Provide data model specification for digital engineering of railway assets.
Use Cases for project demonstrations (si apre in una nuova finestra)This deliverable provides an overview of the Use Cases for all planned demonstrations in the project.
Demonstrator report (si apre in una nuova finestra)This deliverable is based on the input from results in tasks 5.2 and 5.3 with sections assigned to each demonstrator developed in task 5.2 and includes the evaluation and conclusion of task 5.3.
Demonstrations of TMS functionality for improved C-DAS operations (si apre in una nuova finestra)This report is based on the input of Task 16.3. The report on the outputs/conclusions/ recommendations of the emulated and “Live” demonstrations of TMS functionality for improved C-DAS operations.
Project exploitation strategy (si apre in una nuova finestra)This report will outline the strategy for all the exploitation activities envisaged during the life of the project. The strategy will be updated when necessary, during the project.
Guidelines and specifications for developing and maintaining Digital Twin (si apre in una nuova finestra)Description of BIM/AIM data acquisition, updating and modelling for guidance on Digital Twins creation, development and updating.
Demonstration Strategy (si apre in una nuova finestra)This deliverable will cover a plan to set up and perform demonstrations, including timeline, alignment, dependencies. The strategy will act as a guideline for the project WPs and provide templates.
First report on KPI achievements and impact (si apre in una nuova finestra)First report on impact and KPI achievements based on Table ‘Performance Indicators for WS1’ pf Part B.
Integration of planning systems (si apre in una nuova finestra)This report is based on input from activities in tasks 4.1, 4.2, 4,3, 4.4, and 4.5 including the specification of interfaces and detailed use cases.
Services for inclusive rail-based mobility - Demonstration Plan (si apre in una nuova finestra)This deliverable is a collection of demonstration plans for all demonstrations included in WP23 (tasks 23.1 to 23.4). It covers specific use cases for the planned demonstrations, a specific testing strategy and timeline, as well as a demonstration implementation and execution timeline. Further topics are the expected outcomes and risk management for each demonstration.
Process to collection of use cases and establishing cooperation with all Destinations and System Pillar (si apre in una nuova finestra)Process describing the systematic acquisition of Use Cases digital models and processes from all FAs; including the requirement capture, synthetization, and allocation to the corresponding executor.
Integrate Rail with other transport modes - Analysis and assessment of Demonstration Results (si apre in una nuova finestra)This deliverable covers a detailed analysis and assessment of the performed demonstrations in WP21. Expected outcomes are compared to the documented results. All demonstrations are covered as chapters within this deliverable.
TMS and ATO/C-DAS timetable test & simulation environment (si apre in una nuova finestra)This report is based on the input of Tasks 15.4 and 15.5. Development of TMS and ATO/C-DAS timetable test & simulation environment to enable optimisation algorithm, capacity and human-factors research including human factor research methodologies on rating them in this environment.
Federated data space “Sandbox-Environment” description (si apre in una nuova finestra)Technical description of federated data space “Sandbox-Environment” describing the technical components, operations and required resources.
Updated Conceptual Data Model / Common Domain Ontology specification (si apre in una nuova finestra)Extensions to Conceptual Data Model / Common Domain Ontology.
Workplan for collaboration with other EU-RAIL Destinations (si apre in una nuova finestra)This workplan captures the specific requirements and delivery schedules of this project with other EU-RAIL Destinations. This document will be updated when applicable.
Report on the description of algorithms for long-term timetabling, short-term timetabling and rolling stock planning (si apre in una nuova finestra)This deliverable is based on the input from tasks 6.1, 6.2, 6.3 and 6.4 in WP6.
Developed simulation methods and models for capacity evaluation of ETCS and C-DAS/ATO (si apre in una nuova finestra)The report is based on input from task 8.4 and describes the developed simulation methods and models for capacity evaluations of ETCS and C-DAS/ATO.
Report: Capacity studies of optimised ETCS Level 2, Hybrid Level 3 and C-DAS/ATO (si apre in una nuova finestra)The report is based on the input from task 9.2 and describes the potential capacity impact of the application of new technologies like ETCS Level 2, Hybrid Level 3 and C-DAS/ATO.
Description of metrics and methodology used for assessment of KPI achievements and impact (si apre in una nuova finestra)This report describes the metrics and methodology to calculate the contribution of project developments to the technical KPIs and the contribution to impacts set in the MAWP. It also includes an initial assessment based on available specifications for technical solutions.
