.805
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile