Deliverables
This deliverable will contain a set of documents defining user freight specific user requirements for all automation process subproject tasks e.g., automatic functions, ATO GoA 3/4 specification, safe perception system and remote driving
List of use case definitions and requirementsRequirements and use cases for development, engineering, commissioning, maintenance and refurbishment in the context of DevOps and architectural evolution
List of use cases for the Onboard Communication NetworkUse cases from the perspective of all relevant stakeholders (manufacturers, sub system suppliers, railway undertakings)
Intermediate Modular Platform requirements, architecture and specificationThis deliverable will capture an intermediate stage of the derived requirements on Modular Platforms, and the derived architecture and specification, for instance serving as input to the Onboard Platform Demonstrator in WP 36
Automation Processes collaboration mapThis deliverable will provide a comprehensive list of interfaces and exchanged items between this subproject and other internal and external stakeholders
Operational use cases collectionCollection of operational uses cases for demonstration of DATO in urban environment
Documentation of use cases for automating functionsThis deliverable will contain a report about actual existing and specified automatedfunctions, tasks or related use cases with annotated target component as scope, a draft release for set of documents including analysis based on first input from SP and related Fas (e.g., regarding demonstrators) and definition for relevant use cases, operational parameters and scenarios in scope of passenger/freight and tramway applications
Documentation of Use Cases for remote drivingThis deliverable will contain a set of documents including analysis based on first input from SP and related Fas (e.g., regarding demonstrators) and definition for relevant use cases, operational parameters and scenarios in scope of passenger/freight/inspection vehicles and tramway applications
Documentation of use cases for perception systemThis deliverable will provide a list of use cases and their expected behaviour which in turn will be translated to develop the requirements for the Perception system – required for Automatic Train Operation in Mainline/Regional Line/Stabling & Shunting, Freight and Urban/Light Rail applications
ATO GoA3/4 Specifications review documentationThis deliverable will contain a review of existing specifications and previous projects outcome. Analysis of gaps (e.g. for freight) and inputs from the System Pillar will be part of the deliverable too
Documentation of urban user cases and operational rules for automation processThis deliverable will contain a set of documents defining harmonized urban use cases and operational rules for all automation process subproject TE
Lessons learnt report on approval processes for automated tramwaysGuideline for future approval processes in urban environment
Consolidate prior research works incl. Proposal on integration of ACS components in FRMCSIn this report, it will be described how prior and ongoing activities on FRMCS and ACS relate, how a maximum extent of synergies among the concepts can be leveraged in the remainder of this WP, and how ACS concepts going beyond the FRMCS architecture and functionality can prospectively be integrated into the FRMCS system
Collection of test cases and validation criteria (WP41)Collection of test cases and validation criteria for remote driving of tramways demonstrator
Specification of the Digital Register implementation(s) required in FP2-R2DATOIn this deliverable, all concrete Digital Register implementations that will be needed for different demonstrators, and for other Technical Enablers such as Data Factory, will be specified
Analysis of applicability of solution approaches within the railway vehicle domainReport on the applicability of approaches on evolvability from other domains, e.g. IT systems
High-level consolidation of prior work and agreement on the Modular Platform specification to happen in FP2-R2DATOThis deliverable will provide a high-level consolidation of the prior work related to Modular Platforms and will capture the agreements of the partners regarding which aspects related to Modular Platforms will be specified within R2DATO
Searching for OpenAIRE data...
There was an error trying to search data from OpenAIRE
No results available