CORDIS fournit des liens vers les livrables publics et les publications des projets HORIZON.
Les liens vers les livrables et les publications des projets du 7e PC, ainsi que les liens vers certains types de résultats spécifiques tels que les jeux de données et les logiciels, sont récupérés dynamiquement sur OpenAIRE .
Livrables
This deliverable comprises the design of an innovative and energy efficient HVAC system for the passenger cabin by elaborating and implementing a portfolio of measures for efficient cabin conditioning. Via a newly developed HMI the user can control the entire HVAC system.
Hydrogen storage (s’ouvre dans une nouvelle fenêtre)This deliverable focuses on the specification of the hydrogen storage for the FCEV demonstrator. Based on system simulations the target specifications and the detailed requirements for the hydrogen tank will be derived during project execution.
Scalable fuel cell system (s’ouvre dans une nouvelle fenêtre)This is the first revision of the DMP.
Data management plan (s’ouvre dans une nouvelle fenêtre)The DMP describes the data management life cycle for the data to be collected, processed and/or generated by EMPOWER. As part of making research data findable, accessible, interoperable and re-usable (FAIR), the DMP includes information on the handling of research data during & after the end of the project, what data will be collected, processed and/or generated, which methodology & standards will be applied, whether data will be shared/made open access, and how data will be curated & preserved (including after the end of the project).The DMP will be updated regularly throught the entire project.
Second revision of data management plan (s’ouvre dans une nouvelle fenêtre)This is the second revision of the DMP.
Quality standards and open data practices will be written down in a project handbook. This handbook will also including data- and risk management processes, as well as document templates of the EMPOWER project.
Second revision of dissemination, exploitation (including IPR) and communication activities (s’ouvre dans une nouvelle fenêtre)This is the second revision of the dissemination, exploitation (including IPR) and communication plan (D8.1). Ongoing activities are reported and the plan is adjusted if necessary.
Report on energy storage systems testing (s’ouvre dans une nouvelle fenêtre)This deliverable will deal with the reporting of the testing and validation of the developed battery systems for the FCEV and BEV demonstrators including the respective BMSs. Once the battery packs have been successfully assembled, battery tests on module- and pack level including BMS will be conducted to assure proper functionality of the battery systems.
First revision of dissemination, exploitation (including IPR) and communication activities (s’ouvre dans une nouvelle fenêtre)This is the first revision of the dissemination, exploitation (including IPR) and communication plan (D8.1). Ongoing activities are reported and the plan is adjusted if necessary.
LCA and TCO assessment of baseline vehicle (s’ouvre dans une nouvelle fenêtre)Report on LCA and TCO assessment of baseline vehicle
Dissemination, exploitation (including IPR) and communication plan (s’ouvre dans une nouvelle fenêtre)A dissemination strategy and communication plan as well as a plan for the exploitation of the EMPOWER project results will be developed at the beginning of the project. The IPR management activities are an integral part of the EMPOWER exploitation activities and will also be in this deliverable. The Dissemination, exploitation (including IPR) and communication plan will be updated constantly throughout the project.
Report on energy conversion systems testing (s’ouvre dans une nouvelle fenêtre)This deliverable comprises a vehicle connectivity and vehicle 2 grid communication concept. Furthermore eco-charging and eco-driving strategies are part of this deliverable.
Publications
Auteurs:
Spessa, E.
Éditeur:
EMPOWER
DOI:
10.5281/ZENODO.15703700
Auteurs:
Bäuml, T., & Dörr, E
Éditeur:
EMPOWER
DOI:
10.5281/ZENODO.15703663
Auteurs:
Bäuml, T.
Éditeur:
EMPOWER
DOI:
10.5281/ZENODO.15703671
Auteurs:
MICCIO, M., MATRAJI, I., TSIKONIS, L., MANCA DI VILLAHERMOSA, G., GUENTERT, N., STRIEDNIG, M., & CHIACCHIARARELLI, L.
Éditeur:
EMPOWER
DOI:
10.5281/ZENODO.15703727
Auteurs:
Spessa, E., Accardo, A., Costantino, T., Gentilucci, G., & Guichet, X.
Éditeur:
EMPOWER
DOI:
10.5281/ZENODO.15703512
Auteurs:
Spessa, E.
Éditeur:
EMPOWER
DOI:
10.5281/ZENODO.15703717
Auteurs:
Bäuml, T., & Dörr, E
Éditeur:
EMPOWER
DOI:
10.5281/ZENODO.15703643
Auteurs:
Trentalessandro Costantino, Matteo Acquarone, Federico Miretti, Ezio Spessa
Publié dans:
SAE Technical Paper Series, Numéro 1, 2025
Éditeur:
SAE International
DOI:
10.4271/2025-01-8591
Auteurs:
GENTILUCCI, Gaia; ACCARDO, ANTONELLA; Spessa, Ezio
Éditeur:
SAE
DOI:
10.4271/2024-24-0020
Auteurs:
Antonella Accardo, Gaia Gentilucci, Luca Pontone, Ezio Spessa
Publié dans:
IEEE Open Journal of Vehicular Technology, Numéro 6, 2025, ISSN 2644-1330
Éditeur:
Institute of Electrical and Electronics Engineers (IEEE)
DOI:
10.1109/OJVT.2025.3579221
Auteurs:
Gaia Gentilucci, Antonella Accardo, Ezio Spessa
Publié dans:
Transportation Research Interdisciplinary Perspectives, Numéro 32, 2025, ISSN 2590-1982
Éditeur:
Elsevier BV
DOI:
10.1016/J.TRIP.2025.101563
Auteurs:
Dominik Dvorak; Milan Kardos; Imre Gellai; Dragan Šimić
Publié dans:
World Electric Vehicle Journal, 2024, ISSN 2032-6653
Éditeur:
MDPI-AG
DOI:
10.3390/WEVJ16030129
Recherche de données OpenAIRE...
Une erreur s’est produite lors de la recherche de données OpenAIRE
Aucun résultat disponible