Specification Report of Enablers 18 - 27 (si apre in una nuova finestra)This deliverable is based on the outcome of tasks 19.1 to 19.9 and includes the high-level design, architecture and use cases for the planned developments. It contains an analysis of available data and summary of the status quo of existing technologies.
Specification of selected Processes and Communication between applications (si apre in una nuova finestra)This report is based on the input of Task 11.2. The deliverable presents the specification of processes and communication requirements with regards to data elements needed for an interoperable data exchange addressed within the work package.
Report: The need for future development of methods and models for capacity simulations and feedback loops between planning and operations (si apre in una nuova finestra)The report is based on input from task 8.2 and includes research on the need of development of relevant capacity simulation methods and models and feedback loops between planning and operations including TMS-C-DAS/ATO.
Demonstrations by Human-in-the-loop simulator (si apre in una nuova finestra)This report is based on the input of Task 16.4. The report on the outputs/ conclusions/ recommendations of the emulated “Live” demonstrations by Human-in-the-loop simulator showing collaboration feasibility of the developed concept and (analysed human-factors) impact on involved actors in the process and algorithm test-bench results;
Use case, requirements, constraints and specificalities of data exchange structures for all Destinations (si apre in una nuova finestra)Documentation of data requirements received from WP26 and of needed extensions to CDM specifications as a result. Specification of open standard data exchange structure to serialize instances of CDM concepts.
Final exploitation (si apre in una nuova finestra)Report summarising all communication, dissemination and exploitation activities and their impact. A Results Ownership List will be set-up, completed and released at the end of the project. The first version released M12 and updated during project until the final version M46.
Anticipate demand leading to improved resource utilisation - Analysis and assessment of Demonstration Results (si apre in una nuova finestra)This deliverable covers a detailed analysis and assessment of the performed demonstrations of Enablers 23-27 in WP25. Expected outcomes are compared to the documented results. All demonstrations are covered as chapter within this deliverable.
Requirements Specification for Automated Decisions and Decision Support for Traffic Management optimisation (si apre in una nuova finestra)This report is based on the input of Task 17.1. This deliverable provides a report on the detailed functional, non-functional and operational requirements for Real Time Conflict Identification, Decision Support and automated/semi-automated Resolution. including the criteria for benchmarking of the developed algorithms that shows the suitability of each of the developed algorithms for specific applications.
Use case specification and requirement specification for disruption management (si apre in una nuova finestra)This report is based on the input of Tasks 13.5 and 13.6. The report will specify the use cases and the requirements for the DSS for disruption management.
Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 11-18 (si apre in una nuova finestra)This report is based on the input of Tasks 10.1 and 10.2. It report identifies sources in previous international projects dealing with TMS development and integration and the trends of the market for such type of projects. Based on the needs of WPs 11, 13, 15, 17, the high-level use cases for future TMS enhancements are presented. And then, based on those and on the assigned requirements, high-level designs for each demonstrator are also shown.
Repository of use cases, digital models and processes collected from all Destinations (si apre in una nuova finestra)Repository for reviewed, formal and harmonised documentation of collected use cases, digital models and digital processes from all Destinations.
Report on TMS integration Demonstrators (si apre in una nuova finestra)The deliverable includes the output of WP12 demonstrators with sections assigned to each demonstrator being developed in task 12.2.
Developed methods and models for evaluating feedback loops between planning and operations (si apre in una nuova finestra)The report is based on input from task 8.3 and describes the developed simulation environment for micro and macro simulation and the developed methods for analysing historical data from operations to improve capacity evaluations.
Project dissemination and communication plan (si apre in una nuova finestra)This report will outline the plan for all the communication and dissemination activities envisaged during the life of the project. The DC-plan will be updated when necessary, during the project.
Requirements for the deployment of TMS linked with ATO/C-DAS (si apre in una nuova finestra)This report is based on the input of Tasks 15.2 and 15.3. It is setting up requirements for innovations in TMS – ATO/C-DAS including relevant and needed state-of-the-art.
Mapping against scope, specification of technical enablers, high-level use cases, high-level requirements, high level design for demonstrators in WPs 4-9 (si apre in una nuova finestra)This report is based on the input from tasks 3.1, 3.2 and 3.3. It will present high level use cases, requirements and plans for the demonstrators in WS1.1 Planning.
