Resultados de proyectos
CORDIS proporciona enlaces a los documentos públicos y las publicaciones de los proyectos de los programas marco HORIZONTE.
Los enlaces a los documentos y las publicaciones de los proyectos del Séptimo Programa Marco, así como los enlaces a algunos tipos de resultados específicos, como conjuntos de datos y «software», se obtienen dinámicamente de OpenAIRE .
Resultado final
Provide data model specification for digital engineering of railway assets.
Use Cases for project demonstrations (se abrirá en una nueva ventana)This deliverable provides an overview of the Use Cases for all planned demonstrations in the project.
Project exploitation strategy (se abrirá en una nueva ventana)This report will outline the strategy for all the exploitation activities envisaged during the life of the project. The strategy will be updated when necessary, during the project.
Demonstration Strategy (se abrirá en una nueva ventana)This deliverable will cover a plan to set up and perform demonstrations, including timeline, alignment, dependencies. The strategy will act as a guideline for the project WPs and provide templates.
First report on KPI achievements and impact (se abrirá en una nueva ventana)First report on impact and KPI achievements based on Table ‘Performance Indicators for WS1’ pf Part B.
Integration of planning systems (se abrirá en una nueva ventana)This report is based on input from activities in tasks 4.1, 4.2, 4,3, 4.4, and 4.5 including the specification of interfaces and detailed use cases.
Process to collection of use cases and establishing cooperation with all Destinations and System Pillar (se abrirá en una nueva ventana)Process describing the systematic acquisition of Use Cases digital models and processes from all FAs; including the requirement capture, synthetization, and allocation to the corresponding executor.
TMS and ATO/C-DAS timetable test & simulation environment (se abrirá en una nueva ventana)This report is based on the input of Tasks 15.4 and 15.5. Development of TMS and ATO/C-DAS timetable test & simulation environment to enable optimisation algorithm, capacity and human-factors research including human factor research methodologies on rating them in this environment.
Federated data space “Sandbox-Environment” description (se abrirá en una nueva ventana)Technical description of federated data space “Sandbox-Environment” describing the technical components, operations and required resources.
Workplan for collaboration with other EU-RAIL Destinations (se abrirá en una nueva ventana)This workplan captures the specific requirements and delivery schedules of this project with other EU-RAIL Destinations. This document will be updated when applicable.
Report on the description of algorithms for long-term timetabling, short-term timetabling and rolling stock planning (se abrirá en una nueva ventana)This deliverable is based on the input from tasks 6.1, 6.2, 6.3 and 6.4 in WP6.
Developed simulation methods and models for capacity evaluation of ETCS and C-DAS/ATO (se abrirá en una nueva ventana)The report is based on input from task 8.4 and describes the developed simulation methods and models for capacity evaluations of ETCS and C-DAS/ATO.
Description of metrics and methodology used for assessment of KPI achievements and impact (se abrirá en una nueva ventana)This report describes the metrics and methodology to calculate the contribution of project developments to the technical KPIs and the contribution to impacts set in the MAWP. It also includes an initial assessment based on available specifications for technical solutions.
Specification Report of Enablers 18 - 27 (se abrirá en una nueva ventana)This deliverable is based on the outcome of tasks 19.1 to 19.9 and includes the high-level design, architecture and use cases for the planned developments. It contains an analysis of available data and summary of the status quo of existing technologies.
Specification of selected Processes and Communication between applications (se abrirá en una nueva ventana)This report is based on the input of Task 11.2. The deliverable presents the specification of processes and communication requirements with regards to data elements needed for an interoperable data exchange addressed within the work package.
Report: The need for future development of methods and models for capacity simulations and feedback loops between planning and operations (se abrirá en una nueva ventana)The report is based on input from task 8.2 and includes research on the need of development of relevant capacity simulation methods and models and feedback loops between planning and operations including TMS-C-DAS/ATO.
Final exploitation (se abrirá en una nueva ventana)Report summarising all communication, dissemination and exploitation activities and their impact. A Results Ownership List will be set-up, completed and released at the end of the project. The first version released M12 and updated during project until the final version M46.
Requirements Specification for Automated Decisions and Decision Support for Traffic Management optimisation (se abrirá en una nueva ventana)This report is based on the input of Task 17.1. This deliverable provides a report on the detailed functional, non-functional and operational requirements for Real Time Conflict Identification, Decision Support and automated/semi-automated Resolution. including the criteria for benchmarking of the developed algorithms that shows the suitability of each of the developed algorithms for specific applications.
Use case specification and requirement specification for disruption management (se abrirá en una nueva ventana)This report is based on the input of Tasks 13.5 and 13.6. The report will specify the use cases and the requirements for the DSS for disruption management.
Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 11-18 (se abrirá en una nueva ventana)This report is based on the input of Tasks 10.1 and 10.2. It report identifies sources in previous international projects dealing with TMS development and integration and the trends of the market for such type of projects. Based on the needs of WPs 11, 13, 15, 17, the high-level use cases for future TMS enhancements are presented. And then, based on those and on the assigned requirements, high-level designs for each demonstrator are also shown.
Developed methods and models for evaluating feedback loops between planning and operations (se abrirá en una nueva ventana)The report is based on input from task 8.3 and describes the developed simulation environment for micro and macro simulation and the developed methods for analysing historical data from operations to improve capacity evaluations.
Project dissemination and communication plan (se abrirá en una nueva ventana)This report will outline the plan for all the communication and dissemination activities envisaged during the life of the project. The DC-plan will be updated when necessary, during the project.
Requirements for the deployment of TMS linked with ATO/C-DAS (se abrirá en una nueva ventana)This report is based on the input of Tasks 15.2 and 15.3. It is setting up requirements for innovations in TMS – ATO/C-DAS including relevant and needed state-of-the-art.
Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 4-9 (se abrirá en una nueva ventana)This report is based on the input from tasks 3.1, 3.2 and 3.3. It will present high level use cases, requirements and plans for the demonstrators in WS1.1 Planning.
Use Cases for planned technical developments of the project (se abrirá en una nueva ventana)This deliverable provides an overview of the high-level Use Cases of all planned technical developments and an analysis report about data availability in prototype environments.
Publicaciones
Autores:
A. Sansiñena, B. Rodríguez-Arana, S. Arrizabalaga
Publicado en:
Civil-Comp Conferences, Proceedings of the Seventh International Conference on
Railway Technology:
Research, Development and Maintenance, Edición 15, 2026
Editor:
Civil-Comp Press
DOI:
10.4203/CCC.15.8.2
Autores:
Matteo Cardellini, Enrico Giunchiglia, Davide Anguita, Carmelo Lofiego, Luca Oneto, Pietro Ratto
Publicado en:
Proceedings of the TwentyThird International Conference on Principles of Knowledge Representation and Reasoning, 2026
Editor:
International Joint Conferences on Artificial Intelligence Organization
DOI:
10.24963/KR.2026/68
Autores:
Álvaro Cidoncha, Adrián Fernández-Rodríguez, Asunción P. Cucala, Antonio Fernández-Cardador, Jorge Gorostiza-Herrero
Publicado en:
IEEE Access, Edición 14, 2026, ISSN 2169-3536
Editor:
Institute of Electrical and Electronics Engineers (IEEE)
DOI:
10.1109/ACCESS.2026.3690017
Autores:
Matteo Cardellini, Marco Maratea, Mauro Vallati, Gianluca Boleto, Luca Oneto
Publicado en:
Proceedings of the International Symposium on Combinatorial Search, Edición 12, 2022, ISSN 2832-9163
Editor:
Association for the Advancement of Artificial Intelligence (AAAI)
DOI:
10.1609/SOCS.V12I1.18568
Autores:
Ibon Erdozain, Blas Blanco, Luis Baeza, Asier Alonso
Publicado en:
Annual Conference of the PHM Society, Edición 15, 2023, ISSN 2325-0178
Editor:
PHM Society
DOI:
10.36001/PHMCONF.2023.V15I1.3564
Autores:
Bishal Sharma, Bianca Pascariu, Paola Pellegrini, Joaquin Rodriguez
Publicado en:
Transportation Research Procedia, Edición 95, 2026, ISSN 2352-1465
Editor:
Elsevier BV
DOI:
10.1016/J.TRPRO.2026.02.058
Autores:
Marta Leonina Tessitore, Marcella Samà, Giorgio Sartor, Carlo Mannino, Dario Pacciarelli
Publicado en:
Transportation Research Procedia, Edición 95, 2026, ISSN 2352-1465
Editor:
Elsevier BV
DOI:
10.1016/J.TRPRO.2026.02.051
Autores:
Philipp Widmann, Norman Weik
Publicado en:
Public Transport, 2026, ISSN 1866-749X
Editor:
Springer Science and Business Media LLC
DOI:
10.1007/S12469-026-00425-1
Autores:
Anthony Jnr. Bokolo
Publicado en:
Sustainable Cities and Society: Advances, Edición 2, 2026, ISSN 3051-052X
Editor:
Elsevier BV
DOI:
10.1016/J.SCSADV.2026.100079
Buscando datos de OpenAIRE...
Se ha producido un error en la búsqueda de datos de OpenAIRE
No hay resultados disponibles