Report: Evaluation of developed models for feedback loops between planning and operations (si apre in una nuova finestra)The report is based on input from task 9.1, where the developed models are applied in real use cases and evaluated.
Use Cases for planned technical developments of the project (si apre in una nuova finestra)This deliverable provides an overview of the high-level Use Cases of all planned technical developments and an analysis report about data availability in prototype environments.
Report of the demonstrators of algorithms for long-term timetabling, short-term timetabling and rolling stock planning (si apre in una nuova finestra)This deliverable is particularly based on input from tasks 7.3, 7.4 and 7.5.and describes the output of the different tasks in WP7.
This deliverable provides a report of demonstrators developed as part of T17.2 and demonstrated in T18.2. This report includes the benchmarking of the developed algorithms showing the suitability of each of them for specific applications.
Digital assets engineering reference demonstration outcomes (si apre in una nuova finestra)Five Reference demonstration outcomes demonstrating feasibility of the output from task 27.1,27.2,27.3 using multiple datasets from different European countries applied to CCS+ use cases.
Pubblicazioni
Autori:
A. Sansiñena, B. Rodríguez-Arana, S. Arrizabalaga
Pubblicato in:
Civil-Comp Conferences, Proceedings of the Seventh International Conference on
Railway Technology:
Research, Development and Maintenance, Numero 15, 2026
Editore:
Civil-Comp Press
DOI:
10.4203/CCC.15.8.2
Autori:
Matteo Cardellini, Enrico Giunchiglia, Davide Anguita, Carmelo Lofiego, Luca Oneto, Pietro Ratto
Pubblicato in:
Proceedings of the TwentyThird International Conference on Principles of Knowledge Representation and Reasoning, 2026
Editore:
International Joint Conferences on Artificial Intelligence Organization
DOI:
10.24963/KR.2026/68
Autori:
Álvaro Cidoncha, Adrián Fernández-Rodríguez, Asunción P. Cucala, Antonio Fernández-Cardador, Jorge Gorostiza-Herrero
Pubblicato in:
IEEE Access, Numero 14, 2026, ISSN 2169-3536
Editore:
Institute of Electrical and Electronics Engineers (IEEE)
DOI:
10.1109/ACCESS.2026.3690017
Autori:
Matteo Cardellini, Marco Maratea, Mauro Vallati, Gianluca Boleto, Luca Oneto
Pubblicato in:
Proceedings of the International Symposium on Combinatorial Search, Numero 12, 2022, ISSN 2832-9163
Editore:
Association for the Advancement of Artificial Intelligence (AAAI)
DOI:
10.1609/SOCS.V12I1.18568
Autori:
Ibon Erdozain, Blas Blanco, Luis Baeza, Asier Alonso
Pubblicato in:
Annual Conference of the PHM Society, Numero 15, 2023, ISSN 2325-0178
Editore:
PHM Society
DOI:
10.36001/PHMCONF.2023.V15I1.3564
Autori:
Bishal Sharma, Bianca Pascariu, Paola Pellegrini, Joaquin Rodriguez
Pubblicato in:
Transportation Research Procedia, Numero 95, 2026, ISSN 2352-1465
Editore:
Elsevier BV
DOI:
10.1016/J.TRPRO.2026.02.058
Autori:
Marta Leonina Tessitore, Marcella Samà, Giorgio Sartor, Carlo Mannino, Dario Pacciarelli
Pubblicato in:
Transportation Research Procedia, Numero 95, 2026, ISSN 2352-1465
Editore:
Elsevier BV
DOI:
10.1016/J.TRPRO.2026.02.051
Autori:
Philipp Widmann, Norman Weik
Pubblicato in:
Public Transport, 2026, ISSN 1866-749X
Editore:
Springer Science and Business Media LLC
DOI:
10.1007/S12469-026-00425-1
Autori:
Anthony Jnr. Bokolo
Pubblicato in:
Sustainable Cities and Society: Advances, Numero 2, 2026, ISSN 3051-052X
Editore:
Elsevier BV
DOI:
10.1016/J.SCSADV.2026.100079
È in corso la ricerca di dati su OpenAIRE...
Si è verificato un errore durante la ricerca dei dati su OpenAIRE
Nessun risultato disponibile